BLD-Final | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|
DOC - Permit Finaled | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | NR |
Tom Arcoraci
|
|
|
Call 20min prior---Ronald Phone #: ###-#### nneds mech final
|
BLD-Framing/Rough-in | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | PASS |
Jim Sly
|
|
|
Ron Brown-Please call at least 30 mins prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 6/1/2011 | 6/2/2011 | 6/2/2011 | A | CANC |
Jim Sly
|
|
|
Call 20min prior please--Ron Phone #: ###-####Re-sched....
|
BLD-Framing/Rough-in | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | DONE |
Jim Sly
|
|
|
Phone 20 min Ron ###-####--Ron called in and canceled @ 12:24 this inspection should have been in the am and he has plans for this afternoon//BAS
|
BLD-Footing | 2/14/2011 | 2/15/2011 | 2/15/2011 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/7/2011 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/4/2011 | | |
|
|
|
|
Application received | | 2/4/2011 | 2/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | DONE |
Bruce Eggleston
|
|
|
|
Routing Walk-In (BLD) | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 2/4/2011 | 2/4/2011 | 2/4/2011 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 2/4/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 2/4/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2011 | | |
|
|
|
|