Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00028
StatusFinaled
Name PINNACLE BUILDERS INCORPATED
Site Address 9175 W DONNYBROOK CT
Project NameMAPLE HILLS WELL HOUSE
Customer Number 
ePlanReviewNo
Description
United Water - Maple Hills Well House Addition - To construct a new 1,015 square foot, one story well house addition on the east side of an existing 1,450 square foot well house. The addition will be constructed of reinforced concrete masonry walls with wood roof trusses. A new 3068 access door will be installed at the existing wall between the new and existing portions of the building. The addition will house an existing onsite filter tank. This permit also includes related site improvements. This building was reviewed as a normally unoccupied structure. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/21/20111/3/2012 DONE
Third Notice 11/27/201112/9/2011 DONE
faxed
Third Notice 10/16/201111/7/2011 DONE
faxed
Second Notice 10/2/201110/11/2011 DONE
DetailsChristina Prado
faxed10/11/11
First Notice 9/16/20119/22/2011 DONE
Permanent Occupancy UNPAID FEE  9/6/2011 DONE
DetailsChristina Prado
BLD-Final9/1/20119/1/20119/1/2011PPASS
DetailsMike Jordan
Travis-Please call at least 30 mins prior to inspection Phone #: ###-####. OK for perm occ. No plumbing permit required per Bill V.
FIRE-Final Inspection8/31/20119/1/20119/1/2011APASS
DetailsTroy Cobbley
life safety passed.
PubWorks Occupancy Approval9/1/20119/1/20119/1/2011 DONE
DetailsTiffany Lowery
BLD-Final8/5/20118/8/20118/8/2011PNR
DetailsMike Jordan
Travis please call before going out Phone #: ###-####. Fire/life/safety final failed.
FIRE-Final Inspection8/5/20118/8/20118/8/2011AFAIL
DetailsTroy Cobbley
Provide an additional fire extinguisher and provide the building address.
BLD-Final8/4/20118/4/20118/5/2011PNR
DetailsTom Arcoraci
FIRE-Final Inspection8/4/20118/4/20118/4/2011PCANC
DetailsTroy Cobbley
Canceled due to inspection load. I requested for the contractor to reschedule.
BLD-Final8/4/20118/4/20118/4/2011PCANC
DetailsTom Arcoraci
Travis please call before going out as there is a gate code. Phone #: ###-####
BLD-Final8/1/20118/1/20118/1/2011PNR
DetailsJim Sly
Please call about 30min prior for access---Travis Phone #: ###-####
NR Need Plumb Final.
Zoning Approval7/12/20117/12/20117/12/2011 DONE
DetailsJoshua Johnson
BLD-Final7/8/20117/11/20117/11/2011ANR
DetailsMike Jordan
travis - please call for access Phone #: ###-####. Needs life/safety. Called and left message with travis.
BLD-Energy code compliance6/1/20116/1/20116/1/2011PPASS
DetailsMike Jordan
travis - ###-#### - please call for access
BLD-Framing/Rough-in5/31/20115/31/20115/31/2011PPASS
DetailsMike Jordan
travis - please call for access Phone #: ###-####
BLD-Foundation3/16/20113/17/20113/17/2011APASS
DetailsJim Storey
early as possible, concrete is at 10am//foundation stem walls//Travis Phone #: ###-####
BLD-Foundation3/14/20113/15/20113/15/2011APASS
DetailsMike Jordan
early as possible//Travis Phone #: ###-####
Issue PAID IN FULL permit  2/24/2011 DONE
DetailsBarbara Stitt
Routing - FIRE1/21/20111/21/20111/24/2011 PASS
DetailsTim Frost
Please, see attached review
Plan assigned to (JCM)1/6/2011 1/24/2011 PASS
DetailsJohn Menard
1st review completed  1/24/2011 DONE
Failed - Planning
Routing - PLAN CHECK1/24/2011 1/24/2011  
DetailsJohn Menard
Routing - PLANNING1/24/2011 1/24/2011 PASS
DetailsSusan Riggs
Staff level application submitted and approved. SAR
Routing - PLAN CHECK1/24/2011 1/24/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  1/24/2011 DONE
DetailsJohn Menard
Print Occupancy Form  1/24/2011 DONE
Telephone call  1/24/2011 DONE
t/c w nate - permit ready and fees given - also need gc, rce#, rp and ACHD receipt
Permit Ready to Issue  1/24/2011 DONE
Details
Route to Impact Fee Review1/21/20111/26/20111/21/2011 PASS
DetailsCindy M. Gould
Route to Impact Fee Review1/6/20111/11/20111/21/2011 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK1/19/2011 1/21/2011 PASS
DetailsJohn Menard
John Menard

Plan Reviewer's activity  1/21/2011 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural plans. JCM
Routing - PLUMBING1/13/2011 1/14/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - Erosion and Sediment1/13/2011 1/13/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC permit conditions. ESC11-00010
Routing PW Drainage1/10/2011 1/12/2011 PASS
DetailsBrian Murphy
Routing PW Sewer Rating1/12/2011 1/12/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS1/6/2011 1/12/2011 PASS
DetailsBeverly Mountain
Routing - Addressing1/7/2011 1/7/2011 PASS
DetailsTerry Records
Application received 1/6/20111/6/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  1/6/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  1/6/2011 DONE
DetailsBarbara Stitt
Pending Assignment by JCM1/6/2011 1/6/2011 DONE
DetailsJohn Menard
Routing - PLANNING Land Div1/6/2011 1/6/2011 PASS
DetailsDave Abo
Lot 9, Block 1 of Maple Hill Subdivision.
Intake Approval  1/6/2011 PASS
DetailsSam Zahorka
Routing - PLANNING1/14/2011   FAIL
DetailsSusan Riggs
CAA04-00139-Susan Riggs. I called applicant on 1-19-11 to let him know I did not have a staff level appproval for this additon in my data base. He will get back to me and/or submit a new application