Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD11-00164
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 12639 W EXPLORER DR Unit: 100
Project NameMoreton & Company
Customer Number 
ePlanReviewNo
Description
(MORETON & COMPANY - Explorer Pointe Bldg - Suite 100) Permit is to remodel an existing 3,454 square foot office space (Last occupied by RBC Mortgage under BLD04-02514). Approval contingent upon adhering to the approved plans on file. Work to include: demolition of 8 existing office spaces, construction of interior non-bearing walls to create a 1,219 square foot conference room, installation of new accessible doors / hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW** 8-26-11 FINAL CERT OF VALUE PER GC $ 118,120.00 ///dld
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/4/20118/26/2011 DONE
Third Notice 8/31/20118/26/2011 DONE
First Notice 8/12/20118/25/2011 DONE
BLD-Final8/1/20118/2/20118/2/2011APASS
DetailsJim Sly
Jack Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  8/2/2011 DONE
DetailsTisha Gallop
FIRE-Final Inspection8/1/20118/1/20118/1/2011PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection7/8/20117/11/20117/11/2011PFAIL
DetailsTroy Cobbley
Exit signs have not been repaired and the missing exit sign in the conference room has not been provided. Also an AES panel has been installed without a permit. The AES panel needs to be inspected and passed prior to a building life safety final.
FIRE-Final Inspection7/8/20117/8/20117/8/2011PCANC
DetailsTroy Cobbley
jack Phone #: ###-####
BLD-Final7/8/20117/8/20117/8/2011PCANC
DetailsJim Sly
jack Phone #: ###-####
BLD-Framing/Rough-in4/13/20114/14/20114/15/2011APASS
DetailsJim Sly
Matt Phone #: ###-####
Issue PAID IN FULL permit  2/11/2011 DONE
Plan assigned to (TLW)2/3/2011 2/4/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/4/2011 2/4/2011 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/4/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/4/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/4/2011 DONE
Permit Ready to Issue  2/4/2011 DONE
DetailsTisha Gallop
Telephone call  2/4/2011 DONE
DetailsTisha Gallop
called Matt Rhees and told him permit is ready and fees.
Plan assigned to (CDM)1/28/20111/28/20112/3/2011 DEFR
DetailsCarl D Madsen
Deffered review to Tim Woodard.
Routing - PLAN CHECK1/31/2011 2/3/2011 FAIL
DetailsTim L. Woodard
Routing - FIRE  2/3/2011 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  2/3/2011 DONE
DetailsTim L. Woodard
Application received 1/28/20111/31/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  1/28/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/28/2011 DONE
DetailsTisha Gallop