Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00080
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO
Site Address 7701 W NORTHVIEW ST
Project NameMorley Nelson Elementary
Customer Number 
ePlanReviewNo
Description
Morley Nelson Elementary School - Classroom Addition - To construct a 5,627 square foot, one story classroom and restroom addition at the south end of the south wing of an existing 58,243 square foot elementary school. The addition is constructed of masonry exterior walls with wood framed roof trusses and metal interior stud walls, to match existing school construction. The addition contains four new classrooms and two new accessible restrooms. This permit also includes related site improvements. The original school building was completed in 2008 under building permit BLD06-03277. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 12/26/20111/3/2012 DONE
Print Occupancy Form  12/16/2011 DONE
Permanent Occupancy UNPAID FEE  12/16/2011 DONE
DetailsBarbara Stitt
Temporary Occupancy UNPAID FEE  11/16/2011 DONE
DetailsBarbara Stitt
Per request of Christy Little with ACHD the temp occupancy has been extended another 45 days as they are still working out an agreent regarding impact fees between the school board and ACHD commission in another 30 days. See email in the scanned documents dated 11-16-11//BAS
CHANGE STATUS TO (TMP)  11/3/2011 DONE
First Notice10/14/201110/14/201110/19/2011 DONE
DetailsJim Sly
DOC - Permit Finaled10/14/201110/14/201110/14/2011PPASS
DetailsJim Sly
Temporary Occupancy UNPAID FEE  8/23/2011  
BLD-Final8/4/20118/5/20118/5/2011PPART
DetailsTony Young
ok for final pending all others,, paperwork from engineer is in the mailbox
FIRE-Final Inspection8/3/20118/5/20118/5/2011APASS
DetailsTroy Cobbley
life safety passed
BLD-Other8/3/20118/4/20118/4/2011ANR
DetailsTom Arcoraci
Jim, this is a call for the final structural inspection for occupancy. If any questions please feel free to call. Thanks Phone #: ###-#### >> Inspection requested via web by Ron Oswald
Zoning Approval8/2/20118/2/20118/2/2011 DONE
DetailsCody Riddle
PubWorks Occupancy Approval8/2/20118/2/20118/2/2011 DONE
DetailsTiffany Lowery
BLD-Framing/Rough-in7/25/20117/25/20117/25/2011APASS
DetailsJim Sly
We are ready to start flooding the ceiling grid. A late AM inspection would be very much appreciated. Phone #: ###-#### >> Inspection requested via web by Ron Oswald
BLD-Framing/Rough-in7/19/20117/19/20117/19/2011PDONE
DetailsMike Jordan
Please provide a cursory inspection on suspended ceiling grid. Entrance to site has change to school parking lot, east entrance. Phone #: ###-#### >> Inspection requested via web by Ron Oswald. Cisca 3-4 system to be used, grid exceeds nthe 2.5 lbs. per square foot.
BLD-Framing/Rough-in7/7/20117/8/20117/8/2011APART
DetailsJim Sly
Please provide a late morning hard lid inspection for the project restrooms. We have a am Electrical and have passed the HVAC and Plumbing roughs for this area.
Thanks Phone #: ###-#### >> Inspection requested via web by Ron Oswald
Hard lids in restrooms and restroom walls OK to cover. Trusses OK.
BLD-Framing/Rough-in6/29/20116/29/20116/29/2011PPART
DetailsTom Arcoraci
Please provide a interior wall framing inspection for cover. I have the main classrooms electrical inspections signed off for this area by the state. The restroom areas will be inspected for plumbing this afternoon. Thanks you Phone #: ###-#### >> Inspection requested via web by Ron Oswald classrooms ok for cover tom
BLD-Framing/Rough-in6/20/20116/21/20116/21/2011APART
DetailsJim Sly
We are currently installing the sheeting and If possible I would like to schedule my roofing crew in late morning. If able please schedule for the first of the morning. Thanks Ron Oswald Phone #: ###-#### >> Inspection requested via web by Ron Oswald
Roof sheathing and trusses OK
BLD-Concrete5/6/20115/9/20115/9/2011PPART
DetailsJim Sly
Changing inspection due to weather, we will pour on Tuesday AM. Afternoon inspection is prefered. Strata providing Special inspections also in afternoon. Thanks Phone #: ###-#### >> Inspection requested via web by Ron Oswald
OK pending STRATA special insp, tests and approvals.
BLD-Concrete5/6/20115/9/20115/6/2011ACANC
DetailsJim Sly
This inspection is for slab pour, We are Scheduled for concrete to arrive at 7:30 am. Don Hill with Strata is Handling the special inspections, Rebar, Wire mesh and pour observations. Underslab Plumbing has been inspected and logged with Sticker attached. Any Questions feel free to call me at anytime.

