Letter of compliance/Occupancy | | | 5/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 3/8/2011 | 3/9/2011 | 3/10/2011 | A | PASS |
Jim Sly
|
|
|
bryan Phone #: ###-#### Windows Etc. meet Energy code requirements.
|
BLD-Foundation | 2/7/2011 | 2/8/2011 | 2/8/2011 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/3/2011 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 1/13/2011 | 1/13/2011 | 2/2/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/27/2011 | | 2/2/2011 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/2/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/2/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/2/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/2/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/2/2011 | | DONE |
|
|
|
2-2-11 called Doug Lasher permit ready and fee given ///dld
|
Routing - MECHANICAL | 1/19/2011 | | 1/27/2011 | | PASS |
Troy James
|
|
|
1. Update Wrightsoft Program to version 8 when you get a chance please.
2. Component construction:
Show floor for bonus as over garage. Check tab for garage for exterior conditions.
Ceilings 16B-30ad: attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceiling ins. You are stating r-31 roof insulation and r-30 ceiling insulation.
Show on windows SHGC and NFRC rating.
3. Project Summary:
Air changes per hour for heating is .28 and .15 for cooling with 3000 square feet house or more, per Table 5A manual J.
4. Right-J worksheet internal gains for appliances too low. See manual J Table 6A.
5. Provide expanded performance data for equipment.
|
Route to Impact Fee Review | 1/13/2011 | 1/19/2011 | 1/21/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PUBLIC WORKS | | | 1/19/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 1/19/2011 | | 1/19/2011 | | PASS |
Colleen T Carroll
|
|
|
Approved as redlined; driveway shall be 33 feet wide Max in front yard setback
|
Routing - Addressing | 1/13/2011 | | 1/18/2011 | | PASS |
Terry Records
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/13/2011 | | DONE |
|
|
|
|
Intake Approval | | | 1/13/2011 | | PASS |
|
|
|
approved on 1-12-11 but was waiting on initial fees to be paid ///dld
|
Application received | | 1/12/2011 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
Carl D Madsen
|
|
|
|