Third Notice | | 7/3/2011 | 7/8/2011 | | DONE |
|
|
|
|
Second Notice | | 6/24/2011 | 6/28/2011 | | DONE |
|
|
|
|
First Notice | | 6/2/2011 | 6/14/2011 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 5/23/2011 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 5/20/2011 | 5/20/2011 | 5/20/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 5/18/2011 | 5/19/2011 | 5/19/2011 | P | PART |
Mike Jordan
|
|
|
Bryce Phone #: ###-####. Ok for temp. occ. Wil be ok for perm occ. once elec. signs perm.
|
FIRE-Final Inspection | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | PASS |
Forrest France
|
|
|
Life safety is acceptable pending two items including (1) the fire extinguisher is located along a normal path of travel as discussed and (2) approved hardware at the restroom is installed and verified prior to structural final.
|
Temporary Occupancy UNPAID FEE | | | 5/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 5/18/2011 | 5/18/2011 | 5/18/2011 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Energy code compliance | 5/9/2011 | 5/10/2011 | 5/10/2011 | A | PASS |
Mike Jordan
|
|
|
Brice Phone #: ###-####
|
BLD-Energy code compliance | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Mike Jordan
|
|
|
BRYCE Phone #: ###-####
|
BLD-Framing/Rough-in | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Mike Jordan
|
|
|
BRYCE Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PART |
Mike Jordan
|
|
|
Bryce ###-####. Needs to provide truss engineering. Will check on energy ok. Ok to insulate. Also additional rebar added to footing for dumpster enclosure.
|
BLD-Framing/Rough-in | 4/27/2011 | 4/28/2011 | 4/28/2011 | P | NR |
Mike Jordan
|
|
|
bryce Phone #: ###-####. Needs rough in inspections.
|
Case Summary (BLD) | | | 4/27/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Footing | 4/25/2011 | 4/25/2011 | 4/25/2011 | P | PART |
Mike Jordan
|
|
|
STeve Phone #: ###-####. Needs to add #4 horizontal in footing. Footing for dumpster enclosure.
|
BLD-Framing/Rough-in | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | PASS |
Mike Jordan
|
|
|
Sheathing only--Bryce Phone #: ###-####. Shear ok. Reviewed supplemental info and approved fix from engineer. All issues have been resolved.
|
Case Summary (BLD) | | | 4/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Other | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | FAIL |
Mike Jordan
|
|
|
exterior sheathing insp//Bryce Phone #: ###-####. Nailing ok. Needs approved fix for missing holdowns, clarification on A2 holdowns and straps around openings and corners.
|
BLD-Other | 4/4/2011 | 4/5/2011 | 4/5/2011 | A | PASS |
Mike Jordan
|
|
|
slab on grade insp//Jeremy Phone #: ###-####
|
BLD-Wall cover | 3/29/2011 | 3/30/2011 | 3/30/2011 | P | CANC |
Mike Jordan
|
|
|
Stem Wall---Jeremy Phone #: ###-####
|
BLD-Foundation | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PASS |
Mike Jordan
|
|
|
Stem Wall---Jeremy Phone #: ###-####
|
BLD-Footing | 3/28/2011 | 3/29/2011 | 3/29/2011 | A | PASS |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####
|
BLD-Footing | 3/25/2011 | 3/28/2011 | 3/28/2011 | A | NR |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####. Reinforcement not yet installed. Also noted that due to rain, footing footprint is partially flooded. Contacted jermey to discuss issues. Will let dry out, and install rebar and cal for reinspection.
|
Issue PAID IN FULL permit | | | 3/17/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 1/3/2011 | | 3/11/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 3/10/2011 | | 3/11/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 3/11/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 3/11/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/11/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/11/2011 | | DONE |
Tisha Gallop
|
|
|
Called Jason Tomlinson and told him permit is ready, fees and need ACHD.
