Third Notice | | 7/12/2011 | 9/23/2011 | | DONE |
|
|
|
final value given by Vertical Corp
|
DOC - Permit Finaled | | | 6/29/2011 | | DONE |
Tisha Gallop
|
|
|
passed required inspections
|
FIRE-Final Inspection | 3/14/2011 | 3/14/2011 | 3/15/2011 | P | PASS |
Forrest France
|
|
|
Ref. permit activity notes.
|
BLD-Final | 2/2/2011 | 2/2/2011 | 2/2/2011 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 2/2/2011 | 2/2/2011 | 2/2/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Final | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | FAIL |
Mike Jordan
|
|
|
mike Phone #: ###-####. Needs to provide approved plans and engineering as well as post the max. weight limit signs on racking as noted on permit.
|
FIRE-Conference | 1/20/2011 | 1/19/2011 | 1/20/2011 | A | PEND |
Forrest France
|
|
|
Pending FIR11-00024- ref. previous activity note.
|
FIRE-Final Inspection | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | NR |
Forrest France
|
|
|
Pending project related building and fire alarm permit finals. NOTE: Project related FIR11-00026 has not yet been reviewed, issued, inspected or approved at this time.
|
Issue PAID IN FULL permit | | | 1/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 1/10/2011 | | DONE |
Tim Frost
|
|
|
Failed - Plan Check
|
Routing - PLAN CHECK | 1/10/2011 | | 1/10/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 1/10/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2011 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2011 | | DONE |
|
|
|
|
Telephone call | | | 1/10/2011 | | DONE |
|
|
|
1-10-11 called Jason left message permit ready and fee given ///dld
|
Plan assigned to (SRZ) | 1/3/2011 | | 1/10/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 1/6/2011 | | 1/10/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.\
|
Plan resubmittals requested | | | 1/6/2011 | | DONE |
Sam Zahorka
|
|
|
Need corrections to rack layout due to dead end issue, verification of 5" slab per engineers design at proposed installation location and Statement of special inspection for anchors signed by the Engineer.
|
Plan resubmittals received | | | 1/6/2011 | | DONE |
Sam Zahorka
|
|
|
New rack layout.
|
Telephone call | | | 1/6/2011 | | DONE |
Sam Zahorka
|
|
|
Spoke with the applicant and the engineer about needed corrections. Waiting for corrections.
|
Routing - PLAN CHECK | 1/3/2011 | | 1/5/2011 | | FAIL |
Sam Zahorka
|
|
|
Need corrections to rack layout due to dead end issue, verification of 5" slab per engineers design at proposed installation location and Statement of special inspection for anchors signed by the Engineer.
|
Pending Assignment by JCB | 12/30/2010 | | 1/3/2011 | | DONE |
Jason Blais
|
|
|
|
Application received | | 12/30/2010 | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
|