Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-02928
StatusFinaled
Name SHY-BEE DESIGN
Site Address 3590 E PARKCENTER
Project NameHARRIS RANCH IRRIGATION BARN
Customer Number 
ePlanReviewNo
Description
(HARRIS RANCH IRRIGATION BARN) ***4-5-12 PLAN MODIFICATION TO INCLUDE: REVISE THE LOCATION OF THE RESTROOM AND JANITOR ROOM; REMOVE A PAIR OF DOORS; AND ADD A FLOOR DRAIN PER THE APPROVED PLANS. SRZ*** To construct a new 1,567 square foot, One story, wood framed, irrigation barn. This structure will have a pump room for the irrigation pump, a maintenance room, janitors closet, and a fully accessible Unisex restroom. The construction of Future work noted on the plans for the kitchenette, storage, new dual height (hi-lo) accessible drinking fountain, and 2nd restroom is not part of this permit and will require separate permits. Work to include: Construct the building per plans; install a service sink; HVAC/mechanical work, electrical work, and plumbing work per plans; and interior finish work in compliance with chapter 8 of the 2006 IBC. This building is NOT fire sprinklered. All work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/23/20133/22/2013 DONE
old permit
BLD-Aging Inspection3/13/20133/13/20133/13/2013 PASS
DetailsDave Hannah
DOC - Permit Finaled3/13/20133/13/20133/13/2013APASS
DetailsDave Hannah
Permanent Occupancy UNPAID FEE  3/13/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  3/12/2013 DONE
DetailsBarbara Stitt
BLD-Final6/25/20126/26/20126/26/2012APASS
DetailsDave Hannah
TIM Phone #: ###-####
FIRE-Final Inspection6/21/20126/22/20126/22/2012APASS
DetailsForrest France
C/N items finished. Life safety passed.
PubWorks Occupancy Approval6/22/20126/22/20126/22/2012 DONE
DetailsTiffany Lowery
Zoning Approval6/21/20126/21/20126/22/2012 PASS
DetailsJosh Wilson
FIRE-Final Inspection6/20/20126/20/20126/20/2012PFAIL
DetailsForrest France
Door hardware and signage need revised as discussed.
BLD-Final6/19/20126/19/20126/19/2012PNR
DetailsJim Sly
jim Phone #: ###-####
Called Tim Need finals from P/.W ACHD Zoning Fire.......Etc.
BLD-Framing/Rough-in5/7/20125/8/20125/8/2012PPART
DetailsDave Hannah
tim Phone #: ###-#### ok to cover restroom and office
BLD-Wall Bracing4/18/20124/19/20124/19/2012APASS
DetailsDave Hannah
Shear inspection - - TIm Phone #: ###-####
Override - Parcel Holds4/18/20121/1/19004/18/2012  
Shear wall
BLD-Wall Bracing4/16/20124/16/20124/16/2012PFAIL
DetailsDave Hannah
TIM Phone #: ###-#### plans call out nails crew used staples also need same thing from engineer on location of panels wording on plans sounds like the hole bldg is sheared ?
Override - Parcel Holds4/16/20121/1/19004/16/2012  
per Tim Scheibe this inspection has nothin to do with the plan mod
Plan assigned to (SRZ)4/5/20124/5/20124/5/2012 PASS
DetailsSam Zahorka
Routing - PLAN CHECK4/5/2012 4/5/2012 PASS
DetailsSam Zahorka
Plan modification approved.
PLANS/APPL TAKEN TO FRONT DESK  4/5/2012 DONE
DetailsSam Zahorka
Case Summary (BLD)  4/5/2012 DONE
DetailsSam Zahorka
Print Occupancy Form  4/5/2012 DONE
Telephone call  4/5/2012 DONE
DetailsTisha Gallop
called Jack Davis and left vm plan mod is ready and fee.
Override - Parcel Holds  4/5/2012  
Permit Ready to Issue  4/5/2012 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  4/5/2012 DONE
DetailsBarbara Stitt
(F) Reprint permit  4/5/2012 DONE
DetailsBarbara Stitt
Case Summary (BLD)  4/5/2012 DONE
DetailsSam Zahorka
Plan Modification Accepted  4/5/2012 DONE
DetailsChristina Prado
PLAN MOD** Submitted to revise the configuration of restroom, janitor room and add a new floor drain. Plans sheets effected are A2.0. Plans given to Sam Zarhorka for review
BLD-Foundation3/27/20123/28/20123/28/2012APASS
DetailsDave Hannah
Ian Phone #: ###-####
BLD-Footing3/27/20123/27/20123/27/2012PPASS
DetailsDave Hannah
BLD-Foundation3/26/20123/27/20123/27/2012ACANC
DetailsDave Hannah
Phone #: 8604101 >> Inspection requested via mobile web by dane
BLD-Foundation3/20/20123/22/20123/22/2012PCANC
DetailsDave Hannah
Ian Phone #: ###-####
BLD-Footing3/20/20123/21/20123/21/2012PCANC
DetailsDave Hannah
Ian Phone #: ###-####
(F) Reprint permit  3/12/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/18/2011 DONE
Routing Off Site - STRUCTURAL3/28/2011 4/4/2011 PASS
DetailsSam Zahorka
Sheets S3.0, S4.0, resub sheet and calculations.
Passed with comments. See Structural Plan Check Review Comments attached to plans, and scanned under documents.
