First Notice | 5/6/2011 | 5/6/2011 | 5/10/2011 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 5/5/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Jim Storey
|
|
|
Call 30min prior---shawn Phone #: ###-####
|
DOC - Permit Finaled | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Forrest France
|
|
|
Reinspection passed, correction items completed. Fire life safety finaled.
|
FIRE-Final Inspection | 5/5/2011 | 5/5/2011 | 5/5/2011 | A | PART |
Forrest France
|
|
|
Final pending noted correction items.
|
BLD-Final | 5/2/2011 | 5/3/2011 | 5/3/2011 | A | PASS |
Jim Storey
|
|
|
call 30 min prior//Sean Phone #: ###-####
|
FIRE-Final Inspection | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | FAIL |
Forrest France
|
|
|
Need to repair two exit signs, remove exit signage above equipment access doors as hardware is non-compliant.
|
FIRE-Sprinkler Rough-in | 4/13/2011 | 4/13/2011 | 4/13/2011 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler rough-in approved for ceiling cover.
|
BLD-Framing/Rough-in | 4/7/2011 | 4/8/2011 | 4/8/2011 | A | PASS |
Jim Storey
|
|
|
shawn - please call 1/2 hr prior Phone #: ###-####
|
BLD-Footing | 3/28/2011 | 3/28/2011 | 3/28/2011 | P | PASS |
Jim Storey
|
|
|
SHAUN PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 2/25/2011 | | |
Barbara Stitt
|
|
|
Received 1 cover letter from Don Hutchison dated 2-24-11, 2 copies of sheets G-1, A-2 and taken to Tim Woodard's desk
|
Plan Reviewer's activity | | | 2/25/2011 | | DONE |
Tim L. Woodard
|
|
|
Before issuance I realized that this was a IIB building and cannot have wood. The architect reclassified the building as a IIIB which would allow this to be constructed out of wood. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/25/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/25/2011 | | DONE |
|
|
|
2-25-11 called left message for Earl permit ready and fee given ///dld
|
Plan assigned to (TLW) | 2/3/2011 | | 2/25/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/18/2011 | | 2/18/2011 | | PASS |
Tim L. Woodard
|
|
|
New design complies with ansi and was approved with a redline for maximum lighting allowance and dual level switching. TLW
|
1st review completed | | | 2/18/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 2/16/2011 | | |
Barbara Stitt
|
|
|
Received 2 copies of wall calcs from Call Engineering and 2 copies of sheets G-1, A-1, A-2, A-3, A-4, A-5, S-1 and taken to Tim Woodard's desk
|
Routing - PLAN CHECK | 2/3/2011 | | 2/14/2011 | | FAIL |
Tim L. Woodard
|
|
|
Architect made me aware that the design of this room is to change. I gave him the only correction I had at this time witch was to expand vestibule to meet Ansi code. Will wait for revised prints. TLW
|
1st review completed | | | 2/14/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 2/3/2011 | 2/3/2011 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/3/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/3/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/3/2011 | | PASS |
Tim L. Woodard
|
|
|
|