Permit Information
Permit NumberBLD11-00125
StatusFinaled
Name ASIN HOMES
Site Address 513 E MAIN ST
Project NamePengillys Saloon
Customer Number 
ePlanReviewNo
Description
(PENGILLY'S SALOON)(EXPANSION WITHIN EXISTING BUILDING TO INCLUDE 1ST AND 2ND FLOORS AND BASEMENT FOR ONE TENANT) Remodel of an existing 1,678 sq. ft. bar, expanding into the adjacent 1,312 sq. ft. space per approved plans. New total area of the tenant space will be 2,990 sq. ft. on first floor; combining of 1,047 sq. ft. portion of 2nd floor with 1,942 sq. ft. area above Pengilly's for 2,989 sq. ft. office area. Combining the two former basement areas totaling 2,880 sq. ft. Stair to crawl space area originally serving Old Boise Guitar side is being removed and new opening for access between two crawl space areas is being installed. New expansion space of 1st, second & basement were formerly occupied by "Old Boise Guitar". Work to include select interior demolition, new structural beam, posts and connectors at new wall openings; new fully accessible restrooms on 1st floor; new stairway between 1st & 2nd floor; modifications of exterior landings and accessible ramp at alley side parking lot with sign at main street entrance directing patrons to the accessible route location; upgrade stairs, handrails & guards per code; safety glass, doors and hardware per code, exit signage and emergency lighting. NOTE: This building will be fully fire sprinklered with alarm in conjunction with this permit. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/4/201110/25/2011 DONE
DetailsChristina Prado
Final value given when c of o issued
Permanent Occupancy  10/25/2011 DONE
DetailsChristina Prado
BLD-Final10/14/201110/17/201110/17/2011PPASS
DetailsDave Hannah
All other inspections have been done. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection10/13/201110/14/201110/14/2011PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference10/5/201110/6/201110/6/2011PNR
DetailsJim Sly
I am ready for the fire/life safety inspection. I have the approved plans and sign-off card onsite by the back set of stairs. Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection10/6/201110/6/201110/6/2011AFAIL
DetailsForrest France
Noted missing exit signs and EM lighting per plan at the 2nd, 1st and basement levels- see A and E sheets on stamped plan set for locations, remove cover at the FACP smoke detector, repair one non-functional light at an EM adjacent to the restrooms, remove non-required signage at 2nd floor door 29, door 8e appears to need hardware group 4, provide approved hardware at the bar door to basement stairs.
FIRE-Final Inspection10/6/201110/6/201110/6/2011AFAIL
DetailsForrest France
See plan annotations.
FIRE-Final Inspection10/5/201110/6/201110/5/2011ACANC
DetailsForrest France
I am ready for the fire/life safety inspection. Phone #: ###-#### >> Inspection requested via web by Scott Asin Inspection cancelled from web by: Scott Asin
BLD-Framing/Rough-in9/7/20119/8/20119/8/2011APASS
DetailsDave Hannah
scott please look at celing and the old bathroom and office area Phone #: ###-####
BLD-Framing/Rough-in9/7/20119/7/20119/7/2011PPART
DetailsDave Hannah
scott please look at celing and the old bathroom and office area Phone #: ###-#### needs to fire block furred out wall and add metal stapes to ceiling
FIRE-Conference8/31/20118/31/20118/31/2011PDONE
DetailsForrest France
Regarding project schedule and related FIR trade permit work.
Telephone call  8/17/2011 DONE
*Email request* Owner is requesting to utilize the new bathrooms located on the 1st floor while existing restrooms are being demolished during the project. Request is under evaluation by Building Official and Fire Code Official.
Meeting  8/17/2011 DONE
In attendance at today’s onsite meeting were PDS/Structural Supervisor - Robert Archibald, PDS/Fire Manager - Scott Arellano, General Contractor - Scott Asin, and Penguillys Saloon Owner. The objective of the meeting was to establish temporary conditions for the allowed use of the new restroom facilities for use by Penguilly patrons while the existing restroom facilities are permanently removed as part of phase 2 of the construction project. The following conditions are required until completion of all related permits:
1. Patrons are only permitted to access the adjacent building area for the sole purpose of utilizing the new restroom facilities. No other collateral use is permitted until all related project permits have been finaled.
2. A clearly defined, contiguous barrier shall be constructed adjacent to the existing interior wall which guides Penguilly patrons from the existing bar area directly to the restroom facilities.
3. This defined pathway shall maintain a minimum 36 inches in clear width and include access to two (2) exits at opposite ends of the space for egress.
4. The approved maximum occupant load of 64 (MIS07-00043) shall not be exceeded until such time all related permits have been finaled.
