Second Notice | | 3/27/2011 | 3/31/2011 | | DONE |
|
|
|
|
First Notice | | 3/6/2011 | 3/17/2011 | | DONE |
|
|
|
|
BLD-Final | 2/23/2011 | 2/24/2011 | 2/24/2011 | P | PASS |
Mike Jordan
|
|
|
ben Phone #: ###-####. ok for perm. occ.
|
FIRE-Final Inspection | 2/23/2011 | 2/24/2011 | 2/24/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Plan Reviewer's activity | | | 2/24/2011 | | DONE |
Tim L. Woodard
|
|
|
Accepted revised plans from applicant indicating different as is conditions. The restroom shown on the orginal set was never actually a restroom. This space is covered by the core restrooms and therefore it is inconsequential that the restroom is actually an Inventory room. TLW
|
Permanent Occupancy UNPAID FEE | | | 2/24/2011 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | FAIL |
Troy Cobbley
|
|
|
Repair the smoke evac system and re-test, provide annual inspection for the fire extinguisher and mount, remove the deadbolt and provide single action hardware on the rear storage room, contact plan review about resubmittals for the missing restroom. (Per tim woodard a revised drawing will be required for the non-required restroom)
|
BLD-Final | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | CANC |
Mike Jordan
|
|
|
Ben Bird Phone #: ###-####
|
BLD-Other | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PASS |
Mike Jordan
|
|
|
Ben Bird Phone #: ###-####. Ceiling grid ok.
|
BLD-Framing/Rough-in | 2/2/2011 | 2/2/2011 | 2/2/2011 | P | PASS |
Mike Jordan
|
|
|
brian Phone #: ###-####
|
Plan assigned to (TLW) | 1/12/2011 | | 1/28/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/28/2011 | | 1/28/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/28/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/28/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 1/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 1/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan Reviewer's activity | | | 1/20/2011 | | DONE |
Tim L. Woodard
|
|
|
Recieved voice mail from Ernie Woods with BTS indicating approval to issue plans without mall stamps. TLW
|
Routing - PLAN CHECK | 1/12/2011 | | 1/19/2011 | | FAIL |
Tim L. Woodard
|
|
|
Awaiting infromation from Ernie Woods or Stuart Buehner on mall approval for issuance. Need Lighting Compliance Report. TLW
|
1st review completed | | | 1/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 1/12/2011 | 1/12/2011 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/12/2011 | | DONE |
Christina Prado
|
|
|
|