Third Notice | | 5/15/2011 | 5/23/2011 | | DONE |
|
|
|
|
Second Notice | | 5/7/2011 | 5/10/2011 | | DONE |
|
|
|
|
First Notice | | 4/22/2011 | 4/27/2011 | | DONE |
|
|
|
|
BLD-Final | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
Late morning, call 15 prior---Larry Phone #: ###-####
|
FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy UNPAID FEE | | | 4/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide battery backup for the two rear exit signs and provide emergency lighting at both locations as well.
|
BLD-Conference | 3/9/2011 | 3/9/2011 | 3/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
exit discharge light not required on ext
|
Issue PAID IN FULL permit | | | 3/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 2/23/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2011 | | DONE |
|
|
|
2-23-11 called Adam permit ready and fee given Also need GC ///DLD
|
Plan assigned to (TLW) | 1/28/2011 | | 2/23/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/15/2011 | | 2/23/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 2/22/2011 | | |
Barbara Stitt
|
|
|
Received 1 cover transmittal,copy of email from Tim Woodard to Adam Garcia dated 2-22-11, 2 copies of Sheet A1.0 and taken to Tim Woodard
|
Routing - PUBLIC WORKS | 2/14/2011 | | 2/15/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLUMBING | 2/15/2011 | | 2/15/2011 | | PASS |
Bill VanDegrift
|
|
|
see notes 2 and 3 on review from 2/4/11. per plans and 2003 upc
|
Routing PW Environmental | 2/14/2011 | | 2/14/2011 | | PASS |
Walt Baumgartner
|
|
|
|
Plan resubmittals received | | | 2/11/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet P1.0; taken to Tim Woodard.
|
Routing - PLAN CHECK | 2/4/2011 | | 2/10/2011 | | FAIL |
Tim L. Woodard
|
|
|
|
1st review completed | | | 2/10/2011 | | FAIL |
|
|
|
Refer to plan review report. TLW
|
1st review completed | | | 2/10/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 2/4/2011 | | 2/4/2011 | | FAIL |
Bill VanDegrift
|
|
|
verify premise protection. indirect waste piping over 5' must be trapped, over 15' trapped and vented. install grease trap per manufacturers instructions. pass public works review prio to plumbing approval.
|
Routing - PLAN CHECK | 2/1/2011 | | 2/4/2011 | | PEND |
Tim L. Woodard
|
|
|
pending review from plumbing. TLW
|
Plan resubmittals received | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet T1.0; taken to Tim Woodard
|
Routing PW Environmental | 1/31/2011 | | 2/1/2011 | | FAIL |
Walt Baumgartner
|
|
|
FAILED WestBoise Sewer Dist - suitable and adequate grease abatement required. Second sink has no grease device, 40 lb trap shown not sufficient size.
|
Routing - PUBLIC WORKS | 1/28/2011 | | 2/1/2011 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 1/31/2011 | | 1/31/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 1/28/2011 | 1/28/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/28/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/28/2011 | | DONE |
Tisha Gallop
|
|
|
|