BLD-Final | 5/25/2011 | 5/26/2011 | 5/26/2011 | P | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 5/24/2011 | 5/25/2011 | 5/25/2011 | A | PART |
Tony Young
|
|
|
Mike Phone #: ###-####,, needs CO2 detectors,, then ok
|
BLD-Energy code compliance | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 4/12/2011 | 4/13/2011 | 4/13/2011 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####
|
Routing - MECHANICAL | 4/11/2011 | | 4/11/2011 | | PASS |
Troy James
|
|
|
resubmittal for manual J
|
BLD-Foundation | 3/2/2011 | 3/2/2011 | 3/3/2011 | P | PART |
Tony Young
|
|
|
|
BLD-Foundation | 2/28/2011 | 3/1/2011 | 3/1/2011 | A | NR |
Tony Young
|
|
|
mike
|
BLD-Footing | 2/24/2011 | 2/25/2011 | 2/25/2011 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/22/2011 | | DONE |
|
|
|
|
OVERRIDE | | | 2/18/2011 | | |
|
|
|
|
Telephone call | | | 2/18/2011 | | DONE |
Tisha Gallop
|
|
|
called Mike/FMCI and told him permit is ready and fees.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 2/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 1/26/2011 | 1/26/2011 | 2/17/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/8/2011 | | 2/17/2011 | | PASS |
Carl D Madsen
|
|
|
Carl Madsen
|
1st review completed | | | 2/17/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/17/2011 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/26/2011 | 1/31/2011 | 2/10/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 2/8/2011 | | 2/8/2011 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/1/2011 | | 2/2/2011 | | PASS |
Troy James
|
|
|
1. Please provide the RUP file.
2. Provide the expanded performance data for the equipment.
3. Show indoor design temperature at 70 for heating.
4. Show house construction quality at average per floor design and per rescheck. Plans are showing sealed conditioned crawl. This needs to be verified.
5. Building Analysis:
Need to show duct load for heating and cooling.
6. Component Construction:
Need to show garage/house wall as partitions.
Show floor area over garage.
Show SHGC and NFRC rated windows to description.
How does C part ceiling, C part ceiling, frm flr, 6” thkns apply at kitchen.
7. Show air changes/hour at .45 heating and .23 cooling.
8. Show the SHR at .85 for this area.
9. CFM design flow through coil is too low.
10. Show BTU load for ducts at Project Summary.
11. Minimum internal gains is 2400.
12. Draw duct drops to main level from attic.
|
Routing - MECHANICAL | 2/1/2011 | | 2/2/2011 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 1/31/2011 | | 2/1/2011 | | PASS |
David Moser
|
|
|
OK as per CUP09-69, CUP06-144 and CUP04-27
|
Routing - Addressing | 1/26/2011 | | 1/31/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | | | 1/31/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 1/26/2011 | 1/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 1/26/2011 | | PASS |
Barbara Stitt
|
|
|
|
Routing - FRONT DESK | 4/11/2011 | | | | |
Barbara Stitt
|
|
|
|