Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02963
StatusFinaled
Name CM COMPANY
Site Address 11197 W FAIRVIEW AVE
Project NamePrimary Health - Wildwood
Customer Number 
ePlanReviewNo
Description
Primary Health - To construct a new 5,275 square foot, one story, wood framed medical office building and related site improvements. This building will contain a reception and waiting area, offices, exam rooms, x-ray room, procedure room, five accessible restrooms and a break room. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/19/2012 DONE
Third Follow up  1/10/2012 DONE
DetailsTisha Gallop
received FV from Matthew Witt on 1/9/10
Telephone call  1/3/2012 DONE
DetailsTisha Gallop
called CM Company and spoke to James Lovejoy and he said Erin Hoobing was PM on this project. Left vm for Erin to call me back.
Third Follow up  12/21/2011  
Third Notice 11/27/201112/7/2011 DONE
faxed and mailed
Third Notice 10/25/201111/7/2011 DONE
faxed
Third Notice 9/27/201110/10/2011 DONE
faxed
Second Notice 9/18/20119/22/2011 DONE
faxed 9-22-11
First Notice 8/29/20119/8/2011 DONE
Permanent Occupancy  8/26/2011 DONE
DetailsTisha Gallop
reprint c of o with correct owner name
Case Summary (BLD)  8/26/2011 DONE
DetailsTisha Gallop
Permanent Occupancy  8/19/2011 DONE
BLD-Final8/18/20118/18/20118/18/2011PPASS
DetailsMike Jordan
tom - ###-####. Ok for perm. occ.
BLD-Final8/16/20118/18/20118/17/2011PNR
DetailsMike Jordan
tom Phone #: ###-####
FIRE-Final Inspection8/16/20118/17/20118/17/2011APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection8/12/20118/15/20118/15/2011PFAIL
DetailsTroy Cobbley
The life safety will be ready to sign off when the project related fire alarm and fire sprinkler permits are finaled and approved single action hardware is provided on the fire riser door.
Zoning Approval8/15/20118/15/20118/15/2011 DONE
DetailsAndrea Tuning
PubWorks Occupancy Approval8/9/20118/9/20118/9/2011 DONE
DetailsTiffany Lowery
BLD-Other7/20/20117/21/20117/21/2011PPASS
DetailsTom Arcoraci
Above ceiling for cover--Tom Phone #: ###-####
BLD-Other7/20/20117/20/20117/20/2011PNR
DetailsMike Jordan
ceiling grid insp//Tom Phone #: ###-####. Needs mech. rough in inspection.
BLD-Framing/Rough-in6/17/20116/17/20116/17/2011PPASS
DetailsMike Jordan
tom Phone #: ###-####. Interior steel stud framed walls at foier.
BLD-Energy code compliance6/6/20116/7/20116/7/2011PPASS
DetailsMike Jordan
Tom Phone #: ###-####
BLD-Framing/Rough-in6/2/20116/3/20116/3/2011PPASS
DetailsMike Jordan
Tom Phone #: ###-####. Interior steel stud walls and exterior wood framed walls only.
BLD-Framing/Rough-in5/17/20115/17/20115/17/2011PPART
DetailsMike Jordan
Verified fireblocking at all pop outs. ok to cover.
FIRE-Conference5/13/20115/16/20115/16/2011ADONE
DetailsTroy Cobbley
Per discussion the "concealed combustible" chases on the exterior of the building are not required to have sprinkler protection and can be covered with no further modifications.
BLD-Framing/Rough-in5/12/20115/13/20115/13/2011PPART
DetailsMike Jordan
Tom Phone #: ###-####Exterior shear nailing only. Needs to provide coil straps at east and north side of building, provide fire blocking at 10ft. intervals at pop outs.
BLD-Framing/Rough-in5/9/20115/10/20115/10/2011APART
DetailsMike Jordan
tom Phone #: ###-####. Visually inspected the attachment and all associated hardware of the roof diaphragm system. All work was done in accordance with approved plans.
FIRE-Conference5/5/20115/6/20115/6/2011ADONE
DetailsTroy Cobbley
Tom and I went over fire dept access requirements for the site.
BLD-Foundation4/13/20114/14/20114/14/2011APASS
DetailsJim Sly
tom Phone #: ###-####
OK pending MTI special inspection, tests and approvals.....Also looked at trash enclosure footing.....appears OK.
BLD-Footing4/11/20114/12/20114/12/2011PPASS
DetailsMike Jordan
Tom Phone #: ###-####. Perimeter footing.
Routing - PLANNING Land Div3/15/2011 3/16/2011 PASS
DetailsTodd Tucker
Routing Off Site - STRUCTURAL3/15/2011 3/16/2011 PASS
DetailsJohn Menard
3-15-11 called Action Couriers for pick up - Structural plans approved with redlined notes. JCM
Routing - PLAN CHECK3/16/2011 3/16/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  3/16/2011 DONE
DetailsJohn Menard
Print Occupancy Form  3/16/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  3/16/2011 DONE
DetailsTisha Gallop
Telephone call  3/16/2011 DONE
DetailsTisha Gallop
called and told Erin/CM Co. that permit is ready and fees.
