Case Summary (BLD) | | | 9/15/2011 | | |
|
|
|
|
Permanent Occupancy | | | 2/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 1/27/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Jim Storey
|
|
|
don Phone #: ###-####
|
FIRE-Final Inspection | 1/27/2011 | 1/28/2011 | 1/28/2011 | A | PASS |
Forrest France
|
|
|
Corrections per previous inspection completed by S. Arellano verified for completion. Contractor to post building address numbers(1712) today as agreed.
|
BLD-Final | 1/26/2011 | 1/27/2011 | 1/27/2011 | P | NR |
Tony Young
|
|
|
don Phone #: ###-####
|
FIRE-Final Inspection | 1/26/2011 | 1/27/2011 | 1/27/2011 | A | FAIL |
Forrest France
|
|
|
Missing exit sign over east exit door.
|
FIRE-Final Inspection | 1/20/2011 | 1/26/2011 | 1/26/2011 | A | FAIL |
Troy Cobbley
|
|
|
I arrived at the business but the contact was not there and the man behind the bar did not have the city approved plans so no inspection was performed. I let the gentleman behind the bar know that if I did not return today the inspection would need to be rescheduled for tomorrow. Don Phone #: ###-####
|
BLD-Final | 1/20/2011 | 1/26/2011 | 1/26/2011 | P | NR |
Jim Storey
|
|
|
Don Phone #: ###-#### pending fire insp.
|
Issue PAID IN FULL permit | | | 1/20/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/12/2011 | | 1/19/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/12/2011 | | 1/19/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/19/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/19/2011 | | DONE |
|
|
|
|
Telephone call | | | 1/19/2011 | | DONE |
|
|
|
1-19-11 Called left message with Dennis permit ready ///dld
|
First Notice | | 2/21/2011 | | | |
|
|
|
|
Application received | | 1/12/2011 | | | |
|
|
|
|