Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00270
StatusFinaled
Name TRINITY PROPERTY CONSULTANTS
Site Address 5326 W OVERLAND RD
Project NameHILLCREST SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(NAC) Remodel changing occupancy from assembly use to a new Retail use with some storage and a Animal Pharmacy/Clinic in a 22,555 sq.ft. space within an existing shopping center building. Work to include: Demolition work of previous tenant interior walls, fixtures, floor finish, and doors per plans; Construct an interior tenant demising wall (1-houe Fire Barrier) per plans; install a new insulated overhead door in the rear of the building; construct new interior stud frame partition walls to create a storage room, fully accessible mens and womens restrooms, janitor room w/ mop sink; new doors and associated hardware; install an accessible Hi-Lo drinking fountain; construct interior stud frame partition walls to separate the waiting room, exam rooms, office space, treatment room, surgery room, and adoption center room in the Animal Pharmacy/Clinic portion; install accessible compliant counters/cabinetry and plumbing fixtures; installation of suspended ceiling system with related interior finishes in compliance with chapter 8 of the 2009 IBC; installation of point of sale counters; construct a new vestibule; construct stud frame partition walls for dressing rooms; remove select existing roof top units and install (5) new roof top units; patch and repair roof as necessary; lighting, mechanical, and plumbing work. All work per the approved plans, attached plan review report, Engineering, and all adopted codes.NOTE: This building is fully fire sprinklered for an unlimited area building. Any alterations and modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. SPECIAL INCPESTIONS ARE REQUIRED PER THE ENGINEER OF RECORD. CZC11-00013, CUP11-00002 per planning and Zoning **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  8/2/2011 DONE
DetailsTisha Gallop
per Matt Smith/HC Company send bill for final value fees to Owner Trinity Property Consultants, 834 E. 9400 S. Suite 54, Sandy, UT 84094.
First Notice 6/16/20116/27/2011 DONE
BLD-Final6/6/20116/6/20116/6/2011APASS
DetailsTom Arcoraci
Please call 1/2 hour upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
Zoning Approval6/6/20116/6/20116/6/2011 DONE
DetailsSusan Riggs
Permanent Occupancy  6/6/2011 DONE
DetailsTisha Gallop
BLD-Final5/27/20116/1/20116/1/2011PNR
DetailsJim Sly
darrin Phone #: ###-####
NR..... See previous note. Verified that fire life, fire sprinkler, and zoning has signed off for final on the bld-10 shell permit that is required to be signed off prior to th T I final. Public works (the only final left) has a correction for some grading etc which will be re-inspected on Fri. june3 at 2:00 if everything goes as planned.
FIRE-Final Inspection6/1/20116/1/20116/1/2011PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection5/27/20115/31/20115/31/2011APART
DetailsForrest France
Fire life safety inspection passed after two EM lights repaired while on site. Final approval pending project related fire alarm permit final as noted.
Telephone call  5/19/2011 DONE
DetailsSam Zahorka
Agency Sign-offs identified as: Public Works, Planning & Zoning?, Fire Life Safety to obtain Final for BLD10-00109. Spoke with Tom Arcoraci the structural inspector. Building owner needs to complete outstanding shell permits prior to T.I. C of O.
BLD-Other5/12/20115/13/20115/13/2011APASS
DetailsTom Arcoraci
Please call 1/2 hour prior upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
BLD-Conference5/9/20115/9/20115/9/2011PPASS
DetailsTom Arcoraci
Please call 1/2 hour upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
BLD-Other5/5/20115/6/20115/6/2011APASS
DetailsTom Arcoraci
darren - ceiling grid Phone #: ###-#### ok in outside area
BLD-Framing/Rough-in4/21/20114/22/20114/22/2011APASS
DetailsTom Arcoraci
Darren Phone #: ###-#### wip ok
BLD-Energy code compliance4/14/20114/15/20114/15/2011PPART
DetailsTom Arcoraci
Please call 1/2 hour upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
BLD-Framing/Rough-in4/13/20114/13/20114/13/2011PPART
DetailsTom Arcoraci
darrin Phone #: ###-#### ext wall parts of others ok
Issue PAID IN FULL permit  4/13/2011 DONE
DetailsChristina Prado
Plan assigned to (SRZ)2/23/20112/23/20114/12/2011 PASS
DetailsSam Zahorka
Routing - PLAN CHECK4/4/2011 4/12/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/12/2011 DONE
DetailsSam Zahorka
Case Summary (BLD)  4/12/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  4/12/2011 DONE
Permit Ready to Issue  4/12/2011 DONE
Telephone call  4/12/2011 DONE
4-12-11 called Joe permit ready and fee given ///dld
Plan resubmittals received  4/7/2011 DONE
DetailsTisha Gallop
received transmittal and two copies of plan sheets G1.1, A1.1, A3.1, M1.0; taken to Sam Zahorka.