FIRE-Conference8/15/20118/16/20118/16/2011ADONE
DetailsForrest France
We are getting ready to open the wall between the two halves of the building. I would like to have you take a look around to see if we missed anything. Once the new bathrooms are being used, we will go in and remove the old bathrooms, office and stage. This is kind of a partial final inspection I guess. Thanks. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
BLD-Conference8/15/20118/15/20118/16/2011PPART
DetailsDave Hannah
We are ready to start using the new bathrooms and opening up the temp wall between the two halves of the building. I would like to check with you to see if you are okay with that. Phone #: ###-#### >> Inspection requested via web by Scott Asinok to use back area after other trades ok
BLD-Framing/Rough-in6/20/20116/21/20116/21/2011APASS
DetailsDave Hannah
HVAC, Electrical and Plumbing are all inspected. Phone #: ###-#### >> Inspection requested via web by Scott Asin
Issue PAID IN FULL permit  5/31/2011 DONE
DetailsBarbara Stitt
Permit Ready to Issue  5/27/2011 DONE
DetailsBarbara Stitt
Telephone call  5/27/2011 DONE
DetailsBarbara Stitt
Called Doug And told him that permit id ready, we need ACHD info, need RP and fees due on 5-27-11 @ 10:30am///BAS
Routing - PLANNING5/24/2011 5/26/2011 PASS
DetailsMatthew A Halitsky
Received new Sheet A2.0 showing Main street side stair, landing, railings and planters. New sheet A1.0 to Jason Blias for approval as part of Alternate Request Letter.
Routing - PLAN CHECK5/26/2011 5/26/2011 PASS
DetailsDan Stuart
Dan S.
5/26/11 - Plans approved by Planning for front landing, step & handrails with thre new cement planters as indicated on new sheets. Sheets A1.0 & A2.0 sgow the new planters and the plans are red-lined reducing the stair tread and the handrail extension to 11" instead of 13" as shown per the approved alternate request letter. The letter also covered the approval of a 36" deep landing instead of the 44" landing by the building official and per letter from planning concerning maintaining the historical element of this building.
PLANS/APPL TAKEN TO FRONT DESK  5/26/2011 PASS
As noted on plans and all attached alternate and plan review documents & reviews.
Print Occupancy Form  5/26/2011 DONE
Plan assigned to (DRS)1/24/2011 5/26/2011 PASS
DetailsDan Stuart
Plan resubmittals received  5/24/2011 DONE
DetailsChristina Prado
Received two copies of plans A2.1, A9.0, A1.0 & A2.0. Also Received one extra set of plans A1.0, and A2.0 to go to Jason. Took all plans to Dan for review
Routing - PLAN CHECK5/24/2011 5/24/2011 PEND
DetailsDan Stuart
Two copies of Plan sheet A2.0 inserted into plans.Two copies of Plan sheet A1.0 to Jason Blais as part of the Alternate Request Letter for Jason's approval. Plans routing to Planning for review and approval.
Plan resubmittals received  5/20/2011  
DetailsBarbara Stitt
Received 1 Cover transmital, and a response letter to Dan Stuart dated 5-19-11, 2 copies of sheet A2.1, A9.0, 1 copy of sheet A-1.0, A-2.0. Also received for Jason Blais a cover transmittal, a leltter dated 5-16-11 from Marla Carson, a memorandum, a copy of drh11-00070, copy of sheet A-1.0, A-2.0 and taken to Dan Stuart
Routing - PLAN CHECK4/25/2011 5/5/2011 FAIL
DetailsDan Stuart
Change to front entry, stairs, landing, railings into ACHD right-of-way and remove existing door to add new window creates issues between building code and historic preservation for this existing building. Need to resolve requirements between building code life safety concerns and historic preservation needs. Sarah Schafer, Planning, & Jason Blais, Building Official / plan Review Manager, are working together with advice from legal to resolve. Copy of 5/5/11 plan review requiring resubmittals was e-mailed to Marla Carson with copies to doug Tamura, Sara and Jason.
Plan resubmittals requested  5/5/2011 DONE
Copy of plan review to Marla Carson.
Plan Reviewer's activity  4/25/2011 DONE
Responded to e-mail from Marla Carson. Pengillys plan at plumbing plan review for re-review. Questions concerning code requirements for landins, stairs and rails at doors under discussion with Planning for modifications to historic building.
Routing - PLANNING4/15/2011 4/25/2011 FAIL
DetailsSarah Schafer
Change to front entry, stairs, landing, railings into ACHD right-of-way and remove existing door to add new window. Need to resolve requirements between building code life safety concerns and historic preservation needs. Sarah & Jason working together with advice from legal to resolve.
Routing - PLUMBING4/25/2011 4/25/2011 PASS
DetailsBill VanDegrift
Plans routed back to plumbing for re-review. combining water services from two existing tenant spaces to provide adiquate water to one new tenant space is approved as engineered.