Routing - PLAN CHECK4/4/2011 4/4/2011 PASS
DetailsSam Zahorka
Passed with structural review comments attached to plans and scanned under documents.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  4/4/2011 DONE
Permit Ready to Issue  4/4/2011  
Telephone call  4/4/2011 DONE
4-4-11 called Jeremy permit ready and fee given. Also need GC,ACHD,RP ///DLD
Plan assigned to (SRZ)12/22/2010 4/4/2011 PASS
DetailsSam Zahorka
Routing - PLAN CHECK3/25/2011 3/28/2011 FAIL
DetailsSam Zahorka
Recieved corrections for structural. ROuted to the outsource structural reviewer.
Routed plans to Planning and Zoning also.
Routing - PLANNING3/28/2011 3/28/2011 PASS
DetailsJosh Wilson
OK per DRH11-00030
Telephone call  3/28/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals received  3/25/2011 DONE
DetailsTisha Gallop
received three coipes of respone and structural calcs, and three copes of plan sheets S3.0, S4.0; inserted by arch. rep. and taken back to Sam Zahorka.
Routing - PUBLIC WORKS3/16/2011 3/25/2011 PASS
DetailsBeverly Mountain
New Civil Sheets added. ?
Routing PW Street Lights3/17/2011 3/25/2011 PASS
DetailsHank Alarcon
Routing - PLAN CHECK3/15/2011 3/21/2011 FAIL
DetailsSam Zahorka
Routing - PLUMBING3/14/2011 3/15/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLAN CHECK1/25/2011 3/14/2011 FAIL
DetailsSam Zahorka
Received resubmittal sheets for Plumbing and Public Works. Routed to Plumbing. Still waiting for structural review, Planning and Zoning corrections.
Plan resubmittals received  3/11/2011 DONE
DetailsTisha Gallop
received two copies of plan sheets C-1, P1.0, P2.0, and five copies of plan sheet 11.2(civil); inserted into plans by plan tech. on 3/14/11 and taken back to Sam Zahorka.
Telephone call  2/7/2011 DONE
DetailsSam Zahorka
Called Jeremy Bastow the architect to check on the status of the correction resubmittals. He stated he never received my email so I resent it to him. I gave him Plumbing reviews telephone number to verify what they needed. SRZ
Route to Impact Fee Review1/21/20111/26/20111/25/2011 PASS
DetailsCindy M. Gould
Routing - FIRE1/21/20111/21/20111/25/2011 PASS
DetailsTim Frost
Please, attached review
1st review completed  1/25/2011 DONE
Failed - Planning, Plan Check, Plumbing
Telephone call  1/21/2011 DONE
DetailsSam Zahorka
Spoke with Jeremy Bastow the Architect for this project about the intended use of this structure. He stated for the time being it would be used and occupied as a pump storage/maintenance/storage building but, at some time in the future the owners wanted to use it as a meeting place. I verified with him this permit is not for the future assembly use and that future permits for the change of occupancy will be required. He agreed. I requested him to let the applicant know and red-lined the plans to state "No assembly use allowed. All future work noted on the plans will require separate permits." Also got his permission to red-line the slab edge insulation on wall sections. Slab edge insulation is required to extend from the top of the slab. SRZ
Routing - PLAN CHECK1/10/2011 1/21/2011 FAIL
DetailsSam Zahorka
Failed structural review. Routed to FIre.
Telephone call  1/20/2011 DONE
DetailsSam Zahorka
Left message. waiting for a returned telephone call from the architect. Need to verify the intended use of the structure. Plans possibly represent other uses/functions of space other than a just a irrigation barn to house a pump. SRZ
Case Summary (BLD)  1/20/2011 DONE
DetailsSam Zahorka
Telephone call  1/19/2011 DONE
DetailsSam Zahorka
Called the architect to verify the intended use of this structure. Left message.
Routing - PLANNING1/7/2011 1/10/2011 FAIL
DetailsSarah Schafer
No staff level Design Review application has been submitted for this project. I contacted Jeremy Barstow and let him know that according to 11-23-06 a staff level DR was required.
Routing - PLUMBING1/6/2011 1/7/2011 FAIL
DetailsBill VanDegrift
provide a site plan showing the sewer and water services. increase venting to 7.0686 sq. in.
Routing Off Site - STRUCTURAL12/22/2010 1/7/2011 FAIL
DetailsJohn Menard
Corrections from outsourced engineer recieved and sent to the design proffessional.
Routing - PUBLIC WORKS12/27/2010 1/6/2011 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment1/6/2011 1/6/2011 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00921
Routing PW Sewer Design1/5/2011 1/5/2011 PASS
DetailsMike Sheppard
Connect onto existing 4-inch sanitary sewer service provided.
Routing PW Sewer Rating1/5/2011 1/5/2011 PASS
DetailsBeverly Mountain
Routing PW Drainage12/27/2010 1/4/2011 PASS
DetailsBrian Murphy
Routing - Addressing12/27/2010 12/27/2010 PASS
DetailsTerry Records
Routing - PLANNING Land Div12/22/2010 12/27/2010 PASS
DetailsTodd Tucker
Application received 12/22/201012/22/2010 DONE
DetailsChristina Prado
Pending Assignment by JCM12/22/2010 12/22/2010 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  12/22/2010 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/22/2010 DONE
DetailsChristina Prado
Telephone call  12/22/2010 DONE
DetailsChristina Prado
Called Action Couriers for pick up