First Notice | | 3/23/2013 | 3/22/2013 | | DONE |
|
|
|
old permit
|
BLD-Aging Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/13/2013 | 3/13/2013 | 3/13/2013 | A | PASS |
Dave Hannah
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 3/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 3/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 6/25/2012 | 6/26/2012 | 6/26/2012 | A | PASS |
Dave Hannah
|
|
|
TIM Phone #: ###-####
|
FIRE-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 | A | PASS |
Forrest France
|
|
|
C/N items finished. Life safety passed.
|
PubWorks Occupancy Approval | 6/22/2012 | 6/22/2012 | 6/22/2012 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/21/2012 | 6/21/2012 | 6/22/2012 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 6/20/2012 | 6/20/2012 | 6/20/2012 | P | FAIL |
Forrest France
|
|
|
Door hardware and signage need revised as discussed.
|
BLD-Final | 6/19/2012 | 6/19/2012 | 6/19/2012 | P | NR |
Jim Sly
|
|
|
jim Phone #: ###-#### Called Tim Need finals from P/.W ACHD Zoning Fire.......Etc.
|
BLD-Framing/Rough-in | 5/7/2012 | 5/8/2012 | 5/8/2012 | P | PART |
Dave Hannah
|
|
|
tim Phone #: ###-#### ok to cover restroom and office
|
BLD-Wall Bracing | 4/18/2012 | 4/19/2012 | 4/19/2012 | A | PASS |
Dave Hannah
|
|
|
Shear inspection - - TIm Phone #: ###-####
|
Override - Parcel Holds | 4/18/2012 | 1/1/1900 | 4/18/2012 | | |
|
|
|
Shear wall
|
BLD-Wall Bracing | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | FAIL |
Dave Hannah
|
|
|
TIM Phone #: ###-#### plans call out nails crew used staples also need same thing from engineer on location of panels wording on plans sounds like the hole bldg is sheared ?
|
Override - Parcel Holds | 4/16/2012 | 1/1/1900 | 4/16/2012 | | |
|
|
|
per Tim Scheibe this inspection has nothin to do with the plan mod
|
Plan assigned to (SRZ) | 4/5/2012 | 4/5/2012 | 4/5/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 4/5/2012 | | 4/5/2012 | | PASS |
Sam Zahorka
|
|
|
Plan modification approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2012 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 4/5/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 4/5/2012 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2012 | | DONE |
Tisha Gallop
|
|
|
called Jack Davis and left vm plan mod is ready and fee.
|
Override - Parcel Holds | | | 4/5/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 4/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 4/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 4/5/2012 | | DONE |
Sam Zahorka
|
|
|
|
Plan Modification Accepted | | | 4/5/2012 | | DONE |
Christina Prado
|
|
|
PLAN MOD** Submitted to revise the configuration of restroom, janitor room and add a new floor drain. Plans sheets effected are A2.0. Plans given to Sam Zarhorka for review
|
BLD-Foundation | 3/27/2012 | 3/28/2012 | 3/28/2012 | A | PASS |
Dave Hannah
|
|
|
Ian Phone #: ###-####
|
BLD-Footing | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 3/26/2012 | 3/27/2012 | 3/27/2012 | A | CANC |
Dave Hannah
|
|
|
Phone #: 8604101 >> Inspection requested via mobile web by dane
|
BLD-Foundation | 3/20/2012 | 3/22/2012 | 3/22/2012 | P | CANC |
Dave Hannah
|
|
|
Ian Phone #: ###-####
|
BLD-Footing | 3/20/2012 | 3/21/2012 | 3/21/2012 | P | CANC |
Dave Hannah
|
|
|
Ian Phone #: ###-####
|
(F) Reprint permit | | | 3/12/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/18/2011 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/28/2011 | | 4/4/2011 | | PASS |
Sam Zahorka
|
|
|
Sheets S3.0, S4.0, resub sheet and calculations.
Passed with comments. See Structural Plan Check Review Comments attached to plans, and scanned under documents.
|
Routing - PLAN CHECK | 4/4/2011 | | 4/4/2011 | | PASS |
Sam Zahorka
|
|
|
Passed with structural review comments attached to plans and scanned under documents.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 4/4/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/4/2011 | | |
|
|
|
|
Telephone call | | | 4/4/2011 | | DONE |
|
|
|
4-4-11 called Jeremy permit ready and fee given. Also need GC,ACHD,RP ///DLD
|
Plan assigned to (SRZ) | 12/22/2010 | | 4/4/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 3/25/2011 | | 3/28/2011 | | FAIL |
Sam Zahorka
|
|
|
Recieved corrections for structural. ROuted to the outsource structural reviewer.
