Second Notice | | 5/30/2011 | 6/13/2011 | | DONE |
|
|
|
|
First Notice | | 5/30/2011 | 5/20/2011 | | DONE |
Christina Prado
|
|
|
Received 5/20/11
|
BLD-Final | 5/9/2011 | 5/10/2011 | 5/9/2011 | A | PASS |
Mike Jordan
|
|
|
john Phone #: ###-####. ok for perm. occ.
|
Permanent Occupancy | | | 5/9/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/4/2011 | 4/5/2011 | 4/5/2011 | A | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. Temp occ. granted. Will be ok for perm occ. once electrical signs off perm.
|
FIRE-Final Inspection | 4/4/2011 | 4/5/2011 | 4/5/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
Zoning Approval | 4/5/2011 | 4/5/2011 | 4/5/2011 | | DONE |
Cody Riddle
|
|
|
Zoning approval not required. CER 4/5/11
|
Temporary Occupancy UNPAID FEE | | | 4/5/2011 | | DONE |
Christina Prado
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 4/5/2011 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection.
|
FIRE-Final Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | FAIL |
Troy Cobbley
|
|
|
Repair the inoperative exit sign in the break room and repair the inoperative lense in the emergency light in the south vestible.
|
FIRE-Final Inspection | 3/31/2011 | 4/1/2011 | 4/1/2011 | A | FAIL |
Troy Cobbley
|
|
|
The arrrows on the exit signs need to be "punched out", exit signs relocated and additional exit signs installed as per the city approved plans. The push to exit buttons need to be provided at the two west exterior exit doors.
|
BLD-Final | 3/31/2011 | 4/1/2011 | 4/1/2011 | P | NR |
Tom Arcoraci
|
|
|
late pm please//John Phone #: ###-####
|
Zoning Approval | 3/31/2011 | 3/31/2011 | 3/31/2011 | | DONE |
David Moser
|
|
|
Office in M-1D/ Office use previously approved. No change to the existing site / landscaping and no new planning approval was required.
|
BLD-Framing/Rough-in | 3/8/2011 | 3/8/2011 | 3/8/2011 | P | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. Ceiling grid at new offices only. Remainder of grid is existing.
|
Plan assigned to (CJW) | 3/4/2011 | 3/4/2011 | 3/7/2011 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 3/4/2011 | | 3/7/2011 | | PASS |
Carl Westfall
|
|
|
Approved the Plan Modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
Left a voice message for Hal Hofheins that permit is ready & fees due on 3-7-11 @ 10:50am///BAS
|
CHANGE STATUS TO (ISS) | | | 3/7/2011 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/7/2011 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/4/2011 | | DONE |
Christina Prado
|
|
|
Plan Modification accepted for 8757 W Emerald BLD10-02989. Plan Mod for Electrical, Lighting and Plumbing changes and a change in the furniture plan; submitted on A210, P100, E001, E100 and E200;Routed to Carl Westfall
|
FIRE-Conference | 3/3/2011 | 3/3/2011 | 3/3/2011 | A | DONE |
Troy Cobbley
|
|
|
I spoke to the job super intendant about that it appears that there will be significant changes in the sprinkler plans that will require resubmittals/plan modifications.
|
BLD-Framing/Rough-in | 2/23/2011 | 2/23/2011 | 2/23/2011 | P | PASS |
Mike Jordan
|
|
|
additional structural support//Jon Phone #: ###-####. Visually inspected the structural upgrade work to the roof joist for additional rtu unit. All work was done per RFI from structural engineer of record.
|
BLD-Framing/Rough-in | 2/11/2011 | 2/11/2011 | 2/11/2011 | P | PART |
Mike Jordan
|
|
|
jon Phone #: ###-####. Interior steel stud framing for a managers office that was moved. Needs to sumbit plan modification showing the new office location as well as the vestibule on vanilla finsh side. Contractors was notified.
|
BLD-Framing/Rough-in | 2/4/2011 | 2/7/2011 | 2/7/2011 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior steel stud walls only.
|
Issue PAID IN FULL permit | | | 2/4/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 1/3/2011 | | 2/3/2011 | | PASS |
Carl Westfall
|
|
|
1st review done
|
Routing - PLAN CHECK | 1/31/2011 | | 2/3/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/3/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
called Radix Const. told him permit is ready and fees.
|
Routing - PLAN CHECK | 1/18/2011 | | 1/31/2011 | | FAIL |
Carl Westfall
|
|
|
Completed the resubmittal review. One item remained unresolved. Sent E-mail to the Architect, etc.
|
Telephone call | | | 1/31/2011 | | DONE |
|
|
|
Called Mark Gordon with "Red Built" and called Bob Peters (Project Structural Engineer) to discuss the capacity of the existing roof joists. He said he would ask the contractor to get the as built roof design so the actual capacity of the roof joists can be determined.
|
Telephone call | | | 1/31/2011 | | DONE |
|
|
|
Called Hal Hofheins, Architect, and left a message. Told him that the actual capacity of the roof joists need to be determined. To do this, the original as-builts are required.
|
Plan resubmittals received | | | 1/25/2011 | | DONE |
Christina Prado
|
|
|
Received 2 sets of structural calcs, 2 sets of HVAC Load Analysis packets, and 2 sets of plans A200, A310, M100, M200, E100 & E300. Routed to Carl Westfall for review.
|
Route to Impact Fee Review | 1/14/2011 | 1/19/2011 | 1/19/2011 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - FIRE | 1/14/2011 | 1/14/2011 | 1/18/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/18/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 1/5/2011 | | 1/13/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on January 6, 2011 and finished on January 13, 2011. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 1/3/2011 | | 1/5/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 1/5/2011 | | 1/5/2011 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - Office in M-1D/ Office use previously approved.
|
Routing - Addressing | 1/4/2011 | | 1/4/2011 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 12/30/2010 | | 1/3/2011 | | DONE |
Jason Blais
|
|
|
|
Application received | | 12/30/2010 | 12/30/2010 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/30/2010 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/30/2010 | | DONE |
Christina Prado
|
|
|
|