Third Notice | | 3/15/2012 | 3/2/2012 | | DONE |
|
|
|
|
Print Statement | | | 3/2/2012 | | DONE |
|
|
|
|
Third Notice | | 1/22/2012 | 3/1/2012 | | DONE |
|
|
|
faxed to Scott Hedrick Const.
|
Second Notice | | 1/13/2012 | 1/17/2012 | | DONE |
Christina Prado
|
|
|
faxed 1-17-12
|
Telephone call | | | 1/17/2012 | | DONE |
Tisha Gallop
|
|
|
Scott Hedrick Const called, said they just received 2nd notice but already turned in FV. Told him not see it in the computer please fax over again.
|
First Notice | | 12/26/2011 | 1/3/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/16/2011 | | |
|
|
|
|
Permanent Occupancy | | | 12/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Conference | 10/17/2011 | 11/17/2011 | 11/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
temp expires
|
Temporary Occupancy | 11/16/2011 | 2/14/2012 | 11/16/2011 | | DONE |
Barbara Stitt
|
|
|
Per request of Christy Little with ACHD the temp occupancy has been extended another 45 days as they are still working out an agreent regarding impact fees between the school board and ACHD commission in another 30 days. See email in the scanned documents dated 11-16-11//BAS
|
Change Expiration Date Only | | | 11/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 10/17/2011 | 10/17/2011 | 10/17/2011 | | PASS |
Tom Arcoraci
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 8/23/2011 | | DONE |
|
|
|
|
BLD-Final | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | PASS |
Tom Arcoraci
|
|
|
Tom, give me a call and I will meet you onsite. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
Zoning Approval | 8/15/2011 | 8/15/2011 | 8/15/2011 | | PASS |
David Moser
|
|
|
OK, as per CVA10-41 and CZC11-00174
|
BLD-Final | 7/29/2011 | 8/1/2011 | 8/1/2011 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Simon ok for temp needs grab bars in bathrooms
|
FIRE-Final Inspection | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 7/29/2011 | 7/29/2011 | 7/29/2011 | P | NR |
Tom Arcoraci
|
|
|
Tom, I need to talk with you about the final. Could you please com by early afternoon. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
FIRE-Final Inspection | 7/28/2011 | 7/29/2011 | 7/29/2011 | P | FAIL |
Troy Cobbley
|
|
|
Need the missing exit discharge light bulb installed, the fire alarm and fire sprinkler pemits to be finaled.
|
Zoning Approval Temp | 7/29/2011 | 7/29/2011 | 7/29/2011 | | PASS |
David Moser
|
|
|
Final Occupancy and zoning approval requires ZC for proposed changes and installation of modifed landscaping.
|
Zoning Approval | 7/27/2011 | 7/27/2011 | 7/27/2011 | | FAIL |
David Moser
|
|
|
Failed the zoning inspection since the landscaping is not complete. They requested temp zoning approval but bonding for the landscaping is required.
|
BLD-Conference | 7/21/2011 | 7/22/2011 | 7/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
Late am if possible. Ceiling inspection. The electrical inspector is coming by in the am and is going to allow us to get the borders installed. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Framing/Rough-in | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PASS |
Tom Arcoraci
|
|
|
Restroom framing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Energy code compliance | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
Tom, I should have something for you by mid-afternoon. Wall insulation and vapor barrier. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Energy code compliance | 6/21/2011 | 6/22/2011 | 6/22/2011 | A | CANC |
Tom Arcoraci
|
|
|
Looking at the insulation and vapor barrier in both wings. Late morning would be great. Phone #: ###-#### >> Inspection requested via web by Gary Simon Inspection cancelled from web by: Gary Simon
|
BLD-Framing/Rough-in | 6/21/2011 | 6/21/2011 | 6/21/2011 | P | PASS |
Tom Arcoraci
|
|
|
Rough in walls and underside of roof deck. Both wings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
PubWorks Occupancy Approval | 6/15/2011 | 6/15/2011 | 6/15/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Other | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
Roof nailing inspection. Both wings Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Final | 6/1/2011 | 6/1/2011 | 6/1/2011 | P | DEFR |
Mike Jordan
|
|
|
Grouting gridline 1 south wing (topped out) and the 10'' walls on gridlines F & G south wing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/27/2011 | 5/27/2011 | 5/27/2011 | A | DEFR |
Mike Jordan
|
|
|
Grouting cmu on North and South wings. 9:00am Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/24/2011 | 5/25/2011 | 5/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
Grout cmu @ 8'' on the S wing and 10'' on the interior walls of the N wing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/20/2011 | 5/20/2011 | 5/20/2011 | P | PART |
Jim Storey
|
|
|
CMU inspection please-Grout around 2:00--Gary Phone #: ###-#### placed w/si
|
CHANGE STATUS TO (ISS) | | | 5/20/2011 | | DONE |
Tisha Gallop
|
|
|
Plan mod approved and picked up
|
Plan assigned to (JCM) | 4/29/2011 | 4/29/2011 | 5/12/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/10/2011 | | 5/12/2011 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2011 | | DONE |
John Menard
|
|
|
|
Override - Parcel Holds | | | 5/12/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 5/12/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/12/2011 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told Gary with Scott Hedrick Construction that Plan Modification is ready and fees due is ready to issue on 5-12-11 @ 1:15PM//BAS
|
Routing - FIRE | 5/5/2011 | | 5/10/2011 | | PASS |
Scott Arellano
|
|
|
No seperate comments attached to modified plan sheets.
|
BLD-Concrete | 5/4/2011 | 5/4/2011 | 5/5/2011 | P | PART |
Tom Arcoraci
|
|
|
per Gary Simon this inspection is for the class room addition only (not the restroom) please call Gary ###-#### please verify brfore inspection.
