Permanent Occupancy | | | 4/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 4/27/2011 | 4/28/2011 | 4/28/2011 | P | PASS |
Dave Hannah
|
|
|
adam Phone #: ###-####
|
FIRE-Final Inspection | 4/27/2011 | 4/28/2011 | 4/28/2011 | A | PASS |
Forrest France
|
|
|
Corrections verified for completion. Life safety passed.
|
FIRE-Final Inspection | 4/22/2011 | 4/22/2011 | 4/27/2011 | A | PART |
Forrest France
|
|
|
Signage provided, need to replace the fire extinguisher with a 2A10BC rated and certified canister.
|
BLD-Aging Inspection | 4/19/2011 | 4/19/2011 | 4/26/2011 | | PEND |
Forrest France
|
|
|
Final pending C/N items.
|
BLD-Final | 1/31/2011 | 2/1/2011 | 2/2/2011 | P | NR |
Dave Hannah
|
|
|
Adam Phone #: ###-#### needs fire final first
|
FIRE-Final Inspection | 1/31/2011 | 2/1/2011 | 2/1/2011 | A | FAIL |
Forrest France
|
|
|
Post two fire extinguishers as discussed, provide signage at the main entry/exit "door to remain..." per review notes. See permit documents for details.
|
Issue PAID IN FULL permit | | | 1/31/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/20/2011 | | 1/27/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/20/2011 | | 1/27/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/27/2011 | | DONE |
|
|
|
|
Telephone call | | | 1/27/2011 | | DONE |
|
|
|
t/c w adam - permit ready
|
Permit Ready to Issue | | | 1/27/2011 | | DONE |
|
|
|
|
First Notice | | 5/9/2011 | | | |
|
|
|
|
Application received | | 1/20/2011 | | | |
|
|
|
|