Second Notice | | 4/5/2013 | 4/22/2013 | | DONE |
|
|
|
old permit
|
First Notice | 3/13/2013 | 3/13/2013 | 3/26/2013 | | DONE |
Dave Hannah
|
|
|
mailed 3-26
|
BLD-Aging Inspection | 3/12/2013 | 3/13/2013 | 3/13/2013 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/13/2013 | 3/13/2013 | 3/13/2013 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 3/30/2011 | 3/31/2011 | 3/31/2011 | A | PART |
Dave Hannah
|
|
|
lance - steel beams to be inspected Phone #: ###-#### ok but need spec. inspection on a325 bolting
|
BLD-Other | 3/8/2011 | 3/9/2011 | 3/9/2011 | P | PART |
Dave Hannah
|
|
|
lance - steel posts inspection Phone #: ###-#### base plates have been dry packed ok to cover in basement
|
BLD-Footing | 3/1/2011 | 3/2/2011 | 3/2/2011 | A | PASS |
Dave Hannah
|
|
|
Late morning--Lance Phone #: ###-####
|
BLD-Footing | 2/15/2011 | 2/16/2011 | 2/16/2011 | A | PASS |
Dave Hannah
|
|
|
lance Phone #: ###-#### ok to pour first three column ftgs
|
Issue PAID IN FULL permit | | | 2/8/2011 | | DONE |
Christina Prado
|
|
|
|
Routing Off Site - STRUCTURAL | 2/2/2011 | | 2/4/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after 3rd structural review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/4/2011 | | DONE |
|
|
|
t/c w matt - permit ready and fees given
|
Override - Parcel Holds | | | 2/4/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 2/4/2011 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/21/2010 | | 2/4/2011 | | PASS |
Carl Westfall
|
|
|
1st review done
|
Routing - PLAN CHECK | 1/28/2011 | | 2/4/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Routing Off Site - STRUCTURAL | 2/1/2011 | | 2/2/2011 | | FAIL |
Carl Westfall
|
|
|
The Consultant Structural Engineer could not read the calculations because they were to faint.
|
Telephone call | | | 2/2/2011 | | DONE |
|
|
|
The Consultant Structural Engineer called and said that the structural calculations were so light that he could not read them. Called the Architect and asked for calculations that could be read. (08:10 AM)
|
Plan resubmittals received | | | 2/2/2011 | | DONE |
|
|
|
received 3 structural calcs sent to Carl W.
|
Plan resubmittals received | | | 2/1/2011 | | |
Barbara Stitt
|
|
|
Received 1 response letter from Matt Rhees dated 1-31-11, 3 copies of structural calcs, 3 copies of sheet A1.1 and taken to Carl Westfall's desk
|
Routing - PLAN CHECK | 1/4/2011 | | 1/28/2011 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd plan review. E-mailed the concerns of the Consultant Structural Engineer to the Architect.
|
Routing Off Site - STRUCTURAL | 1/19/2011 | | 1/27/2011 | | FAIL |
Carl Westfall
|
|
|
The revised design was NOT approved by the Consultant Structural Engineer. Revised drawings and additional calculations were required.
|
Telephone call | | | 1/19/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 1/18/2011 | | DONE |
Barbara Stitt
|
|
|
received 1 copy of quitclaim deed and taken to Carl Westfall's desk
|
Plan resubmittals received | | | 1/12/2011 | | DONE |
|
|
|
received 1 response,3 structural calcs,2 copies of sheets A1.0,A1.1 sent to Carl W.
|
Route to Impact Fee Review | 12/30/2010 | 1/5/2011 | 1/10/2011 | | PASS |
Cindy M. Gould
|
|
|
Structural changes no impact fees
|
Routing - FIRE | 12/30/2010 | 12/30/2010 | 1/4/2011 | | PASS |
Scott Arellano
|
|
|
No seperate review comments.
|
1st review completed | | | 1/4/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 12/21/2010 | | 12/30/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on December 28, 2010 and finished on December 30, 2010. Revised drawings and structural calculations were required. See the plan review report.
|
Routing Off Site - STRUCTURAL | 12/21/2010 | | 12/27/2010 | | FAIL |
Carl Westfall
|
|
|
The original design was NOT approved by the Consultant Structural Engineer.
|
Telephone call | | | 12/21/2010 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Intake Approval | | | 12/21/2010 | | PASS |
Tim L. Woodard
|
|
|
Approved intake. Architect has certified he complies with form # 707 and didn't provide erosion info. Fire was ok without the Fire flow for this submittal. Engineer did not address siesmic. Engineer didn't think it was applicable.
|
Pending Assignment by JCB | 12/21/2010 | | 12/21/2010 | | DONE |
Jason Blais
|
|
|
|
Application received | | 12/20/2010 | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|