Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-00021
StatusFinaled
Name MORGAN CONSTRUCTION
Site Address 3550 W AMERICANA TERR
Project NameRIVERVIEW REHABILITATION
Customer Number 
ePlanReviewNo
Description
RIVERVIEW REHABILITATION - To construct a 25,100 sq. ft., single story, Type V-1hour, "I-2" Occupancy with "A-2 Dining and "B" occupancy Admin & Support Areas, Skilled Nursing Transitional Care Facility, restricted to 30 Beds in 30 Bedrooms as Private Suites. Patient occupant load is limited by certificate of occupancy and license by IDHW, W/ associated service areas, site work & parking. This building is fully sprinklered with alarm system based on occupancy use classification. Associated Dining Area (A2 occ.) is to be posted as Maximum Occupant Load "58". drs DRH10-00243; CUP10-00063
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/28/20135/6/2013 DONE
DetailsChristina Prado
complete 5-6-13
Print Statement  5/6/2013 DONE
DetailsChristina Prado
Second Notice 4/1/20134/23/2013 DONE
DetailsChristina Prado
mailed 4-23-13
First Notice 2/24/20133/22/2013 DONE
Permanent Occupancy  2/14/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection2/13/20132/13/20132/13/2013APASS
DetailsForrest France
Fire life safety final inspection passed. C/N items finished.
BLD-Final2/13/20132/13/20132/13/2013PPASS
DetailsTom Arcoraci
BLD-Final2/13/20132/13/20132/13/2013APASS
DetailsTom Arcoraci
BLD-Final2/12/20132/13/20132/13/2013ACANC
DetailsTom Arcoraci
BLD-Final2/11/20132/12/20132/12/2013PPART
DetailsTom Arcoraci
FIRE-Final Inspection2/11/20132/12/20132/12/2013APART
DetailsForrest France
Fire life safety walkthrough completed. Noted items in need of adjustment, repair or modification including closure at one set of double doors, exit signage, remove travel caps and covers at sprinklers, need to test EM lighting, project related fire alarm permit final pending. Remainder of inspection passed.
BLD-Final2/8/20132/11/20132/11/2013PNR
DetailsTom Arcoraci
Scott Hawker Phone #: ###-#### >> Inspection requested via web by Mattie Botero
Zoning Approval2/7/20132/7/20132/7/2013 DONE
DetailsAndrea Tuning
PubWorks Occupancy Approval2/4/20132/4/20132/4/2013 DONE
DetailsTiffany Lowery
Print Occupancy Form  1/3/2013 DONE
DetailsBarbara Stitt
BLD-Wall cover11/5/201211/6/201211/6/2012APASS
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero
BLD-Ceiling Grid Inspection10/25/201210/26/201210/26/2012APASS
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero grid ok
BLD-Wall cover10/2/201210/3/201210/3/2012APASS
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero
BLD-Wall cover9/25/20129/26/20129/26/2012APASS
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero wip ok
BLD-Framing/Rough-in9/17/20129/18/20129/18/2012APASS
DetailsTom Arcoraci
wip ok
BLD-Framing/Rough-in9/17/20129/17/20129/17/2012ADEFR
DetailsTom Arcoraci
BLD-Wall cover9/10/20129/10/20129/10/2012PPASS
DetailsTom Arcoraci
eng has oked holes drilled in glu lams
BLD-Framing/Rough-in9/5/20129/6/20129/5/2012ACANC
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero Inspection cancelled from web by: Mattie Botero
BLD-Framing/Rough-in9/4/20129/5/20129/5/2012APART
DetailsJim Sly
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero
Firestopping and non combustible fir downs....Patient rooms in East wing only.
BLD-Wall cover8/27/20128/28/20128/28/2012APART
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero wip ok
BLD-Wall cover8/21/20128/22/20128/22/2012APASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover8/7/20128/7/20128/7/2012PPASS
DetailsTom Arcoraci
ok for cover wip
BLD-Conference7/30/20127/30/20127/30/2012PPASS
DetailsTom Arcoraci
BLD-Conference7/11/20127/12/20127/12/2012APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in6/26/20126/26/20126/26/2012PPART
DetailsJim Storey
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero west wing ok to insulate and start gyp on ceilling.
