BLD-Final | 8/12/2011 | 8/15/2011 | 8/15/2011 | A | PASS |
Dave Hannah
|
|
|
Chad Phone #: ###-####
|
DOC - Permit Finaled | 8/15/2011 | 8/15/2011 | 8/15/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 8/12/2011 | 8/12/2011 | 8/12/2011 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Energy code compliance | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | DEFR |
Jim Storey
|
|
|
chad Phone #: ###-####
|
BLD-Framing/Rough-in | 4/20/2011 | 4/20/2011 | 4/21/2011 | P | PART |
Dave Hannah
|
|
|
CHAD (CONF ,SHEER & RI) With ENG 4 PM Phone #: ###-#### ok to cover ext shear was renailed and is per city approved plans framing ok all but for one hold down on se wall right of fire place needs to be instaled framing contractor builder and the builders engineer all on site for this inspection. engineer ok stru changes made and was ok with framing energy star inspector also on site walking project . Troy with boise city mec inspection also on site has several items said it was ok to insulate but dont cover until he signs off so ok to insulate.
|
BLD-Framing/Rough-in | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | FAIL |
Dave Hannah
|
|
|
CHAD Phone #: ###-#### shear nailing on ext not per plan do not cover
|
BLD-Footing | 3/9/2011 | 3/9/2011 | 3/9/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 3/7/2011 | 3/8/2011 | 3/8/2011 | A | NR |
Dave Hannah
|
|
|
BILL Phone #: ###-#### footings and site are very muddy contractor will wait for site to dry out so they dont have to remove bar to clean out
|
BLD-Footing | 3/4/2011 | 3/4/2011 | 3/7/2011 | P | CANC |
Dave Hannah
|
|
|
aaron Phone #: ###-####
|
PubWorks Subgrade Approval | 3/4/2011 | 3/4/2011 | 3/4/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 3/2/2011 | 3/3/2011 | 3/3/2011 | P | CANC |
Dave Hannah
|
|
|
BILL Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/8/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/8/2011 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 1/13/2011 | 1/13/2011 | 2/1/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/1/2011 | | 2/1/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/1/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2011 | | DONE |
|
|
|
2-1-11 called Chad permit ready and fee given ///dld
|
Routing - MECHANICAL | 1/13/2011 | | 1/31/2011 | | PASS |
Troy James
|
|
|
1. Need components construction data.
2. Need Right J worksheet for the entire house.
3. Wrong method used on design info./use simplified.
4. Need static pressure for heating equipment.
5. Need expanded performance data.
6. Furnace location for second floor? If in attic, the btu load is to low.
7. Air conditioner location for upstairs furnace?
8. AED assessment not required for plan review.
9. This is not a complete review due to missing information.
|
Routing - PLAN CHECK | 1/24/2011 | | 1/30/2011 | | FAIL |
Carl D Madsen
|
|
|
2009 Res-Check and additional engineers stamp is required.
Sent E-Mail to Chad at Envision Homes 1-30-11 CDM
|
1st review completed | | | 1/30/2011 | | FAIL |
|
|
|
Current Res-Check required and additional engineers stamp is required as well as mechanical sign off. CDM
|
Routing - FIRE | | | 1/24/2011 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 1/19/2011 | | 1/20/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00020
|
Route to Impact Fee Review | 1/10/2011 | 1/13/2011 | 1/19/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 1/13/2011 | | 1/13/2011 | | PASS |
Cody Riddle
|
|
|
Construction subject to standards of the WUI Valley zone.
|
Routing - PUBLIC WORKS | | | 1/13/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/11/2011 | | 1/13/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Grading-Hillside | 1/11/2011 | | 1/13/2011 | | PASS |
Terry Records
|
|
|
Approved as category 1 by CFH10-00030
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 1/10/2011 | | PASS |
Barbara Stitt
|
|
|
|
Application received | | 1/7/2011 | 1/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | | | | | |
Carl D Madsen
|
|
|
Carl Madsen
|