Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02978
StatusFinaled
Name DAN HEMMER CONSTRUCTION INC
Site Address 13 S MESA VISTA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is to include the removal of the concrete slab in the existing 600s.f. 2-car garage and excavating to allow for a crawlspace under a new master suite. The project will also include the addition of a new 985s.f. 3-car side loading garage better utilizing the front driveway area. R-1C ok per Colleen Carroll. Hillside foundation submitted with plans. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. Separate electrical, plumbing, mechanical and ESC permits are required. ESC plan waiver request granted as the rear of the lot adjacent to the descending slope is at least 40 feet from construction and is protected by existing walls that make the rear yard non-accessible. All per the approved plans as marked Engineering, REScheck and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/1/20122/3/20122/3/2012APASS
DetailsJim Storey
laurie - please call 1/2 hr prior so she can meet you there Phone #: ###-####
DOC - Permit Finaled2/3/20122/3/20122/3/2012PPASS
DetailsJim Storey
BLD-Aging Inspection11/29/201111/29/201111/29/2011PPART
DetailsJim Storey
pending ele and pw sign offs
BLD-Energy code compliance3/1/20113/2/20113/2/2011PPASS
DetailsTom Arcoraci
dan Phone #: ###-####
BLD-Framing/Rough-in2/28/20113/1/20113/1/2011APASS
DetailsMike Jordan
Dan ###-####
BLD-Foundation1/14/20111/14/20111/14/2011PPASS
DetailsJim Storey
Jerry Phone #: ###-####
BLD-Footing1/12/20111/12/20111/12/2011PPASS
DetailsJim Storey
jerry Phone #: ###-####
Routing Walk-In (PW Hillside)12/30/201012/30/20101/3/2011PCANC
DetailsPerry Paine
addition is more than 40 feet from the hillside. No requirements.
PLANS/APPL TAKEN TO FRONT DESK  1/3/2011 DONE
Inspection Record Card- Bld  1/3/2011 DONE
Telephone call  1/3/2011 DONE
t/c w dan - permit ready and fees given
Permit Ready to Issue  1/3/2011 DONE
Details
Issue PAID IN FULL permit  1/3/2011 DONE
Routing Walk-In (BLD)12/30/201012/30/201012/30/2010ADONE
DetailsPerry Paine
Routing Walk-In (Zoning)12/30/201012/30/201012/30/2010APASS
DetailsColleen T Carroll
Plan assigned to (PEP)12/30/201012/30/201012/30/2010 PASS
DetailsPerry Paine
Case Summary (BLD)  12/30/2010  
Inspection Record Card- Bld  12/30/2010 DONE
1st review completed  12/30/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/30/2010 DONE
CHANGE STATUS TO (REV)  12/30/2010  
Application received 12/30/2010