|
Routing - PUBLIC WORKS | 3/9/2011 | | 3/10/2011 | | PASS |
Barbara Moore
|
|
|
|
Routing PW Drainage | 3/9/2011 | | 3/9/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Drainage | 2/28/2011 | | 3/3/2011 | | FAIL |
|
|
|
NEED SIGNED COPY OF DRAINAGE EASMENT
|
Routing - PUBLIC WORKS | 2/28/2011 | | 3/3/2011 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 2/9/2011 | | 2/23/2011 | | PEND |
Sam Zahorka
|
|
|
Pending other departments to pass.
|
Routing - PLUMBING | 2/23/2011 | | 2/23/2011 | | PASS |
Bill VanDegrift
|
|
|
vent for P-5 under P-7 required. provide a dcva for the premise protection, espresso mechine will require an r.p.. verify ice maker protection. 120 deg. max hot water to public lavs and hand sinks.
|
Plan resubmittals received | | | 2/22/2011 | | DONE |
|
|
|
received 2 copies of sheets M0.0, M0.1, P1.0 , P2.1 , H1.0 inserted by Jason Tomlison. sent to Sam Z
|
Route to Impact Fee Review | 1/28/2011 | 2/2/2011 | 2/10/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Drainage | 2/4/2011 | | 2/9/2011 | | FAIL |
Brian Murphy
|
|
|
NEED CROSSDRAINAGE PAPERWORK BRIAN MURPHY ###-####
|
Routing - PUBLIC WORKS | 2/4/2011 | | 2/9/2011 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - FIRE | 1/28/2011 | 1/28/2011 | 2/3/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 2/3/2011 | | FAIL |
|
|
|
Failed Public Works, Plumbing
|
Routing - PLAN CHECK | 1/14/2010 | | 1/28/2011 | | PEND |
Sam Zahorka
|
|
|
Pending other departments to pass. Routed to Fire.
|
Routing - PLUMBING | 1/11/2011 | | 1/14/2011 | | FAIL |
Bill VanDegrift
|
|
|
plumbing and mechanical plans are required to be stamped by an Idaho licensed engineer. design plumbing system to the 2003 UPC.
|
Routing - PLANNING | 1/14/2011 | | 1/14/2011 | | PASS |
Andrea Tuning
|
|
|
DR application is OK. Plans have been forwarded to Susan Riggs.
drh10-00307 Andrea Tuning, cup10-00049 cup10-00081 Susan Riggs
|
Plan resubmittals received | | | 1/12/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal and five copies of plan sheets C1, C2, C3, C4, C5; inserted by LEG and taken back to plumbing review box.
|
Routing PW Sewer Design | 1/10/2011 | | 1/11/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sanitary sewer service provided.
|
Routing - PUBLIC WORKS | 1/3/2011 | | 1/11/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy, contact at ###-####
|
Routing - Erosion and Sediment | 1/11/2011 | | 1/11/2011 | | PASS |
Clint A Smith
|
|
|
ESC10-00930 plan approved per the attached conditions.
|
Routing PW Solid Waste | | | 1/10/2011 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | 1/10/2011 | | 1/10/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 1/5/2011 | | 1/7/2011 | | FAIL |
Brian Murphy
|
|
|
NEEED CROSSDRAINAGE AGEEMENT
|
Routing - Addressing | 1/4/2011 | | 1/4/2011 | | PASS |
April Wing
|
|
|
|
Plan resubmittals received | | | 1/3/2011 | | |
|
|
|
1-3-11 received 3 structural calcs,and 4 copies of sheets S1.0,S2.1 inserted by Jason Tomlinson.
|
Pending Assignment by JCM | 1/3/2011 | | 1/3/2011 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 12/30/2010 | | 1/3/2011 | | PASS |
Todd Tucker
|
|
|
|
Pending Assignment by JCM | 12/30/2010 | | 1/3/2011 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 12/30/2010 | | | |
|
|
|
|
Routing PW Sewer Design | | | | | |
Mike Sheppard
|
|
|
|