Permit Information
Permit NumberBLD10-02960
StatusExpired
Name BENCHMARK CONSTRUCTION INC
Site Address 9543 W EMERALD ST
Project NameEMERALD BUILDING
Customer Number 
ePlanReviewNo
Description
(EMERALD BUILDING ELEVATOR ADDITION) Fire sprinklers used for code trade-offs. To construct a 187 square foot elevator addition to provide an accessible route to serve about 6,208 square feet of the existing 8,433 square foot 2nd story. The elevator will not be available to serve about 2,225 square feet of the 2nd story. Work is to include concrete footings, concrete foundations, masonry walls, masonry columns, wood floor joists, wood roof joists, wood floor and roof sheathing, wood stud walls with wood sheathing, interior nonbearing walls, changing a shower room to a toilet room accessible to the disabled, suspended acoustical ceilings, relocated doors, and relocated windows. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. This permit does NOT establish a Certificate of Occupancy for any tenant. This is a shell permit only. Each tenant is required to apply for and receive their own Certificate of Occupancy before occupancy. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  5/8/2014 DONE
Drawings discarded
BLD-Conference5/7/20145/7/20145/7/2014PDONE
DetailsMike Jordan
DOC - Permit Expired5/7/20145/7/20145/7/2014PPASS
DetailsMike Jordan
Per conversation with Jason Blais, ok to expire permit. No construction was ever started or required inspections ever done.
Plan Reviewer's activity  1/18/2012 DONE
DetailsJason Blais
Permit is still valid until 9/15/12.
Issue PAID IN FULL permit  9/16/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  6/27/2011 DONE
DetailsTisha Gallop
Telephone call  6/27/2011 DONE
DetailsTisha Gallop
called Tom Webb (arch) and Diane Pierce (appl) and left both vm that permit is ready, fees, need GC form with RCE# and RP.
Inspection Record Card- Bld  6/24/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/23/2011 DONE
Routing - PLAN CHECK6/3/2011 6/23/2011 PASS
Was waiting for 3rd copy of revised drawings and calculations so that they can be sent to the Consultang Structural Engineer. Also, Item 7 on the original drawings not satisfied. The Consultant Structural Engineer approved the response on June 22. Architectural drawings approved after resubmittal review on June 23.
Plan assigned to (CJW)12/30/2010 6/23/2011 PASS
DetailsCarl Westfall
1st review done
Routing Off Site - STRUCTURAL6/15/2011 6/22/2011 PASS
DetailsCarl Westfall
Sent resubmitted structural drawings to the consultant structural engineer. Consultant Engineer’s Response: “We have reviewed the engineer’s responses and have no other questions or concerns.”
Plan resubmittals received  6/15/2011  
Received a cover letter to Carl Westfall from Tom Webb dated 6-10-11, 1 plan response letter dated 3-14-11 from C.Chevy Chase, 1 copy of structural calcs, 1 copy of sheet S1.1, S1.2, S2.1, S3.1, S4.1, S5.1, 2 copies of sheets G0.2, A3.3, A3.3A, A4.3 and taken to Carl Westfall
Routing - PLAN CHECK1/31/2011 6/3/2011 FAIL
DetailsCarl Westfall
Completed the 2nd plan review. Sent E-mail asking for a 3rd set of revised drawings and structural calculations. Because of other time demands the resubmittal review wasn't completed until 7 working days after it was received (received on May 26 and finished on June 3). Since the 3rd set of drawings were not provided, the 2nd review has not been fully completed.
Plan resubmittals received  5/26/2011  
DetailsBarbara Stitt
Received 2 copies of response letter from Thomas Webb dated 5-26-11 to Carl Westfall, 2 copies of response letter from Chevy Chase dated 3-14-11 to Carl Westfall, 2 copies of structural calculations, 2 copies of HVAC plan, 2 copies of interior lighting compliance, 2 copies of sheets G0.1, G0.2, A2.1, A2.2, A3.1, A3.3, A3.3A, A4.3, A5.2, A6.2, S1.1, S1.2, S2.1, S3.1, S4.1, S5.1 and taken to Carl Westfall's desk
Route to Impact Fee Review1/25/20111/28/20112/10/2011 PASS
DetailsCindy M. Gould
Routing - FIRE1/25/20111/25/20111/31/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans. *Fire Plan Review time increased due to low staff levels*
1st review completed  1/31/2011 FAIL
Failed Structural, Plan Check
Routing - PLAN CHECK1/6/2011 1/25/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on January 20, 2011 and finished on January 25, 2011. Revised drawings were required. See the plan review report. Review delayed because of other projects and because of a family emergency for the Plans Examiner.
Routing Off Site - STRUCTURAL12/30/2010 1/24/2011 FAIL
DetailsCarl Westfall
1st review completed. Responses required.
Routing - Erosion and Sediment1/5/2011 1/6/2011 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00926
Routing - Design Review1/6/2011 1/6/2011 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC10-00171
Routing - PUBLIC WORKS12/30/2010 1/5/2011 PASS
DetailsBeverly Mountain
Routing PW Drainage1/3/2011 1/5/2011 PASS
DetailsBrian Murphy
Routing PW Sewer Rating1/3/2011 1/3/2011 PASS
DetailsBeverly Mountain
Routing - Addressing1/3/2011 1/3/2011 PASS
DetailsApril Wing
Telephone call  12/30/2010 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan Reviewer's activity  12/30/2010 DONE
DetailsJason Blais
Emailed applicant and architect stating for them to contact ACHD and submit any needed documents. Verification regarding approval and if any impact fees are required from ACHD will need to be provided to our Permit Counter prior to permit issuance.
Pending Assignment by JCB12/30/2010 12/30/2010 DONE
DetailsJason Blais
Application received 12/28/201012/28/2010 DONE
DetailsBarbara Stitt
Intake Approval  12/28/2010 PASS
DetailsCarl D Madsen