Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02973
StatusFinaled
Name ALTA CONSTRUCTION
Site Address 1589 N WILDWOOD
Project NameDutch Bros Coffee
Customer Number 
ePlanReviewNo
Description
(DUTCH BROS COFFEE) To construct a 366 square foot, type VB, one story, structure to be used as a dual drive-thru coffee kiosk. Other work includes all site improvements, paving and landscaping. All work per the approved plans, engineering, and all other reviewing agencies approvals. DRH10-00307, CUP10-00049 **SRZ** 7-8-11 7-8-11 PER GC FINAL CERT OF VALUE $ 172,297.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/3/20117/8/2011 DONE
Second Notice 6/24/20116/28/2011 DONE
First Notice 6/2/20116/14/2011 DONE
Permanent Occupancy UNPAID FEE  5/23/2011 DONE
PubWorks Occupancy Approval5/20/20115/20/20115/20/2011 DONE
DetailsTiffany Lowery
BLD-Final5/18/20115/19/20115/19/2011PPART
DetailsMike Jordan
Bryce Phone #: ###-####. Ok for temp. occ. Wil be ok for perm occ. once elec. signs perm.
FIRE-Final Inspection5/19/20115/19/20115/19/2011PPASS
DetailsForrest France
Life safety is acceptable pending two items including (1) the fire extinguisher is located along a normal path of travel as discussed and (2) approved hardware at the restroom is installed and verified prior to structural final.
Temporary Occupancy UNPAID FEE  5/19/2011 DONE
DetailsTisha Gallop
Zoning Approval5/18/20115/18/20115/18/2011 PASS
DetailsAndrea Tuning
BLD-Energy code compliance5/9/20115/10/20115/10/2011APASS
DetailsMike Jordan
Brice Phone #: ###-####
BLD-Energy code compliance5/2/20115/2/20115/2/2011PPASS
DetailsMike Jordan
BRYCE Phone #: ###-####
BLD-Framing/Rough-in5/2/20115/2/20115/2/2011PPASS
DetailsMike Jordan
BRYCE Phone #: ###-####
BLD-Framing/Rough-in4/29/20114/29/20114/29/2011PPART
DetailsMike Jordan
Bryce ###-####. Needs to provide truss engineering. Will check on energy ok. Ok to insulate. Also additional rebar added to footing for dumpster enclosure.
BLD-Framing/Rough-in4/27/20114/28/20114/28/2011PNR
DetailsMike Jordan
bryce Phone #: ###-####. Needs rough in inspections.
Case Summary (BLD)  4/27/2011 DONE
DetailsTisha Gallop
BLD-Footing4/25/20114/25/20114/25/2011PPART
DetailsMike Jordan
STeve Phone #: ###-####. Needs to add #4 horizontal in footing. Footing for dumpster enclosure.
BLD-Framing/Rough-in4/21/20114/21/20114/21/2011PPASS
DetailsMike Jordan
Sheathing only--Bryce Phone #: ###-####. Shear ok. Reviewed supplemental info and approved fix from engineer. All issues have been resolved.
Case Summary (BLD)  4/21/2011 DONE
DetailsTisha Gallop
BLD-Other4/19/20114/19/20114/19/2011PFAIL
DetailsMike Jordan
exterior sheathing insp//Bryce Phone #: ###-####. Nailing ok. Needs approved fix for missing holdowns, clarification on A2 holdowns and straps around openings and corners.
BLD-Other4/4/20114/5/20114/5/2011APASS
DetailsMike Jordan
slab on grade insp//Jeremy Phone #: ###-####
BLD-Wall cover3/29/20113/30/20113/30/2011PCANC
DetailsMike Jordan
Stem Wall---Jeremy Phone #: ###-####
BLD-Foundation3/30/20113/30/20113/30/2011PPASS
DetailsMike Jordan
Stem Wall---Jeremy Phone #: ###-####
BLD-Footing3/28/20113/29/20113/29/2011APASS
DetailsMike Jordan
Jeremy Phone #: ###-####
BLD-Footing3/25/20113/28/20113/28/2011ANR
DetailsMike Jordan
Jeremy Phone #: ###-####. Reinforcement not yet installed. Also noted that due to rain, footing footprint is partially flooded. Contacted jermey to discuss issues. Will let dry out, and install rebar and cal for reinspection.
