Permit Information
Permit NumberBLD10-02929
StatusFinaled
Name SHY-BEE DESIGN
Site Address 3623 E WARM SPRINGS AVE
Project NameHARRIS RANCH POSTAL PAVILION
Customer Number 
ePlanReviewNo
Description
(HARRIS RANCH POSTAL PAVILION 1A) **5-31-11 PLAN MODIFICATION TO INCLUDE: ADD AN ADDITIONAL COVERED PORCH; REMOVE ONE SET OF EXTERIOR DOORS TO ALLOW MORE ROOM FOR MAILBOXES; AND MODIFY THE LANDSCAPE DESIGN. SRZ*** To construct a new 198 square foot, One story, wood framed, post office building intended to house post office boxes for private residences. This structure will have one room that will include a 34" table located in the center, mailbox insert stations, a 34" tall counter, and a service sink. Work to include: Construct the building per plans; install a service sink; HVAC/mechanical work, electrical work, and plumbing work per plans; and interior finish work in compliance with chapter 8 of the 2006 IBC. This building is NOT fire sprinklered. All work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  3/20/2013  
DetailsBarbara Stitt
Doc finaled per Bob Archibald Ref:BLD10-02928
BLD-Aging Inspection3/13/20133/13/20133/13/2013 PASS
DetailsDave Hannah
Print Occupancy Form  3/12/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection11/22/201111/22/201111/22/2011APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final11/14/201111/15/201111/15/2011APASS
DetailsDave Hannah
Late morning---Tim Phone #: ###-####
FIRE-Final Inspection11/14/201111/15/201111/15/2011APASS
DetailsForrest France
Correction items verified for completion. Signature card not available at the time of inspection. Life safety finaled.
FIRE-Final Inspection11/10/201111/14/201111/14/2011AFAIL
DetailsTroy Cobbley
Provide a building address. 4" minimum height of a contrasting color facing the street. Also provide one 2A, 10BC fire extinguisher mounted in a normal path of travel between 5' and 4" above the finish floor with a current inspection tag from a local licenced company. See approved drawing sheet A0.1.
BLD-Final11/10/201111/10/201111/10/2011PNR
DetailsJim Storey
tim Phone #: ###-####
BLD-Framing/Rough-in9/29/20119/30/20119/30/2011APART
DetailsDave Hannah
Tim Phone #: ###-#### ext ok int ok but needs elec rough in
BLD-Footing9/15/20119/15/20119/15/2011PFAIL
DetailsJim Storey
min 24 depth from finsh grade not achived/ front center pad not min 18" dia.
BLD-Footing9/14/20119/15/20119/15/2011ANR
DetailsJim Storey
Tim Phone #: ###-####
BLD-Foundation9/1/20119/2/20119/2/2011APASS
DetailsDave Hannah
dane Phone #: ###-####
BLD-Footing9/1/20119/1/20119/2/2011PPASS
DetailsDave Hannah
Dane Phone #: ###-####
CHANGE STATUS TO (ISS)  7/1/2011 DONE
DetailsTisha Gallop
approved plan mod paid for and picked up.
Plan assigned to (SRZ)5/18/20115/18/20116/3/2011 PASS
DetailsSam Zahorka
Plan Modification
Routing - PLANNING6/1/2011 6/3/2011 PASS
DetailsSarah Schafer
Plan Modification ok per DRH11-00114
Routing - PLAN CHECK6/3/2011 6/3/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/3/2011 DONE
DetailsSam Zahorka
Case Summary (BLD)  6/3/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  6/3/2011  
Telephone call  6/3/2011 DONE
DetailsTisha Gallop
called Doug Cooper and left mssg that plan mod. is ready and fees.
Override - Parcel Holds  6/3/2011  
Permit Ready to Issue  6/3/2011 DONE
DetailsTisha Gallop
Routing - PLAN CHECK5/18/2011 6/1/2011 PASS
DetailsSam Zahorka
Plan Modification Accepted  5/18/2011  
DetailsBarbara Stitt
Plan Modification accepted to add a covered porch to one side of the building. One set of exterior doors were removed to allow the addition of more mailboxes and the landscape design was modified for the desige of the additional porch. Sheets A0.1, A1.1, A2.0, A2.1, A2.2, A4.0, A5.0, A6.0, structural calcualtions and a new cert of value were all submitted for the plan modification.
