BLD-Aging Inspection | 8/16/2013 | 8/16/2013 | 8/21/2013 | | DONE |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/21/2013 | 8/21/2013 | 8/21/2013 | A | PASS |
Dave Hannah
|
|
|
this project was never completeted the tenants moved out and the law firm moved back in
|
BLD-Final | 3/21/2013 | 3/21/2013 | 3/21/2013 | A | PASS |
Dave Hannah
|
|
|
this project is closed they moved out of this building.
|
BLD-Aging Inspection | 3/21/2013 | 3/21/2013 | 3/21/2013 | | PASS |
Dave Hannah
|
|
|
|
Plan Reviewer's activity | | | 10/12/2011 | | DONE |
Jason Blais
|
|
|
A site visit in September 2011 by the Building Inspection Supervisor and Building Division Manager indicated the tenant has vacated the building and is no longer occupying.
|
Issue PAID IN FULL permit | | | 8/8/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2011 | | DONE |
|
|
|
left vm for bryan - permit is going to expire on the 7th of this month
|
Telephone call | | | 7/22/2011 | | DONE |
|
|
|
left message w christine for bryan mogel that this permit is going to expire on the 7th of August and needs to be picked up
|
BLD-Conference | 6/8/2011 | 6/8/2011 | 6/8/2011 | A | PEND |
Dave Hannah
|
|
|
No citation issued. An additional week granted to receive letter from applicant with conformation from ACHD on negotiations.
|
BLD-Other | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | FAIL |
Dave Hannah
|
|
|
Posted correction notice (48 hour) to obtain permit.
|
Print Occupancy Form | | | 4/8/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/8/2011 | | DONE |
Tisha Gallop
|
|
|
called and left vm permit is ready, fees and need ACHD.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 4/7/2011 | | 4/7/2011 | | PASS |
David Moser
|
|
|
need to confirm signage for final
|
Plan assigned to (TLW) | 2/8/2011 | | 4/7/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/11/2011 | | 2/18/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/18/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/15/2011 | | 2/15/2011 | | PASS |
Tim L. Woodard
|
|
|
Called Bryon and informed him we still did not have his ACHD approval.
|
1st review completed | | | 2/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 2/14/2011 | | 2/15/2011 | | PASS |
Bill VanDegrift
|
|
|
(1)the island sink drain downstream of the return vent shall serve no other fixture. (2)verify premise protection. (3) additional cross connection protection may be required. (4) verify water lines above ceiling of the covered patio are protected from freezing.
|
Routing - PLANNING | 2/10/2011 | | 2/11/2011 | | FAIL |
David Moser
|
|
|
David Moser, left message with applicant on 2-11-11. They need to provide bicycle parking and signage in parking lot.
|
Routing - Addressing | 2/10/2011 | | 2/10/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 2/8/2011 | | 2/10/2011 | | PASS |
Beverly Mountain
|
|
|
Inspectors: Please call Public Works at ###-#### if additional plumbing fixtures are installed or not existing. Bev Mountain
|
Application received | | 2/8/2011 | 2/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | 8/21/2013 | 8/21/2013 | | | |
Dave Hannah
|
|
|
|