Route to Impact Fee Review4/1/20114/6/20114/4/2011 PASS
DetailsCindy M. Gould
Change of use to a Mercantile Retail Business. No impact fees
Routing - FIRE4/1/20114/1/20114/4/2011 PASS
DetailsScott Arellano
Please, see attached review.
1st review completed  4/4/2011 DONE
Failed - ESC
Case Summary (BLD)  4/1/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK3/29/2011 4/1/2011 FAIL
DetailsSam Zahorka
Routed to Fire. Corrections have been requested.
Routing - Erosion and Sediment3/29/2011 3/29/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC Plan Review Conditions. ESC11-00089
Routing - PLANNING3/28/2011 3/28/2011 PASS
DetailsSusan Riggs
Routing - PLAN CHECK3/9/2011 3/28/2011 PEND
DetailsSam Zahorka
Plan resubmittals received  3/24/2011  
DetailsBarbara Stitt
Received 1 cover transmittal, 2 copies of structural calcs, 2 copies sheets S5.2, S1.2, A3.1, A1.1, G1.1, E-3, E-2, E-1, E-0, P-1.0, M-3.0, M-2.0, M-1.0 inserted into plans by architects office and returned to Sam Zahorka's desk.
1st review completed  3/9/2011 DONE
DetailsSam Zahorka
Plan review will recommence once resubmittals are received. 1st review has been completed and the architect Mr. Joe Thompson has been notified. SRZ
Routing - PLAN CHECK3/1/2011 3/9/2011 FAIL
DetailsSam Zahorka
Plan review pending updated construction documents per the design professional. Plan review will recommence once resubmittals are received. 1st review has been completed and the architect Mr. Joe Thompson has been notified. SRZ
Routing - FIRE  3/9/2011 FAIL
DetailsScott Arellano
Failed building plan review due to significant changes to construction documents per the registered design professional. Plan review will recommence once resubmittals are received. 1st review has been completed and the architect Mr. Joe Thompson has been notified. SRZ
Telephone call  3/1/2011 DONE
DetailsSam Zahorka
The architect Joe Thomson called me and requested a time frame status. I explained his plans are still routing through the departments and I have not yet recieved them. He stated the owners have added some mechanical changes and some structural issues have been identified after the initial submittals. I requested plan modifications for these items. I let him know I would contact him ounce his plans are routed to me to discuss further.
Routing - Design Review3/1/2011 3/1/2011 PASS
DetailsAndrea Tuning
The applicant obtained a Zoniing Certificate (CZC11-00013) to install an overhead door in the rear elevation.
Routing - Erosion and Sediment2/25/2011 3/1/2011 FAIL
DetailsSteven Webb
Documents did not include an ESC plan or plan waiver which is required by BMC 8-17. Re-submittal is required.
Routing - PLANNING3/1/2011 3/1/2011 FAIL
DetailsScott Spjute
Susan Riggs - CUP11-00002 P&Z hearing on March 7th plus 10 day appeal period
Routing PW Sewer Rating2/25/2011 2/25/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS2/23/2011 2/25/2011 PASS
DetailsConnie Baumgartner
Plan resubmittals received  2/24/2011  
received 2 copies of sheets G1.1,A1.1,A2.1,A8.1 inserted and sent to Sam Z
Routing - Addressing2/24/2011 2/24/2011 PASS
DetailsTerry Records
Changed Address from 5100 as submitted to 5326.
Application received 2/10/20112/23/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  2/23/2011 DONE
DetailsBarbara Stitt
Intake Approval  2/23/2011 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  2/23/2011 DONE
DetailsBarbara Stitt
Pending Assignment by JCB2/23/2011 2/23/2011 DONE
DetailsJason Blais
Plan Reviewer's activity  2/23/2011 DONE
DetailsJason Blais
Contacted architect represtentative Joe Thompson to have him contact ACHD to verify if any additional impact fees are due. Verification from ACHD will need to be provided to our Permit Counter prior to permit issuance.