BLD-Final | 3/3/2011 | 3/4/2011 | 3/4/2011 | A | PASS |
Dave Hannah
|
|
|
call when on way///Lisa ###-####
|
Permanent Occupancy | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety passed with the exception of surface mounted hasps and locks at the west and south exit doors to be removed prior to occpancy as discussed.
|
Case Summary (BLD) | | | 1/14/2011 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/14/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 1/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 1/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 1/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 1/6/2011 | | 1/14/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/12/2011 | | 1/14/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 1/6/2011 | | 1/12/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 1/11/2011 | | 1/12/2011 | | PASS |
Walt Baumgartner
|
|
|
Sutiable and Adequate grease abatement equipment required and shall be maintained in accordance with BMPs. Facility subject to post opening pretreatment compliance inspection.
|
Routing PW Sewer Rating | 1/11/2011 | | 1/12/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/10/2011 | | 1/10/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 1/6/2011 | 1/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/6/2011 | | DONE |
Tisha Gallop
|
|
|
|