Case Summary (BLD) | | | 3/10/2016 | | DONE |
|
|
|
|
First Notice | | 2/18/2011 | 2/11/2011 | | DONE |
|
|
|
no work done per this scope of work so no value to claim.
|
Permanent Occupancy | | | 2/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 2/4/2011 | 2/7/2011 | 2/7/2011 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 2/3/2011 | 2/4/2011 | 2/4/2011 | P | PASS |
Forrest France
|
|
|
Correction items field verified for completion. Fire life safety finaled.
|
FIRE-Final Inspection | 2/3/2011 | 2/3/2011 | 2/3/2011 | P | FAIL |
Forrest France
|
|
|
Need to provide current annual certifications for the existing fire sprinkler and alarm systems, verify offsite monitoring, install approved door hardware at both restrooms.
|
Plan assigned to (CDM) | 1/28/2011 | 1/28/2011 | 2/3/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/28/2011 | | 2/3/2011 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/3/2011 | | DONE |
|
|
|
|
Routing - FIRE | | | 2/3/2011 | | PASS |
|
|
|
Verify in field CDM
|
Case Summary (BLD) | | | 2/3/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2011 | | |
|
|
|
|
Print Occupancy Form | | | 2/3/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/3/2011 | | DONE |
Tisha Gallop
|
|
|
called Shane/Stonehenge Produce that permit is ready, fees and need to sign GC form.
|
Issue PAID IN FULL permit | | | 2/3/2011 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/28/2011 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/28/2011 | | | |
|
|
|
|