|
Plan Reviewer's activity | | | 5/5/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved plan modification to convert existing classroom into two new children's accessible restrooms. JCM
|
Routing - PLAN CHECK | 5/3/2011 | | 5/5/2011 | | PASS |
John Menard
|
|
|
John Menard (plan mod)
|
Override - Parcel Holds | | | 5/4/2011 | | |
|
|
|
|
Routing - PLUMBING | 4/29/2011 | | 5/3/2011 | | PASS |
Bill VanDegrift
|
|
|
plan mod per plans and 2003 upc
|
Routing - PUBLIC WORKS | 4/29/2011 | | 4/29/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/29/2011 | | 4/29/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Modification Accepted | | | 4/28/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld11-00079 (Grace Jordan Elem School - classroom addtion) Taking an existing classrom and turning it into (2) restrooms; submitted on revised certificate of value and plan sheets A2.11, S0.1, S3.03, S6.02, M0.0, M1.0, M2.0, M3.0, M4.0, M5.0, E2.03; routed to PW, Plumbing and Plan Check (John Menard).
|
BLD-Foundation | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PART |
Tom Arcoraci
|
|
|
South wing foundation walls. Should be ready by 11:00am. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
PubWorks Occupancy Approval | 4/26/2011 | 4/26/2011 | 4/26/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Foundation | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | PART |
Tom Arcoraci
|
|
|
North wing foundation. South wing partial ftgs. Phone #: ###-#### >> Inspection requested via web by Gary Simon spec inspection
|
BLD-Footing | 4/18/2011 | 4/18/2011 | 4/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
Looking at the rebar in the ftgs. on both wings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
Issue PAID IN FULL permit | | | 3/29/2011 | | DONE |
|
|
|
|
Telephone call | | | 3/14/2011 | | DONE |
|
|
|
left vm for ed - permit ready and fees given - also need gc, rce#, rp and ACHD receipt
|
Permit Ready to Issue | | | 3/14/2011 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 3/9/2011 | | 3/11/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 3/9/2011 | | 3/11/2011 | | PASS |
Brian Murphy
|
|
|
playgrounds only
|
Routing - PLANNING | 3/11/2011 | | 3/11/2011 | | PASS |
Cody Riddle
|
|
|
|
Routing - PLAN CHECK | 3/11/2011 | | 3/11/2011 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2011 | | |
John Menard
|
|
|
|
Print Occupancy Form | | | 3/11/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/10/2011 | | |
Barbara Stitt
|
|
|
Received 1 copy of drainage report inserted into plans and taken back to Brain Murphy's desk
|
Plan resubmittals received | | | 3/9/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of drainage report, o & m manual, and five copies of plan sheets A1.01, C2.00, C2.10, C2.50; inserted by arch. rep. and taken back to John Menard.
|
CHANGE STATUS TO (PND) | | | 3/4/2011 | | DONE |
Rita DeYoung
|
|
|
John came over to take the plans back to Brian M to access fees. Permit is pending for now.
|
Plan Reviewer's activity | | | 3/3/2011 | | DONE |
John Menard
|
|
|
Reviewed and approved final plan review revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2011 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 2/15/2011 | | 3/3/2011 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 1/19/2011 | | 3/3/2011 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 2/28/2011 | | |
Barbara Stitt
|
|
|
Received 1 response letter from Ed Daniels dated 2-28-11, 2 copies of sheets S0.1, S1.01, S1.02, A2.01, A3.01, A7.01, A9.01, E2.01FL inserted into plans by architects office and returned to John Menard's desk
|
Plan resubmittals requested | | | 2/24/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a request for additional revisions. JCM
|
Plan resubmittals received | | | 2/22/2011 | | |
Barbara Stitt
|
|
|
Received cover transmital, response letter from Ed Daniels dated 2-18-11, 2 copies of response letter from Jonny Knopp dated 2-16-11, 3 copies of structural calculations, 2 copies of sheets A-1.01, A-2.01, A-2.10, A-7.01, 3 copies sheets S-0.1, S-1.01, S-1.02, S-1.03, S-2.01, S-3.01, S-3.02, S-3.03, S-4.01, S-5.01, S-6.01, S-6.02, S-7.01 all inserted by architects office then plans taken back to John Menards desk
|
Routing - FIRE | 2/10/2011 | 2/10/2011 | 2/15/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 2/15/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 2/10/2011 | 2/15/2011 | 2/14/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 2/11/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLAN CHECK | 1/31/2011 | | 2/10/2011 | | FAIL |
John Menard
|
|
|
John Menard
|
Routing Off Site - STRUCTURAL | 1/19/2011 | | 2/3/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 2/3/2011 | | DONE |
John Menard
|
|
|
Emailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - MECHANICAL | 1/31/2011 | | 1/31/2011 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/31/2011 | | 1/31/2011 | | PASS |
David Moser
|
|
|
CVA10-00041 David Moser; the landscape plan shows the trees along Fairfield Ave as being retained and 14 inch cal. of new trees are provided. Please note the revised landscape plan 2-9-11 for the final tree planting.
|
Routing - PLUMBING | 1/26/2011 | | 1/31/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 1/26/2011 | | 1/26/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00027 plan approved with conditions attached.
|
Routing - PUBLIC WORKS | 1/19/2011 | | 1/26/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 1/20/2011 | | 1/25/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | | | 1/25/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/20/2011 | | 1/20/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 1/14/2011 | 1/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 1/19/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING Land Div | 1/19/2011 | | 1/19/2011 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size. (8 acres)
|
Pending Assignment by JCM | 1/18/2011 | | 1/19/2011 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/18/2011 | | DONE |
Tisha Gallop
|
|
|
|