BLD-Final | 3/23/2011 | 3/24/2011 | 3/24/2011 | A | PASS |
Mike Jordan
|
|
|
call for lock box code//Chad ###-####
|
DOC - Permit Finaled | 3/24/2011 | 3/24/2011 | 3/24/2011 | P | PASS |
Mike Jordan
|
|
|
Certificate of completion issued.
|
BLD-Energy code compliance | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | PASS |
Mike Jordan
|
|
|
chad Phone #: ###-####. Inspected the draft stop installation at dwelling unit seperation.
|
BLD-Energy code compliance | 2/21/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Mike Jordan
|
|
|
the door code for the south door is 1530 and the lockbox is on the gas meter if the door is locked. The overhead garage door should also be open to just lift up. Thanks Phone #: ###-#### >> Inspection requested via web by chad emery. Energy inspection ok. Contractor has chosen to use 5/8 type x rock mon the lid, will need to provide draftstop at dwelling unit seperation.
|
Routing Walk-In (Zoning) | 1/20/2011 | 1/20/2011 | 1/20/2011 | A | PASS |
David Moser
|
|
|
The duplex was built in 1974 in a R-2 zone. In 1974 a duplex was an allowed use in the R-2 zone and no planning approval was required.
|
Routing Walk-In (BLD) | 1/20/2011 | 1/20/2011 | 1/20/2011 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 1/20/2011 | 1/20/2011 | 1/20/2011 | | PASS |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/20/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 1/20/2011 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 1/20/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/20/2011 | | |
|
|
|
|
1st review completed | | | 1/20/2011 | | DONE |
|
|
|
|
Application received | | 1/20/2011 | | | |
|
|
|
|