Permit Information
Permit NumberBLD10-02939
StatusFinaled
Name SYNERGY BUILDING COMPANY INC
Site Address 3041 W PASADENA DR
Project NameMWI Veterinary Supply
Customer Number 
ePlanReviewNo
Description
(MWI VETERINARY SUPPLY - ENTIRE BUILDING) Fire sprinklers used to substitute for the 1-hr fire-resistance-rating of the building. To remodel an existing building (basement, 1st story, 2nd story, and 3rd story) for a new office tenant. Each story has a floor area of about 15,000 square feet. Work is to include interior nonbearing walls, new or relocated doors, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/4/20118/11/2011 DONE
First Notice 7/1/20117/25/2011 DONE
DetailsChristina Prado
faxed7/25/11
Permanent Occupancy  6/21/2011 DONE
DetailsChristina Prado
BLD-Final6/16/20116/17/20116/17/2011APASS
DetailsJim Storey
Martin Phone #: ###-#### final ok perm occ. not able to sign card.
BLD-Final4/5/20114/6/20114/6/2011APART
DetailsJim Storey
martin Phone #: ###-#### temp ok
FIRE-Final Inspection4/4/20114/5/20114/5/2011APASS
DetailsForrest France
Corrections finished. Fire life safety passed.
FIRE-Final Inspection3/31/20114/1/20114/1/2011PPART
DetailsForrest France
Correction items verified for completion. Final pending repair of an exit sign and one non-functional damper motor at the 3rd floor.
FIRE-Final Inspection3/31/20113/31/20113/31/2011PPART
DetailsForrest France
Corrections underway.
FIRE-Final Inspection3/29/20113/30/20113/30/2011PNR
DetailsForrest France
Preliminary life safety inspection completed including UPS and emergency generator tests, noted areas on each floor in need of adjustments in exit signage placement and EM lighting, noted hardware at two doors to be switched, discussed fire extinguishers, building address, occupant load signs, review notes, project schedule, fire alarm work, etc.
BLD-Framing/Rough-in3/15/20113/16/20113/16/2011PPASS
DetailsJim Storey
martin - ceiling grid Phone #: ###-####
BLD-Other3/14/20113/15/20113/15/2011AFAIL
DetailsJim Storey
Ceiling grid basement--Martin Phone #: ###-#### seal coridor penatrations.
BLD-Other3/8/20113/8/20113/8/2011PPART
DetailsJim Sly
martin (this is for the first floor) Phone #: ###-####
Ceiling Grid 1st floor OK ...Except for Corridors.
FIRE-Conference2/24/20112/24/20112/24/2011PDONE
DetailsForrest France
Regarding project related fire alarm work.
BLD-Other2/18/20112/22/20112/22/2011APASS
DetailsJim Storey
ceiling grid insp for 3rd floor//Martin Phone #: ###-#### all ceillings ok pending others.
BLD-Framing/Rough-in1/20/20111/21/20111/21/2011PPASS
DetailsJim Storey
martin Phone #: ###-#### first floor ok to cover.
BLD-Framing/Rough-in1/14/20111/18/20111/18/2011PPASS
DetailsJim Storey
Martin ###-####
Issue PAID IN FULL permit  1/14/2011 DONE
DetailsTisha Gallop
Plan assigned to (CJW)12/27/201012/27/20101/12/2011 PASS
DetailsCarl Westfall
Routing - PLAN CHECK1/11/2011 1/12/2011 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2011 DONE
Print Occupancy Form  1/12/2011 DONE
Permit Ready to Issue  1/12/2011 DONE
DetailsTisha Gallop
Telephone call  1/12/2011 DONE
DetailsTisha Gallop
called Matt Rhees and left vm permit is ready and fees and need GC, RCE/T.
Routing - PLAN CHECK1/7/2011 1/11/2011 DONE
DetailsCarl Westfall
Routed to Planning.
Routing - PLANNING1/11/2011 1/11/2011 PASS
DetailsSarah Schafer
Complies with zoning certificate issued today. (CZC11-00002)
Route to Impact Fee Review1/4/20111/7/20111/10/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE1/4/20111/4/20111/7/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  1/7/2011 FAIL
Failed Planning, Plan Check
Plan resubmittals received  1/5/2011 DONE
1-5-11 received 1 transmittal letter,1 response letter,and 2 copies of sheets A1.0,A1.3,A2.0,A2.3,A3.3 sent to Carl W
Routing - PLANNING1/4/2011 1/4/2011 FAIL
DetailsSarah Schafer
Exterior paint and new door.

I called Matt Rhees and requested a zoning certificate for the modification to the exterior door. He said he would put it together and drop it off here tomorrow. I let him know we would review it within a day or two and call the building plans back for sign off.
Routing - PLAN CHECK12/27/2010 1/4/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on December 30, 2010 and was finished on January 4, 2011. Revised drawings were required. See the plan review report.
Routing PW Sewer Rating12/27/2010 12/27/2010 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB12/23/2010 12/27/2010 DONE
DetailsJason Blais
Routing - PUBLIC WORKS12/23/2010 12/27/2010 PASS
DetailsConnie Baumgartner
Recd Pcfee & Taken To Pln CK  12/23/2010  
Plans ACCEPTED BY PLAN TECH  12/23/2010 DONE
ok per Tim Woodard for level 2 intake
Application received 12/23/2010