FIRE-Sprinkler Rough-in6/26/20126/26/20126/26/2012PFAIL
DetailsTroy Cobbley
Terry Boyle Phone #: ###-####. I left two voice messages for the contact. One letting him know I was on the way and another after looking around the job site and not making contact. I spoke to a sprinkler fitter from Treasure Valley Fire Protection and he knew nothing of a requested sprinkler inspection. I let Forrest know of the situation.
BLD-Wall cover6/8/20126/8/20126/8/2012PPASS
DetailsTom Arcoraci
wip ok
BLD-Framing/Rough-in6/1/20126/1/20126/1/2012PPART
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero wip ok rock showers ok
BLD-Framing/Rough-in5/22/20125/23/20125/23/2012APART
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero wip shear ok
BLD-Other5/1/20125/1/20125/1/2012PPASS
DetailsTom Arcoraci
BLD-Other4/30/20125/1/20125/1/2012ACANC
DetailsTom Arcoraci
Terry Boyle Phone #: ###-#### >> Inspection requested via web by Mattie Botero
FIRE-Conference3/9/20123/9/20123/9/2012PDONE
DetailsForrest France
Regarding project related fire alarm work, final acceptance testing, and fire life safety inspection details.
BLD-Conference2/26/20122/28/20122/28/2012APASS
DetailsTom Arcoraci
Contact Terry Boyle ###-#### if any questions. Phone #: ###-#### >> Inspection requested via web by Scott Hawker
BLD-Foundation1/31/20122/1/20122/1/2012APASS
DetailsTom Arcoraci
Scott Hawker

MTI Scheduled for special inspection Phone #: ###-#### >> Inspection requested via web by Mattie Botero pending spec insp
BLD-Foundation1/27/20121/27/20121/27/2012PPASS
DetailsTom Arcoraci
Scott Hawker Phone #: ###-#### >> Inspection requested via web by Mattie Botero ok with special inspection
BLD-Foundation1/19/20121/19/20121/19/2012PPASS
DetailsTom Arcoraci
Scott Hawker Phone #: ###-#### >> Inspection requested via web by Mattie Botero
BLD-Foundation1/10/20121/10/20121/10/2012PPASS
DetailsTom Arcoraci
Scott MCI special inspection Phone #: ###-####
BLD-Footing12/30/201112/30/201112/31/2011APART
DetailsJim Sly
MTI is scheduled to do special inspection also. Phone #: ###-#### >> Inspection requested via web by Scott Hawker
MTI on site ...OK pend special insp, tests and approvals.....Footing at Center South, West wing, South side.
BLD-Footing12/22/201112/23/201112/23/2011APART
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Scott Hawker ok pending mti
BLD-Footing12/19/201112/19/201112/19/2011PPASS
DetailsTom Arcoraci
scott - ###-#### - rebar inspection
Print Occupancy Form  12/7/2011 DONE
Telephone call  12/7/2011 DONE
DetailsChristina Prado
Called and left voicemail for Gunnar giving fees due and advising of ACHD requirement
Permit Ready to Issue  12/7/2011 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  12/7/2011 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div12/3/2011 12/6/2011 PASS
DetailsTodd Tucker
Routing - PLAN CHECK12/6/2011 12/6/2011 PASS
DetailsDan Stuart
Plans approved to include redlined notes on plans and all attached plan review comments & conditions of all plan reviewing agencies.
Print Pending Permit.LaserJet4  12/6/2011  
Case Summary (BLD)  12/6/2011  
Telephone call  12/6/2011 DONE
DetailsDan Stuart
Called Gunnar Langhus, architect, concerning final plan review comments and conditions and redlined plans. Discussed door hardware and the redlined notes made to the Door / Hardware Schedule, particularly door fire ratings, closers and not allowing roller latches on doors 108A, 108B & 117. Also discussed the rated doors on several rooms not required under the IBC. Gunnar said they in response to the DHW State Review per NFPA 101. Gunnar was getting ready to e-mail me a copy of the conmpleted Statement of Special Inspections form #310.
Case Summary (BLD)  12/6/2011  
PLANS/APPL TAKEN TO FRONT DESK  12/6/2011 PASS
Plan review approval includes redlined notes on plans and all attached plan reviews & resubmittal documents.
Plan assigned to (DRS)1/5/2011 12/6/2011 PASS
DetailsDan Stuart
Routing - PLAN CHECK7/5/2011 12/3/2011 FAIL
DetailsDan Stuart
Copy of plan review e-mailed to architect. Plans routing to Planning Land Division for re-review.
