First Notice | | 7/10/2011 | 8/11/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/30/2011 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval | 5/25/2011 | 5/25/2011 | 5/25/2011 | | PASS |
Andrea Tuning
|
|
|
Parking lot, landscaping and drainage improvements have been installed. The applicant may obtain permanent occupancy and have their bond released.
|
Zoning Approval | 5/23/2011 | 5/23/2011 | 5/23/2011 | | FAIL |
Andrea Tuning
|
|
|
The applicant's parking lot striping is incomplete.
|
Temporary Occupancy | 5/4/2011 | 8/2/2011 | 5/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval Temp | 5/4/2011 | 5/4/2011 | 5/4/2011 | | DONE |
Andrea Tuning
|
|
|
This approval is for a 90 day temporary occupancy. The applicant has bonded for the landscaping improvements. In order to have the bond released and/or permanent occupancy issued, the applicant will be required to complete the landscape improvements.
|
PubWorks Occupancy Approval | 5/4/2011 | 5/4/2011 | 5/4/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 5/3/2011 | 5/3/2011 | 5/3/2011 | P | PASS |
Tom Arcoraci
|
|
|
Fred please call 30 min before going out Phone #: ###-####
|
FIRE-Final Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/8/2011 | 4/11/2011 | 4/11/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on all of the interior doors. Also per the building plan reviewer resubmittals may be required that match the actual wall layout. The plan reviewer is going to contact the building inspector.
|
FIRE-Final Inspection | 4/7/2011 | 4/8/2011 | 4/8/2011 | A | CANC |
Troy Cobbley
|
|
|
fred Phone #: ###-#### Cancelled due to time constraints and the contact no longer being available today.
|
BLD-Final | 3/28/2011 | 3/29/2011 | 3/29/2011 | A | NR |
Tom Arcoraci
|
|
|
FRED Phone #: ###-####
|
MISC ACTIONS | | | 3/24/2011 | | DONE |
Tisha Gallop
|
|
|
received e-mail from Bench Sewer Dist all fees paid, ok to have inspections at 6595 W. Ustick; see attached scan
|
Issue PAID IN FULL permit | | | 3/15/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/11/2011 | | 3/14/2011 | | PASS |
|
|
|
ESC plan waiver is approved according to the ESC Permit Conditions. ESC11-00124
|
Routing - PLAN CHECK | 3/14/2011 | | 3/14/2011 | | PASS |
Sam Zahorka
|
|
|
SAM Z.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 3/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 3/14/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 3/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/14/2011 | | DONE |
Tisha Gallop
|
|
|
called Chris Laraway and left vm that permit is ready, fees, need ACHD and will need Bench Sewer Dist. receipt prior to getting final occupancy.
|
Plan assigned to (SRZ) | 12/30/2010 | | 3/14/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 3/11/2011 | | DONE |
Tisha Gallop
|
|
|
received ESC application and waiver request letter; taken to Sam Zahorka.
|
Telephone call | | | 3/10/2011 | | DONE |
Sam Zahorka
|
|
|
Left a message with the architect. Need ESC application and Plan waiver request.
|
CHANGE STATUS TO (REV) | | | 3/9/2011 | | DONE |
Tisha Gallop
|
|
|
out of fee status, still needs to route to ESC for exterior work per CZC10-00253.
|
Routing - Erosion and Sediment | 3/9/2011 | | 3/9/2011 | | FAIL |
Sam Zahorka
|
|
|
Applicant needs to submit a ESC application and plan waiver request. I called Chris Laraway the Design Proffessional and left a message.
|
Routing PW Drainage | 3/4/2011 | | 3/8/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 3/8/2011 | | 3/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 3/8/2011 | | 3/8/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Design Review | 1/4/2011 | | 3/8/2011 | | PASS |
Andrea Tuning
|
|
|
The applicant has provided a bond for the landscaping and parking lot improvements. These improvements must be completed in order to have the bond released. Andrea Tuning - CZC10-00253
|
Plan resubmittals received | | | 3/3/2011 | | DONE |
Christina Prado
|
|
|
Received transmittal;five copies of reduced size O&M Drainage Plans;one copy of a Limited Subsurface Investigation packet;one copy of ACHD acceptance letter and five sets of plans C.2 and A.4. Routed to Sam Z for review
|
Routing - PUBLIC WORKS | 2/23/2011 | | 2/24/2011 | | FAIL |
Connie Baumgartner
|
|
|
Resubmittals received. Please call me. SAM Z - ###-####.
|
Routing PW Drainage | 2/23/2011 | | 2/24/2011 | | FAIL |
Brian Murphy
|
|
|
NEEDS DRAINAGE REVISIONS
|
Routing - PLAN CHECK | 1/31/2011 | | 2/23/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 2/23/2011 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 2/18/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of plan review letter;two copies site drainage information; and two copies of plans C.0, C.1, C.2, A.1, A.2, A.3, A.4 & L.1. Routed to Sam Z for review
|
Telephone call | | | 2/7/2011 | | DONE |
Sam Zahorka
|
|
|
Called and left a message for Chris Laraway the ardchitect. Checking up on the status of the needed plan correction submittals. SRZ
|
Routing - FIRE | 1/25/2011 | | 1/31/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans. *Fire plan review delayed due to low staff levels*
|
1st review completed | | | 1/31/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 1/4/2011 | | 1/24/2011 | | FAIL |
Sam Zahorka
|
|
|
Plan review corrections sent to the design proffessional. Routed to Fire.
|
Routing - PUBLIC WORKS | 12/30/2010 | | 1/4/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 1/3/2011 | | 1/3/2011 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 12/29/2010 | | 12/30/2010 | | DONE |
Jason Blais
|
|
|
|
Application received | | 12/29/2010 | 12/29/2010 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/29/2010 | | PASS |
|
|
|
OK to submit for permit.
|
Plans ACCEPTED BY PLAN TECH | | | 12/29/2010 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/29/2010 | | DONE |
Christina Prado
|
|
|
|