Routed plans to Planning and Zoning also.
|
Routing - PLANNING | 3/28/2011 | | 3/28/2011 | | PASS |
Josh Wilson
|
|
|
OK per DRH11-00030
|
Telephone call | | | 3/28/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 3/25/2011 | | DONE |
Tisha Gallop
|
|
|
received three coipes of respone and structural calcs, and three copes of plan sheets S3.0, S4.0; inserted by arch. rep. and taken back to Sam Zahorka.
|
Routing - PUBLIC WORKS | 3/16/2011 | | 3/25/2011 | | PASS |
Beverly Mountain
|
|
|
New Civil Sheets added. ?
|
Routing PW Street Lights | 3/17/2011 | | 3/25/2011 | | PASS |
Hank Alarcon
|
|
|
|
Routing - PLAN CHECK | 3/15/2011 | | 3/21/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLUMBING | 3/14/2011 | | 3/15/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 1/25/2011 | | 3/14/2011 | | FAIL |
Sam Zahorka
|
|
|
Received resubmittal sheets for Plumbing and Public Works. Routed to Plumbing. Still waiting for structural review, Planning and Zoning corrections.
|
Plan resubmittals received | | | 3/11/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets C-1, P1.0, P2.0, and five copies of plan sheet 11.2(civil); inserted into plans by plan tech. on 3/14/11 and taken back to Sam Zahorka.
|
Telephone call | | | 2/7/2011 | | DONE |
Sam Zahorka
|
|
|
Called Jeremy Bastow the architect to check on the status of the correction resubmittals. He stated he never received my email so I resent it to him. I gave him Plumbing reviews telephone number to verify what they needed. SRZ
|
Route to Impact Fee Review | 1/21/2011 | 1/26/2011 | 1/25/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 1/21/2011 | 1/21/2011 | 1/25/2011 | | PASS |
Tim Frost
|
|
|
Please, attached review
|
1st review completed | | | 1/25/2011 | | DONE |
|
|
|
Failed - Planning, Plan Check, Plumbing
|
Telephone call | | | 1/21/2011 | | DONE |
Sam Zahorka
|
|
|
Spoke with Jeremy Bastow the Architect for this project about the intended use of this structure. He stated for the time being it would be used and occupied as a pump storage/maintenance/storage building but, at some time in the future the owners wanted to use it as a meeting place. I verified with him this permit is not for the future assembly use and that future permits for the change of occupancy will be required. He agreed. I requested him to let the applicant know and red-lined the plans to state "No assembly use allowed. All future work noted on the plans will require separate permits." Also got his permission to red-line the slab edge insulation on wall sections. Slab edge insulation is required to extend from the top of the slab. SRZ
|
Routing - PLAN CHECK | 1/10/2011 | | 1/21/2011 | | FAIL |
Sam Zahorka
|
|
|
Failed structural review. Routed to FIre.
|
Telephone call | | | 1/20/2011 | | DONE |
Sam Zahorka
|
|
|
Left message. waiting for a returned telephone call from the architect. Need to verify the intended use of the structure. Plans possibly represent other uses/functions of space other than a just a irrigation barn to house a pump. SRZ
|
Case Summary (BLD) | | | 1/20/2011 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 1/19/2011 | | DONE |
Sam Zahorka
|
|
|
Called the architect to verify the intended use of this structure. Left message.
|
Routing - PLANNING | 1/7/2011 | | 1/10/2011 | | FAIL |
Sarah Schafer
|
|
|
No staff level Design Review application has been submitted for this project. I contacted Jeremy Barstow and let him know that according to 11-23-06 a staff level DR was required.
|
Routing - PLUMBING | 1/6/2011 | | 1/7/2011 | | FAIL |
Bill VanDegrift
|
|
|
provide a site plan showing the sewer and water services. increase venting to 7.0686 sq. in.
|
Routing Off Site - STRUCTURAL | 12/22/2010 | | 1/7/2011 | | FAIL |
John Menard
|
|
|
Corrections from outsourced engineer recieved and sent to the design proffessional.
|
Routing - PUBLIC WORKS | 12/27/2010 | | 1/6/2011 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 1/6/2011 | | 1/6/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00921
|
Routing PW Sewer Design | 1/5/2011 | | 1/5/2011 | | PASS |
Mike Sheppard
|
|
|
Connect onto existing 4-inch sanitary sewer service provided.
|
Routing PW Sewer Rating | 1/5/2011 | | 1/5/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 12/27/2010 | | 1/4/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 12/27/2010 | | 12/27/2010 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING Land Div | 12/22/2010 | | 12/27/2010 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 12/22/2010 | 12/22/2010 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 12/22/2010 | | 12/22/2010 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/22/2010 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/22/2010 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/22/2010 | | DONE |
Christina Prado
|
|
|
Called Action Couriers for pick up
|