Routing - PLAN CHECK4/15/2011 4/15/2011 PEND
DetailsSarah Schafer
Hand delivered to Cody. Cody said Sarah was working with doug Tamura. Left plans on Sarah's desk. Checked back with Sarah to make sure she would handle assignment.
Routing - FIRE4/11/2011 4/15/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK3/24/2011 4/11/2011 PASS
DetailsDan Stuart
Resubmittals of 4/8/11 inserted into plans. Routing plans back to fire code analyst for review.
Plan resubmittals received  4/8/2011 DONE
DetailsTisha Gallop
received plumbing response and calculations, fire response, plan review response and two copies of plan sheets A2.0, A2.1, M1.0, M2.0; taken to Dan Stuart.
Routing - FIRE3/23/2011 3/24/2011 FAIL
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLANNING3/22/2011 3/23/2011 PASS
DetailsCody Riddle
Modifying front by removing existing door and replacing with partial wall and window and adding required landing, stairs and rails that will extend into ACHD right-of-way.

Fail: Planning approval required. Certificate of appropriateness. CER
Routing - PLAN CHECK3/23/2011 3/23/2011 FAIL
DetailsDan Stuart
Routed to fire code analyst.
Plan resubmittals requested  3/22/2011 DONE
Copy of e-mail to Marla Carson for 2nd plan review and items not correctly addressed in resubmittals of 3/16/11. Also notifying her of need to follow-up with Planning for approval / license to extend front stairs, landing & rails into ACHD right-of-way and modification to front removing door and infilling opening with new window; that items of fire code review and plumbing review need to be addressed..
Routing - PLAN CHECK2/23/2011 3/22/2011 FAIL
DetailsDan Stuart
Resubmittals of 3/16/11 reviewed. Resubmittals were incomplete. Copy of remaining items to be addressed e-mailed to Marla Carson. Resubmittals increased occupant load due to existing booths and bar stools. Submittals to Planning was required for new stair, landing and rail into ACHD right of way, discussed in meeting of 3/11/11 with dough Tamura, Marla, Carl Westfall & Myself. Resubmittals did not appear to provide response to previous fire and plumbing code review.
Plan resubmittals received  3/16/2011  
DetailsBarbara Stitt
Received 1 response letter dated 3-10-11, a revised cert of value, revised structural calcs, 2 copies of revised sheets A0.0, A2.0, A2.1, A9.0, M0.0, M1.0, M2.0, E1.0 and taken to Dan Stuart
Routing - FIRE2/16/20112/16/20112/23/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  2/23/2011 FAIL
Failed Plumbing, Plan Check, Fire
Plan Reviewer's activity  2/22/2011 DONE
E-mail to Marla Carson in response to question concerning rating for exterior wall with openings at property lines refering to to an alternate design method for existing buildings as amended during adoption of 2009 IBC code process for sec. 3401.5.
Route to Impact Fee Review2/16/20112/22/20112/17/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Plan resubmittals requested  2/16/2011 DONE
Copy of plan review for resubmittal corrections e-mailed to Doug Tamura and Marla Carson.
Routing - PLAN CHECK1/31/2011 2/16/2011 FAIL
DetailsDan Stuart
Resubmittals required. E-mailed report to architect. Plan routing to fire code analyst.
Telephone call  2/14/2011 DONE
Called Harold cox, Structural Engineer evaluating the building materials and all loads to determine beam size and support. Engineering calcs indicate two different beam to post connections between the new post carrying the new PSL 5-1/4" x 22" beam at the existing 8" x 12" beam in basement.Harold cox researched his design data and called back saying the Simpson PC86 was the correct connector. I red lined on Sheet A9.01 detail.
Routing - PLUMBING11/26/2011 1/31/2011 FAIL
DetailsBill VanDegrift
provide water pipe calculations. 3" min. vtr
Routing - Erosion and Sediment1/26/2011 1/26/2011 PASS
DetailsSteven Webb
ESC11-00036 plan waiver approved per the attached conditions.
Routing - PUBLIC WORKS1/24/2011 1/26/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing1/25/2011 1/25/2011 PASS
DetailsTerry Records
Routing PW Sewer Rating1/25/2011 1/25/2011 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  1/24/2011 DONE
pk per Carl Westfall for level 3 intake
Recd Pcfee & Taken To Pln CK  1/24/2011 DONE
Pending Assignment by JCB1/24/2011 1/24/2011 DONE
DetailsJason Blais
Plan Reviewer's activity  1/24/2011 DONE
DetailsJason Blais
Sent email to architect to contact ACHD to evaluate if any impact fees are due. Our Permit Counter will need a verification letter to be provided prior to the permit being issued.
Application received 1/24/2011