BLD-Final | 10/25/2011 | 10/25/2011 | 10/25/2011 | P | DONE |
Tony Young
|
|
|
chris Phone #: ###-####
|
DOC - Permit Finaled | 10/25/2011 | 10/25/2011 | 10/25/2011 | P | PASS |
Tony Young
|
|
|
c of c issued
|
Zoning Approval | 10/21/2011 | 10/21/2011 | 10/21/2011 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Framing/Rough-in | 6/28/2011 | 6/29/2011 | 6/29/2011 | A | PASS |
Dave Hannah
|
|
|
TRENT Phone #: ###-#### this inspection was for the UL tested transition from masonry to metal pipe this all passes
|
BLD-Energy code compliance | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Dave Hannah
|
|
|
Trent Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2011 | 5/18/2011 | 5/18/2011 | P | PART |
Dave Hannah
|
|
|
trent Phone #: ###-#### ok to insulate will check fire blocking at insulation inspection still needs mec to check out fire place
|
BLD-Conference | 5/12/2011 | 5/12/2011 | 5/18/2011 | P | DONE |
Dave Hannah
|
|
|
home owner/ contracror will work with mec on chimney
|
BLD-Conference | 5/11/2011 | 5/11/2011 | 5/12/2011 | P | DONE |
Dave Hannah
|
|
|
trent Phone #: ###-#### talked about chimney they want to transition from the masonry to a triple wall flue pipe in the attic the fire place will now be a gas log set I oked this but told them this will need to be oked with mec inspector as for the gas log and venting is a mec issue
|
BLD-Aging Inspection | 4/19/2011 | 4/19/2011 | 4/25/2011 | | PASS |
Tony Young
|
|
|
|
Routing Walk-In (BLD) | 1/18/2011 | 1/18/2011 | 1/18/2011 | P | DONE |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 1/13/2011 | 1/13/2011 | 1/18/2011 | P | DONE |
Darla L Downs
|
|
|
|
Plan assigned to (PEP) | 1/12/2011 | 1/12/2011 | 1/18/2011 | | PASS |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 1/18/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/18/2011 | | |
|
|
|
|
Telephone call | | | 1/14/2011 | | DONE |
|
|
|
spoke with Applicant about the need for a design pro to help with the plans.
|
Routing Walk-In (BLD) | 1/12/2011 | 1/12/2011 | 1/13/2011 | P | DONE |
Darla L Downs
|
|
|
|
Routing Walk-In (Zoning) | 1/12/2011 | 1/12/2011 | 1/12/2011 | P | PASS |
David Moser
|
|
|
|
1st review completed | | | 1/12/2011 | | FAIL |
|
|
|
need more information
|
Application received | | 1/12/2011 | | | |
|
|
|
|