Issue PAID IN FULL permit  3/17/2011 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)1/3/2011 3/11/2011 PASS
DetailsSam Zahorka
Routing - PLAN CHECK3/10/2011 3/11/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  3/11/2011 DONE
DetailsSam Zahorka
Case Summary (BLD)  3/11/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  3/11/2011 DONE
Permit Ready to Issue  3/11/2011 DONE
DetailsTisha Gallop
Telephone call  3/11/2011 DONE
DetailsTisha Gallop
Called Jason Tomlinson and told him permit is ready, fees and need ACHD.
Routing - PUBLIC WORKS3/9/2011 3/10/2011 PASS
DetailsBarbara Moore
Routing PW Drainage3/9/2011 3/9/2011 PASS
DetailsBrian Murphy
Routing PW Drainage2/28/2011 3/3/2011 FAIL
NEED SIGNED COPY OF DRAINAGE EASMENT
Routing - PUBLIC WORKS2/28/2011 3/3/2011 FAIL
DetailsConnie Baumgartner
Routing - PLAN CHECK2/9/2011 2/23/2011 PEND
DetailsSam Zahorka
Pending other departments to pass.
Routing - PLUMBING2/23/2011 2/23/2011 PASS
DetailsBill VanDegrift
vent for P-5 under P-7 required. provide a dcva for the premise protection, espresso mechine will require an r.p.. verify ice maker protection. 120 deg. max hot water to public lavs and hand sinks.
Plan resubmittals received  2/22/2011 DONE
received 2 copies of sheets M0.0, M0.1, P1.0 , P2.1 , H1.0 inserted by Jason Tomlison. sent to Sam Z
Route to Impact Fee Review1/28/20112/2/20112/10/2011 PASS
DetailsCindy M. Gould
Routing PW Drainage2/4/2011 2/9/2011 FAIL
DetailsBrian Murphy
NEED CROSSDRAINAGE PAPERWORK BRIAN MURPHY ###-####
Routing - PUBLIC WORKS2/4/2011 2/9/2011 FAIL
DetailsConnie Baumgartner
Routing - FIRE1/28/20111/28/20112/3/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/3/2011 FAIL
Failed Public Works, Plumbing
Routing - PLAN CHECK1/14/2010 1/28/2011 PEND
DetailsSam Zahorka
Pending other departments to pass. Routed to Fire.
Routing - PLUMBING1/11/2011 1/14/2011 FAIL
DetailsBill VanDegrift
plumbing and mechanical plans are required to be stamped by an Idaho licensed engineer. design plumbing system to the 2003 UPC.
Routing - PLANNING1/14/2011 1/14/2011 PASS
DetailsAndrea Tuning
DR application is OK. Plans have been forwarded to Susan Riggs.

drh10-00307 Andrea Tuning, cup10-00049 cup10-00081 Susan Riggs
Plan resubmittals received  1/12/2011 DONE
DetailsTisha Gallop
received transmittal and five copies of plan sheets C1, C2, C3, C4, C5; inserted by LEG and taken back to plumbing review box.
Routing PW Sewer Design1/10/2011 1/11/2011 PASS
DetailsJon R. Gunnerson
Connect onto existing sanitary sewer service provided.
Routing - PUBLIC WORKS1/3/2011 1/11/2011 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy, contact at ###-####
Routing - Erosion and Sediment1/11/2011 1/11/2011 PASS
DetailsClint A Smith
ESC10-00930 plan approved per the attached conditions.
Routing PW Solid Waste  1/10/2011 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating1/10/2011 1/10/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage1/5/2011 1/7/2011 FAIL
DetailsBrian Murphy
NEEED CROSSDRAINAGE AGEEMENT
Routing - Addressing1/4/2011 1/4/2011 PASS
DetailsApril Wing
Plan resubmittals received  1/3/2011  
1-3-11 received 3 structural calcs,and 4 copies of sheets S1.0,S2.1 inserted by Jason Tomlinson.
Pending Assignment by JCM1/3/2011 1/3/2011 DONE
DetailsJohn Menard
Routing - PLANNING Land Div12/30/2010 1/3/2011 PASS
DetailsTodd Tucker
Pending Assignment by JCM12/30/2010 1/3/2011 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  12/30/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  12/30/2010 DONE
DetailsTisha Gallop
Application received 12/30/2010   
Routing PW Sewer Design     
DetailsMike Sheppard