Plan resubmittals received  11/30/2011 DONE
DetailsTisha Gallop
received two copies of plan sheets CS, FLS.01, A2.00a, A3.03, A4.02, A4.21, A4.50, A8.01; taken to Dan Stuart.
Plan resubmittals received  11/16/2011 DONE
DetailsChristina Prado
Received two copies of plans marked .CS, .FLS.01, A2.00a, A2.02, A4.21, A4.50, S1.01, S2.01, S2.02, S5.01, S5.02, S5.03, E2.31, P0.00, P2.11, P2.12, P2.21, P3.00, P4.00, P5.00, E0.01, E1.01, E1.02, E2.11, E2.21, E2.22, E2.31, E3.01, E4.01, E4.02, M0.00, M2.11, M2.21, M3.00, M3.01, M4.00 & M4.01. Plans given to Dan Stuart for review
Of plan sheets received the following indicated clouded changes to the plan sheet - CS, FLS.01, A2.00a, A4.21, A4.50, S1.01, S2.01, S2.02, S5.01, S5.02, S5.03, P2.11, P2.12, P2.21, E1.01, E2.11, E2.221, E2.31, E3.01, E4.01, E4.02, M2.11, M2.21 & M3.00. iNSERTED THES PLAN SHEET WITH CHANGES INTO THYE ORIGINAL PLANS OF 1-5-2011.
Routing - PLANNING11/9/2011 11/9/2011 PASS
DetailsDavid Moser
Plan Reviewer's activity  11/8/2011 DONE
E-mail to Gunnar Langhus, Architect asking for second set of resubmittals with cover letter, specifying that we only want plan sheets that have changes, not complete set of plans we need to sort through again to figure out what was done.
Plan resubmittals received  11/7/2011 DONE
Received a cover transmittal and one new complete set of plans sheets (NOTE Only Sheets CS, FLS.01, A2.00a, A4.21, A4.50, S2.01, S2.02, S5.01, S5.02, S5.O & E2.13 HAD CLOUDED CHANGES) 3CS, FLS.01, A1.01, A1.02, A2.00a, A2.01, A2.01s, A2.02, A3.01, A3.03, A3.04, A3.05, A3.10, A3.11, A3.12, A3.13, A4.01, A4.02, A4.10, A4.20, A4.21, A4.30, A4.31, A4.32, A4.35, A4.40, A4.50, A5.01, A5.02, A5.03, A5.04, A5.05, A6.01, A6.02, A7.01, A7.02, A7.03, A7.04, A8.01, A9.01, K1, K2, S1.01, S2.01, S2.02, S3.01, S3.02, S4.01, S5.01, S5.02, S5.03, S5.04, M0.00, M2.11, M2.21, M3.00, M3.01, M4.00M.01, P0.00, P2.11, P2.11, P2.12, P2.21, P3.00, P4.00, P5.00, E0.00, E0.01, E1.01, E1.02, E2.11, E2.21, E2.22, E2.31, E3.01, E4.01, E4.02, A2.01 and taken to Dan Stuart
Routing Off Site - STRUCTURAL10/19/2011 10/25/2011 PASS
DetailsDan Stuart
Called action couriers for pick up
10/25/11 - Received e-mail approving strcutural plan review corrections received 10/19/11. No further resubmittals required. Copy of report attached to this BLD.
Plan Reviewer's activity  10/18/2011 DONE
Set of Strcutural plan resubmittals and calcs to Christina Prado to route to off site structural re-review.
Plan resubmittals received  10/17/2011 DONE
DetailsChristina Prado
Received 3 sets (2 large sets, 1 11x17set) of plans marked S1.01, S2.01, S2.02, S4.01, S5.01, S5.02 & S5.03. Also Received two sets of structural calcs and one response letter. Plans given to Dan Stuart for review
Routing - Erosion and Sediment8/23/2011 8/23/2011 PASS
DetailsClint A Smith
ESC11-00004 plan approved with conditions attached to the permit.
Extend Review Timeline  8/18/2011 DONE
DetailsJason Blais
A 180 day extension from 7/4/11 is granted for an application under review. This is the first extension request.
Routing - PUBLIC WORKS6/28/2011 7/5/2011 PASS
DetailsBeverly Mountain
Request from Brian Murphy to re-circulate back to him.