Issue PAID IN FULL permit  3/16/2011 DONE
Plan assigned to (JCM)1/3/2011 3/16/2011 PASS
DetailsJohn Menard
Routing - PLAN CHECK3/14/2011 3/15/2011  
DetailsJohn Menard
Plan resubmittals received  3/15/2011  
DetailsBarbara Stitt
Received 1 cover transmittal, 3 copies of structural calcuations, 3 copies of sheetsS-0, S-1, S-2, S-3, S-4 and inserted into plans then returned to John Menards Desk
Routing - PUBLIC WORKS3/8/2011 3/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage3/8/2011 3/14/2011 PASS
DetailsBrian Murphy
Routing - PLAN CHECK3/14/2011 3/14/2011  
DetailsJohn Menard
Routing - FIRE3/14/2011 3/14/2011 PASS
DetailsTim Frost
Please, see attached review. The review is based on HAVING fire sprinklers throughout.
Plan resubmittals received  3/11/2011 DONE
DetailsTisha Gallop
received two copies of plan sheet CF.1; inserted by arch. rep. and taken back to Brian Murphy
Plan resubmittals received  3/11/2011 DONE
received underground drawing for TRF
Routing - FIRE  3/11/2011 PASS
Received and approved new underground layout. This was the only resubmittal item. Therefore, it is now approved by fire.
Plan resubmittals requested  3/9/2011 DONE
DetailsJohn Menard
e-mailed the architect a copy of the second structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL3/1/2011 3/9/2011 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting additional revisions. JCM
Routing - PLAN CHECK3/7/2011 3/8/2011  
DetailsJohn Menard
Plan resubmittals received  3/7/2011  
DetailsBarbara Stitt
RECEIVED 5 SETS OF C-2.1, C2.2, C2.3, AND 1 COVER TRANSMITTAL inserted by Larson Architects office and then returned to John Menards office
Plan Reviewer's activity  3/3/2011 PASS
DetailsJohn Menard
Reviewed and approved all requested non-structural plan revisions. JCM
Plan resubmittals received  3/2/2011 DONE
DetailsTisha Gallop
received transmittal and two copies of plan sheet M0.01; inserted by arch. rep. and taken back to John Menard.
Telephone call  3/1/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals received  3/1/2011 DONE
DetailsTisha Gallop
received transmittal and one copy of plan sheet S-0, S-1, S-2, S-3, S-4; taken to John Menard.
Plan resubmittals requested  2/28/2011 DONE
DetailsJohn Menard
E-mailed the architect requesting additional copies of the revised structural sheets and copies of the revised envelope compliance. JCM
Plan resubmittals received  2/23/2011 DONE
DetailsChristina Prado
Received response letter; Letter of transmittal; 4 copies of review comments responses; 4 copies of Review Comments Calculations; 2 copies of plans G1.0, SP-1, SP-2, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, ID-1, ID-2, ID-3, ID-4, ID-5, M2.11, M3.00, P2.11, P2.12, P3.00, S-0, S-1, S-2, S-3, S-4. Arch. rep. inserted new copies. Plans and documents taken to John Menard for review.
Routing - FIRE2/8/20112/8/20112/16/2011 FAIL
DetailsTim Frost
Please, see attached review
Plan Reviewer's activity  2/16/2011 DONE
Sent review to RP
1st review completed  2/16/2011 DONE
Failed - Plan Check, Land Division, Public Works, Fire
Route to Impact Fee Review2/8/20112/11/20112/10/2011 PASS
DetailsCindy M. Gould
Plan resubmittals requested  2/8/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK1/25/2011 2/8/2011 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment1/25/2011 1/25/2011 PASS
DetailsClint A Smith
ESC10-00927 plan approved per the attached conditions. All correction completed with the narrative.
Routing - PLAN CHECK1/20/2011 1/25/2011  
DetailsJohn Menard
Routing Off Site - STRUCTURAL1/3/2011 1/24/2011 FAIL
DetailsJohn Menard
1-3-11 called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  1/24/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLANNING1/19/2011 1/19/2011 PASS
DetailsAndrea Tuning
Routing - PLUMBING1/12/2011 1/19/2011 PASS
DetailsBill VanDegrift
increase waste to FD-1 and FD-1 to 4" to accept full flow from 2" R.P.
Plan resubmittals received  1/13/2011 DONE
received 2 erosion and sediment control plans sent to John M
Routing PW Environmental1/12/2011 1/12/2011 PASS
DetailsWalt Baumgartner
Pretreatment of silver bearing wastewater from xray required.
Routing PW Solid Waste1/10/2011 1/12/2011 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating1/10/2011 1/12/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment1/12/2010 1/12/2011 FAIL
DetailsSteven Webb
ESC10-00927 plan failed due to plan narrative must be edited and resubmit two copies to the city for approval. Notified the the Plan designer of the changes that are necassary for approval.
Routing - PUBLIC WORKS1/4/2011 1/12/2011 FAIL
DetailsConnie Baumgartner
Plan failed by Brian Murphy for drainage issues. Please contact at ###-####
Routing PW Sewer Design1/7/2011 1/10/2011 PASS
DetailsJavier Guzman
Connect onto existing 6-inch sanitary sewer service line provided.
Routing PW Drainage1/5/2011 1/10/2011 FAIL
NEED CROSS DRAINAGE ACCESS AGREEMENT
Routing - Addressing1/4/2011 1/4/2011 PASS
DetailsApril Wing
Routing - PLANNING Land Div1/3/2011 1/4/2011 FAIL
DetailsTodd Tucker
Property is involved in a Parcel Consolidation (ROS10-00030) that has not been recorded. Once the Record of Survey for Parcel Consolidation has been recorded the Building Permit can be approved.
Recd Pcfee & Taken To Pln CK  1/3/2011 DONE
Pending Assignment by JCM1/3/2011 1/3/2011 DONE
DetailsJohn Menard
Plan routing begun/NEW & ADDTN  1/3/2011 DONE
Application received 12/29/2010