FIRE-Conference | 9/18/2012 | 10/2/2012 | 10/2/2012 | A | DONE |
Troy Cobbley
|
|
|
Permit is voided
|
FIRE-Conference | 9/12/2012 | 9/13/2012 | 9/18/2012 | A | DONE |
Troy Cobbley
|
|
|
I left message for Jim at Radix requesting job status as per the job history that I can access and the need to get the project finaled.
|
VOIDED CHANGE STATUS | | | 9/18/2012 | | DONE |
Barbara Stitt
|
|
|
Permit voided per conversation with Jim at Radix Construction//Contract fell thru and should have been expired or voided in 2011//BAS
|
BLD-Conference | 3/22/2011 | 3/22/2011 | 3/22/2011 | P | DONE |
Mike Jordan
|
|
|
john Phone #: ###-####. Went over exterior floor elevation issues at new exit door.
|
BLD-Framing/Rough-in | 2/4/2011 | 2/7/2011 | 2/7/2011 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior steel stud walls for demissing wall only. Also noted that contractor has indicated that the owner wants to hold off on construction od restrooms at this time, Waste and vent are being installed at this time. Noted to contgractor to get scope of work modified.
|
Issue PAID IN FULL permit | | | 2/4/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 1/3/2011 | | 2/3/2011 | | PASS |
Carl Westfall
|
|
|
1st review done
|
Routing - PLAN CHECK | 1/18/2011 | | 2/3/2011 | | DONE |
Carl Westfall
|
|
|
This permit was on the same drawings with another permit. The other permit was delayed for plan corrections. That delayed the issuance of this permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/3/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
called Radix Const. told him permit is ready and fees
|
Route to Impact Fee Review | 1/14/2011 | 1/20/2011 | 1/19/2011 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - FIRE | 1/14/2011 | 1/14/2011 | 1/18/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/18/2011 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/5/2011 | | 1/14/2011 | | PASS |
Carl Westfall
|
|
|
The IBC plan review was started on January 13 and was finished the next day. The drawings were approved. Additional work is required under a future tenant improvement permit to establishe occupancy (e.g. accessible parking spaces near entrance, drinking fountains, light fixtures, ventilation distribution, perhaps more toilets, etc.)
|
Routing - PUBLIC WORKS | 1/3/2011 | | 1/5/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 1/5/2011 | | 1/5/2011 | | PASS |
Cody Riddle
|
|
|
Cody Riddle; Office use in M-1 zone previously approved.
|
Routing - Addressing | 1/4/2011 | | 1/4/2011 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 12/30/2010 | | 1/3/2011 | | DONE |
Jason Blais
|
|
|
|
Application received | | 12/30/2010 | 12/30/2010 | | DONE |
Christina Prado
|
|
|
|
VOIDED CHANGE STATUS | | | 12/30/2010 | | DONE |
|
|
|
Permit not needed yet
|
CHANGE STATUS TO (REV) | | | 12/30/2010 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/30/2010 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/30/2010 | | DONE |
Christina Prado
|
|
|
|