Issue PAID IN FULL permit  4/18/2011 DONE
Routing Off Site - STRUCTURAL3/28/2011 4/4/2011 PASS
DetailsSam Zahorka
Sheet A2.0, calculations, and Resub. sheet.
Passed with comments. See Structural Plan Check Review Comments attached to plans, and scanned under documents.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2011 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/4/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  4/4/2011 DONE
Routing - PLAN CHECK4/4/2011 4/4/2011 PASS
DetailsSam Zahorka
Permit Ready to Issue  4/4/2011 DONE
Telephone call  4/4/2011 DONE
4-4-11 called Jeremy permit ready and fee given. Also need GC,ACHD,RP ///DLD
Plan assigned to (SRZ)12/22/2010 4/4/2011 PASS
DetailsSam Zahorka
Telephone call  3/28/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - PLAN CHECK3/21/2011 3/28/2011 FAIL
DetailsSam Zahorka
Recieved structural corrections and routed off site to the structural reviewer.
Plan resubmittals received  3/25/2011 DONE
DetailsTisha Gallop
received three coipes of response, supplemental structural calcs and two copies of plan sheet A2.0; inserted by arch. rep. and taken back to Sam Zahorka.
Routing - PLANNING3/21/2011 3/21/2011 PASS
DetailsJosh Wilson
OK per DRH11-00030
Routing - PLAN CHECK1/24/2011 3/21/2011 FAIL
DetailsSam Zahorka
Telephone call  2/7/2011 DONE
DetailsSam Zahorka
Called Jeremy Bastow the architect to check on the status of the correction resubmittals. He stated he never received my email so I resent it to him. SRZ
Routing - FIRE1/21/20111/21/20111/24/2011 PASS
DetailsTim Frost
Please, see attached review
1st review completed  1/24/2011 DONE
Failed - Plan Check, Planning
Route to Impact Fee Review1/21/20111/26/20111/21/2011 PASS
DetailsCindy M. Gould
Fire and police impact fees applied
Routing - PLAN CHECK1/11/2011 1/21/2011 FAIL
DetailsSam Zahorka
Failed structural review. Routed to Fire.
Case Summary (BLD)  1/20/2011 DONE
Routing - PLANNING1/10/2011 1/11/2011 FAIL
DetailsSarah Schafer
A staff level Design Review is needed for the project according to 11-23-06. I spoke with Jeremy Barstow at McKibben Cooper yesterday regarding the Irrigation Barn and told him this project would need an approval as well.
Routing - PLUMBING1/10/2011 1/10/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - Erosion and Sediment1/7/2011 1/10/2011 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan an and ESC permit conditions. ESC10-00920.
Routing - PUBLIC WORKS12/27/2010 1/7/2011 PASS
DetailsBeverly Mountain
Routing Off Site - STRUCTURAL12/22/2010 1/7/2011 FAIL
DetailsJohn Menard
Corrections from outsourced engineer recieved and sent to the design proffessional.
Routing PW Sewer Design1/6/2011 1/7/2011 PASS
DetailsJon R. Gunnerson
Connect onto existing 4-inch sanitary sewer service provided.
Routing PW Drainage12/27/2010 1/6/2011 PASS
DetailsBrian Murphy
Routing - Addressing12/27/2010 12/27/2010 PASS
DetailsTerry Records
Routing PW Sewer Rating12/27/2010 12/27/2010 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div12/22/2010 12/27/2010 PASS
DetailsTodd Tucker
Application received 12/22/201012/22/2010 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  12/22/2010 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/22/2010 DONE
DetailsChristina Prado
Pending Assignment by JCM12/22/2010 12/22/2010 DONE
DetailsJohn Menard
Telephone call  12/22/2010 DONE
DetailsChristina Prado
Called Action Couriers for pick up