Routing PW Drainage6/28/2011 7/5/2011 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/15/2011 6/28/2011 FAIL
DetailsDan Stuart
Routing back to PW per request by Brian Murphy.
Routing PW Sewer Rating6/15/2011 6/15/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS6/10/2011 6/15/2011 FAIL
DetailsBeverly Mountain
Received resubmittal sheets C-1 thru C-5 & CC&R Section Copy

Failed by Brian Murphy ###-####
Routing PW Drainage6/10/2011 6/14/2011 FAIL
DetailsBrian Murphy
NEEDS POSSIBLE REVISIONS
Routing - PLAN CHECK3/7/2011 6/10/2011 FAIL
DetailsDan Stuart
New Civil Sheets C-1 thru C-5 resubmitted. Routing back to PW for re-review.
Plan resubmittals received  6/9/2011  
DetailsTisha Gallop
received Article V. Easements, and three copies of plan sheets C1, C2, C3, C4, C5; taken to Dan Stuart.
Routing - FIRE2/24/20112/24/20113/7/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/7/2011 DONE
Failed Public Works, Erosion & Soil Control, Plumbing, Planning, Plan Check
Route to Impact Fee Review2/24/20113/1/20113/2/2011 PASS
DetailsCindy M. Gould
impact fees applied at the per room hotel rate for parks and commercial sq footage for fire and police.
Plan resubmittals requested  2/24/2011 DONE
Plan review items e-mailed to architect for response.
Routing - PLAN CHECK1/25/2011 2/24/2011 FAIL
DetailsDan Stuart
Resubmittals required. copy of plan review e-mailed to architect for response. Plans routed to fire code analyst for review.
Route to Impact Fee Review1/5/20111/10/20112/10/2011 PASS
DetailsCindy M. Gould
Routing - PLANNING1/25/2011 1/25/2011 FAIL
DetailsDavid Moser
CUP10-00063-David Moser. Fail ; Applicant needs to submit cross access / shared parking agreement between Lot 1 and Lot 2 of Serene Waters Sub. Called applicant on 1-25-11
Routing - PLANNING1/24/2011 1/25/2011 PASS
DetailsAndrea Tuning
Routing - PLUMBING1/19/2011 1/24/2011 PASS
DetailsBill VanDegrift
additional cross connection protection may be required
Routing - Erosion and Sediment1/18/2011 1/19/2011 FAIL
DetailsSteven Webb
ESC plan does not meet BCC 8-17 requirements. Checklist sent to applicant, re-submittal is required.
Routing - PUBLIC WORKS1/6/2011 1/18/2011 FAIL
DetailsBeverly Mountain
Failed by Brian Murphy contact at ###-#### and
Connie Baumgartner contact at ###-####
Routing PW Sewer Rating  1/18/2011 FAIL
DetailsConnie Baumgartner
Waiting for plumbing fixture information.
Routing Off Site - STRUCTURAL1/5/2011 1/18/2011 FAIL
DetailsBarbara Stitt
Called Action Couriers for pick up on 1-5-11 @ 12:00 for pick up
Structural plan review failed. copy of structural review comments needing to be addressed e-mailed to architect on 1/18/11.
Routing PW Sewer Design1/10/2011 1/18/2011 PASS
DetailsJon R. Gunnerson
Connect onto existing service provided.
Routing PW Drainage1/13/2011 1/18/2011 FAIL
DetailsBrian Murphy
MONDAY OFF MLK DAY FINISH REVIEW TUESDAY MORNING
NEED CROSSDRAINAGE ACCESS AGREEMENT AND CIVIL STAMP.
Routing PW Solid Waste1/10/2011 1/11/2011 PASS
DetailsPeter J. McCullough
Routing PW Environmental1/10/2011 1/10/2011 PASS
DetailsWalt Baumgartner
plans show segragated grease line to 1500 gal grease incpt
Routing - Addressing1/6/2011 1/6/2011 PASS
DetailsTerry Records
Routing PW Flood Plain1/6/2011 1/6/2011 PASS
DetailsTerry Records
Routing - PLANNING Land Div1/5/2011 1/6/2011 FAIL
DetailsTodd Tucker
Permit cannont be issued until the Serene Waters Final Plat (SUB10-00012)has been Recorded.
Application received 1/5/20111/5/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  1/5/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  1/5/2011 DONE
DetailsBarbara Stitt
Pending Assignment by JCM1/5/2011 1/5/2011 DONE
DetailsJohn Menard