Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00036
StatusFinaled
Name ALTA CONSTRUCTION
Site Address 3201 W AIRPORT WAY
Project NameBOISE AIRPORT
Customer Number 
ePlanReviewNo
Description
Boise Airport Landscape Upgrades, Keystone Retaining Wall and Parking Modifications - To extend an existing retaining wall approximately 395 lineal feet east with new Keystone concrete block retaining wall. The retaining wall will vary in height from approximately six feet to twelve feet. The Keystone concrete blocks will be supported by a minimum 30 inch wide by 12 inch deep unreinforced concrete or compacted crushed stone base. There will be a crushed rock drainage system installed behind the retaining wall. This permit also includes associated adjacent asphalt parking lot modifications and upgrading some landscaping. The new work is being done east of the existing FAA Tower. All construction per the approved engineered plans and calculations. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/19/20133/19/20133/21/2013 DONE
DetailsJim Storey
MAILED 3-22
BLD-Aging Inspection3/13/20133/14/20133/19/2013APASS
DetailsJim Storey
DOC - Permit Finaled3/19/20133/19/20133/19/2013PPASS
DetailsJim Storey
BLD-Conference8/1/20118/1/20118/1/2011APASS
DetailsJim Storey
BLD-Aging Inspection4/29/20114/29/20114/29/2011 FAIL
DetailsJim Storey
no requist for insp.
Issue PAID IN FULL permit  1/28/2011 DONE
DetailsTisha Gallop
Received Certificate of Value  1/27/2011 DONE
DetailsBarbara Stitt
Revised cert of value
Routing - PLAN CHECK1/21/2011 1/24/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  1/24/2011 DONE
DetailsJohn Menard
Inspection Record Card- Bld  1/24/2011 DONE
Permit Ready to Issue  1/24/2011 DONE
DetailsBarbara Stitt
Telephone call  1/24/2011 DONE
DetailsBarbara Stitt
Left Martin Hale a voice message that permit is ready, fees due, need RCE, rce #, and RP on 1-24-11 @ 11:25am
Plan assigned to (JCM)1/7/2011 1/24/2011 PASS
DetailsJohn Menard
Routing - FIRE1/18/20111/18/20111/21/2011 PASS
DetailsTim Frost
No comments required due to limited scope of work.
1st review completed  1/21/2011 DONE
Route to Impact Fee Review1/18/20111/21/20111/19/2011 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK1/13/2011 1/18/2011 PASS
DetailsJohn Menard
John Menard
Routing - PLANNING1/13/2011 1/13/2011 PASS
DetailsJosh Wilson
Drh10-00220, 300 Josh Wilson
Routing PW Drainage1/11/2011 1/13/2011 PASS
DetailsBrian Murphy
Routing PW Sewer Rating1/13/2011 1/13/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS1/7/2011 1/13/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment1/13/2011 1/13/2011 PASS
DetailsSteven Webb
ESC11-00017 plan approved in accordance to the attached conditions.
Routing - Addressing1/11/2011 1/11/2011 PASS
DetailsTerry Records
Application received 1/7/20111/7/2011 DONE
DetailsTisha Gallop
Pending Assignment by JCM1/7/2011 1/7/2011 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  1/7/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/7/2011 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div1/7/2011 1/7/2011 PASS
DetailsTodd Tucker