Thanks
Ron Oswald Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
BLD-Foundation4/21/20114/22/20114/22/2011PPASS
DetailsTom Arcoraci
wip ok spec insp
BLD-Foundation4/21/20114/21/20114/21/2011PNR
DetailsTom Arcoraci
Stem wall, Scheduled for 2:00 pm.
Thanks Phone #: ###-#### >> Inspection requested via web by Ron Oswald
BLD-Footing4/19/20114/21/20114/21/2011APART
DetailsMike Jordan
Good afternoon, We have a specific access road to get to project site. It is East of the school proper at our Company sign. If possible please schedule for as early as we can near 8:30 am. Thanks and have a great day
Ron Oswald Site Superintendent Phone #: ###-#### >> Inspection requested via web by Ron Oswald. Permiter and interior footings. Special inspector on site.
Issue PAID IN FULL permit  3/29/2011 DONE
DetailsBarbara Stitt
Telephone call  3/14/2011 DONE
left vm for ed - permit ready and fees given - also need gc, rce#, rp and ACHD receipt
Permit Ready to Issue  3/14/2011 DONE
Details
Routing - PUBLIC WORKS3/9/2011 3/11/2011 PASS
DetailsConnie Baumgartner
Routing - PLANNING3/11/2011 3/11/2011 PASS
DetailsCody Riddle
Routing - PLAN CHECK3/11/2011 3/11/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  3/11/2011 DONE
DetailsJohn Menard
Print Occupancy Form  3/11/2011 DONE
Plan assigned to (JCM)1/19/2011 3/11/2011 PASS
DetailsJohn Menard
Routing PW Drainage3/9/2011 3/10/2011 PASS
DetailsBrian Murphy
FOR PLAYGOUNDS SEEPAGE BEDS
Plan resubmittals received  3/10/2011  
DetailsBarbara Stitt
Received 5 copies of sheet C2.10 inserted into plans and returned back to Brian Murphy's desk
Routing - PLAN CHECK2/18/2011 3/9/2011 PASS
DetailsJohn Menard
Plan resubmittals received  3/9/2011 DONE
DetailsTisha Gallop
received two copies of o & m manual, five copies of plan sheets A1.01, C2.00, C3.00, C3.50; inserted by arch. rep. and taken back to John Menard.
Plan Reviewer's activity  2/28/2011 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Plan resubmittals received  2/22/2011 
DetailsBarbara Stitt
Received cover transmital, response letter from Ed Daniels dated 2-18-11, 2 copies of response letter from Jonny Knopp dated 2-16-11, 3 copies of structural calculations, 2 copies of sheets A-2.01, A-2.10, A-7.01, 3 copies sheets S-0., S-1.01, S-1.02, S-1.03, S-2.01, S-3.01, S-3.02, S-3.03, S-4.01, S-5.01, S-6.01, S-6.02, S-7.01 all inserted by architects office then plans taken back to John Menards desk
Routing - FIRE2/11/20112/11/20112/18/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/18/2011 FAIL
Failed Planning
Route to Impact Fee Review2/11/20112/16/20112/14/2011 PASS
DetailsCindy M. Gould
Plan resubmittals requested  2/11/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK1/31/2011 2/11/2011 FAIL
DetailsJohn Menard
John Menard
Routing Off Site - STRUCTURAL1/19/2011 2/3/2011 PASS
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  2/3/2011 DONE
DetailsJohn Menard
Emailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLANNING1/28/2011 1/31/2011 FAIL
DetailsCody Riddle
Expansion requires approval of a conditional use permit modification (staff level). Left message with architect this morning. CER 1/31/11
Routing - MECHANICAL1/31/2011 1/31/2011 PASS
DetailsTroy James
Routing - PLUMBING1/24/2011 1/28/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - Erosion and Sediment1/21/2011 1/24/2011 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00028
Routing - PUBLIC WORKS1/19/2011 1/21/2011 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating1/20/2011 1/21/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage1/20/2011 1/21/2011 PASS
DetailsBrian Murphy
Routing - Addressing1/20/2011 1/20/2011 PASS
DetailsTerry Records
Application received 1/14/20111/19/2011 DONE
DetailsTisha Gallop
Telephone call  1/19/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - PLANNING Land Div1/19/2011 1/19/2011 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Pending Assignment by JCM1/18/2011 1/19/2011 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  1/18/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/18/2011 DONE
DetailsTisha Gallop