BLD-Final | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Tony Young
|
|
|
Joe
|
DOC - Permit Finaled | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Tony Young
|
|
|
c of c issued
|
Zoning Approval | 5/27/2011 | 5/27/2011 | 5/27/2011 | | DONE |
Sarah Schafer
|
|
|
There were a couple of changes from the HPC approval. The awning over the front entry door is not yet in place due to the weather. Staff is comfortable with the applicant getting this finished after zoning sign off.
Additionally, there were changes to the windows. One window was not constructed in the north elevation due to the placement of the shower on the interior. The patterning on the windows was also changed from the proposed 6/1 to 3/1. The window patterning placed on the addition can be found in the historic home. The architect submitted a letter with the information and staff has uploaded the letter to the DR file for future use if questions arise. (DRH10-00281)
|
BLD-Final | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | NR |
Tony Young
|
|
|
joe - as late as possible please - please call 10 minutes prior Phone #: ###-####,, walk through only,, ok after zoning final
|
BLD-Conference | 5/6/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 5/3/2011 | 5/3/2011 | 5/6/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 3/3/2011 | 3/3/2011 | 3/3/2011 | P | PASS |
Mike Jordan
|
|
|
DIANE Phone #: ###-####
|
BLD-Energy code compliance | 2/24/2011 | 2/25/2011 | 2/25/2011 | A | PART |
Dave Hannah
|
|
|
Diane Phone #: ###-#### seal package ok
|
BLD-Framing/Rough-in | 2/24/2011 | 2/25/2011 | 2/25/2011 | A | PASS |
Dave Hannah
|
|
|
Diane Phone #: ###-####
|
BLD-Energy code compliance | 2/24/2011 | 2/24/2011 | 2/24/2011 | P | CANC |
Tom Arcoraci
|
|
|
call 15 min prior//Joe Phone #: ###-#### -- cancelled by Joe Levich 12:19pm 2/24/11, inspector notified /leg
|
BLD-Framing/Rough-in | 2/24/2011 | 2/24/2011 | 2/24/2011 | P | CANC |
Tom Arcoraci
|
|
|
call 15 min prior..Joe Phone #: ###-#### -- cancelled by Joe Levich 12:19pm 2/24/11, inspector notified /leg
|
BLD-Footing | 1/26/2011 | 1/27/2011 | 1/27/2011 | A | PART |
Tony Young
|
|
|
diane - late morning please Phone #: ###-####,, WORK IN PROGRESS,, OK TO POUR WHEN READY ON GARAGE FOOTINGS
|
BLD-Footing | 1/12/2011 | 1/13/2011 | 1/13/2011 | A | PASS |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
Routing Walk-In (Zoning) | 12/28/2010 | 12/28/2010 | 12/28/2010 | A | PASS |
Matthew A Halitsky
|
|
|
|
Routing Walk-In (BLD) | 12/28/2010 | 12/28/2010 | 12/28/2010 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 12/28/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/28/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/28/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/28/2010 | | |
|
|
|
|
Application received | | 12/28/2010 | | | |
|
|
|
|