First Notice | | 7/23/2011 | 8/11/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Jim Storey
|
|
|
ryan Phone #: ###-#### final ok
|
Temporary Occupancy | 6/27/2011 | 9/25/2011 | 6/27/2011 | | DONE |
Darla L Downs
|
|
|
|
BLD-Final | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | PART |
Dave Hannah
|
|
|
Brian Phone #: ###-#### ok for temp occ ok for perm occ after mec gos perm
|
FIRE-Final Inspection | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable. One EM light repaired while on site, signage at the electrical room and elevator lobbies to be posted as discussed.
|
FIRE-Final Inspection | 6/21/2011 | 6/22/2011 | 6/22/2011 | P | NR |
Forrest France
|
|
|
Final pending project related FIR permit.
|
PubWorks Occupancy Approval | 6/17/2011 | 6/17/2011 | 6/17/2011 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/15/2011 | 6/15/2011 | 6/15/2011 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Other | 6/3/2011 | 6/6/2011 | 6/6/2011 | A | PART |
Dave Hannah
|
|
|
RYAN Phone #: ###-#### ceiling in basement ok to cover
|
BLD-Wall cover | 5/20/2011 | 5/20/2011 | 5/23/2011 | P | PASS |
Dave Hannah
|
|
|
Ceiling cover--Ryan Phone #: ###-#### ok to cover first floor
|
Case Summary (BLD) | | | 5/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Framing/Rough-in | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-#### ext canopy
|
BLD-Wall cover | 4/7/2011 | 4/8/2011 | 4/11/2011 | P | PASS |
Dave Hannah
|
|
|
ryan Phone #: ###-#### ok to cover the rest of first floor and all of the basement
|
BLD-Energy code compliance | 4/1/2011 | 4/4/2011 | 4/5/2011 | P | PART |
Dave Hannah
|
|
|
ryan - as soon as possible after lunch please Phone #: ###-#### ok to cover first floor
|
BLD-Framing/Rough-in | 3/30/2011 | 3/31/2011 | 3/31/2011 | A | PART |
Dave Hannah
|
|
|
ryan Phone #: ###-#### ok to insulate ext wall basement and first floor
|
BLD-Other | 3/18/2011 | 3/21/2011 | 3/22/2011 | P | PART |
Dave Hannah
|
|
|
rebar in masonry//Ryan Smith Phone #: ###-#### elevator cmu walls ok to grout
|
BLD-Concrete | 3/17/2011 | 3/18/2011 | 3/18/2011 | P | PART |
Jim Sly
|
|
|
late pm//Ryan (or Matt @ ###-####) Phone #: ###-#### Looked at Stairway wall East side.....walls for Ramp and stairway- South side......2500 PSI design strength...Contractor says he is ordering 3500 mud.....Eng. only required 3000. Looked at CMU elevator shaft...Rebar in place and appears OK up to 6' high. They should call daily for inspection of CMU. Need test samples on Mortar. Supervisor for Benington was just filling in for today...his name was Matt. I let him know all this.
|
BLD-Foundation | 3/9/2011 | 3/10/2011 | 3/11/2011 | A | PASS |
Dave Hannah
|
|
|
late A.M. call before arrival--Ryan Phone #: ###-#### ftgs for stairs into basement and ada ramp
|
BLD-Concrete | 3/3/2011 | 3/4/2011 | 3/4/2011 | A | PASS |
Mike Jordan
|
|
|
ryan - pouring at 10 Phone #: ###-####. Reinforcement for elevator pit ok. Also noted to contracotr that design professional as required special inspection as per table 1704 that has been submitted.
|
Issue PAID IN FULL permit | | | 2/28/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/25/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/25/2011 | | DONE |
|
|
|
t/c w tom - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 2/25/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/24/2011 | | 2/25/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after insertion of revised drawings.
|
Plan assigned to (CJW) | 1/11/2011 | | 2/25/2011 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 2/24/2011 | | |
Barbara Stitt
|
|
|
Received a cover transmittal and 2 copies of sheets F-1.0 & F-1.1 then taken to Carl Westfall
|
Routing - PLUMBING | 2/24/2011 | | 2/24/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 2/16/2011 | | 2/24/2011 | | FAIL |
Carl Westfall
|
|
|
Waiting for revised fire alarm sheet.
|
Plan resubmittals received | | | 2/18/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal, response, memo addressed to Jason Blais, Alternate request addressed to Jason Blais, copy of e-mail from Nick Schmit to Carl Westfall, and two copies of plan sheets G2.0 A2.1, A3.0, A3.1, A3.3, A5.2, A5.3, A8.0 A8.1, E0.1, E2.0, E2.1, E2.2, E3.0, E3.1, E4.0, M2.0, M2.1, M3.0, P2.0, P2.1, P3.0; taken to Carl Westfall
|
Route to Impact Fee Review | 2/15/2011 | 2/18/2011 | 2/17/2011 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - FIRE | 2/15/2011 | 2/15/2011 | 2/16/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 2/16/2011 | | FAIL |
|
|
|
Failed Plumbing, Plan Check
|
Telephone call | | | 2/15/2011 | | DONE |
|
|
|
Called Ryan with the GC (###-####). Explained that after Plumbing approves the drawings then we could issue an early start maybe by Wednesday 2-23-11. If the resubmittal is submitted this week and the all is OK, full permit could be ready by Friday 2-25-11.
|
Routing - PLAN CHECK | 1/28/2011 | | 2/15/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review report was started on January 31, 2011 and was finished on February 15, 2011. Revised drawings were required. See the plan review report.
|
Routing - Design Review | 1/27/2011 | | 1/28/2011 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH10-00277
|
Routing - PLUMBING | 1/21/2011 | | 1/27/2011 | | FAIL |
Bill VanDegrift
|
|
|
(1) due to the elevation of the sewer and the ceiling heights with in the building, the 1st floor waste piping is approved to combine with the basement piping and rout to the ejectors. (2) isolate the water in the lab with hot and cold r.p.s installed over a drain to handle full discharge. (3) replace the 2 1/2" r.p. on the premise with a 2 1/2" dcva. (4) addres items 1 and 2 and resubmit.
|
Routing - Erosion and Sediment | 1/20/2011 | | 1/21/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00018
|
Routing - PUBLIC WORKS | 1/13/2011 | | 1/20/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 1/13/2011 | | 1/19/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/19/2011 | | 1/19/2011 | | PASS |
Hank Alarcon
|
|
|
|
Routing - Addressing | 1/13/2011 | | 1/13/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 1/13/2011 | | 1/13/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 1/10/2011 | | 1/11/2011 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 1/11/2011 | | DONE |
Jason Blais
|
|
|
Sent email to architect representative for them to contact ACHD and submit needed documents for evaluation of any impact fees due. Our Permit Counter will need a verification letter from ACHD prior to the building permit being issued.
|
Application received | | 1/7/2011 | 1/10/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/10/2011 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/10/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/10/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/7/2011 | | FAIL |
|
|
|
Structural sheets are required to be stamped by the engineer CDM
|