Permit Information
Permit NumberBLD11-00276
StatusFinaled
Name DAWN TOTH
Site Address 7950 W KING ST
Project NameAspen Mental Health LLC
Customer Number 
ePlanReviewNo
Description
**(ASPEN MENTAL HEALTH)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for an existing 4,028 square foot office building. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. This building was originally occupied by “Perfect Match I” under BLD96-02850. There are no changes to occupancy or use under this permit. TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice1/30/20121/30/20129/25/2012 DONE
DetailsJim Sly
BLD-Conference1/13/20121/30/20121/30/2012APASS
DetailsJim Sly
Talked to Tim Woodard...Permit issued.
DOC - Permit Finaled1/30/20121/30/20121/30/2012PPASS
DetailsJim Sly
BLD-Conference1/13/20121/13/20121/13/2012ADONE
DetailsJim Sly
Taked to Patrick. Working with Oscar (architect) from LRK and Tim woodard. Has turned in plan.
BLD-Conference1/3/20121/12/20121/13/2012ACANC
DetailsJim Sly
Patrick phone
BLD-Conference12/27/20111/3/20121/3/2012ANH
DetailsJim Sly
Patrick phone Re-sched........
BLD-Conference12/16/201112/22/201112/27/2011ACANC
DetailsJim Sly
Patrick phone
BLD-Conference12/16/201112/22/201112/27/2011ACANC
DetailsJim Sly
Patrick phone
BLD-Conference12/11/201112/16/201112/16/2011ADONE
DetailsJim Sly
Patrick phone
Talked to Patrick.....Should be turning in paperwork by Dec 22.
BLD-Conference12/5/201112/9/201112/11/2011PDONE
DetailsJim Sly
Patrick phone
Went to office.....Patrick not there. Called him....left V/M No return call.
BLD-Conference12/2/201112/5/201112/5/2011ANH
DetailsJim Sly
Patrick Check back.....
BLD-Conference11/25/201112/2/201112/2/2011PNH
DetailsJim Sly
No one in office.
BLD-Conference11/30/201112/2/201112/2/2011ANH
DetailsJim Sly
NH
BLD-Conference11/25/201111/30/201111/30/2011ACANC
DetailsMike Jordan
Patrick phone.
BLD-Conference11/23/201111/25/201111/25/2011PNH
DetailsJim Sly
Patrick phone ###-####
No one at office....no return phone call.
BLD-Conference11/9/201111/24/201111/23/2011PCANC
DetailsJim Sly
Patrick phone
BLD-Conference11/7/201111/9/201111/9/2011PPEND
DetailsJim Sly
Patrick phone.............Patrick called and said Architect was meeting him today to draw out floor plan to submit to the city.
BLD-Conference11/2/201111/4/201111/7/2011PPEND
DetailsJim Sly
Patrick phone..........Stopped at jobsite....Patrick not avaliable....had secretary leave a note for Patrick...to call me.
BLD-Conference10/31/201111/2/201111/2/2011ACANC
DetailsJim Sly
Patrick phone.....
BLD-Conference10/30/201111/1/201110/31/2011ACANC
DetailsJim Sly
Patrick phone....Re-sched for Wed.
BLD-Conference10/25/201110/31/201110/30/2011ACANC
DetailsJim Sly
Patrick phone Re-sched for Tues ....
BLD-Conference10/11/201110/25/201110/25/2011PCANC
DetailsJim Sly
Patrick phone Re-sched.....
BLD-Conference10/5/201110/11/201110/11/2011PPEND
DetailsJim Sly
Patrick WIP
BLD-Conference10/3/201110/5/201110/5/2011PPEND
DetailsJim Sly
Patrick or Dawn see prev for #s
Talked with Patrick Architects are working on plan for submittal.
BLD-Conference9/8/201110/3/201110/3/2011PPEND
DetailsJim Sly
Check back ....status?
Left Corr notice ....call back with status of previous corrections.
BLD-Final9/8/20119/9/20119/9/2011ACANC
DetailsJim Sly
Patirick Phone #: ###-####
BLD-Conference8/29/20119/8/20119/8/2011PNR
DetailsJim Sly
Talked to Patrick.....Need to re-submit floor plan for approval. Need fire final OK Patrick has met with Tim Woodard.
FIRE-Final Inspection9/8/20119/8/20119/8/2011PFAIL
DetailsTroy Cobbley
All items have been corrected except for the revised floor plan.
BLD-Conference8/26/20118/29/20118/29/2011ADONE
DetailsJim Sly
Please check on this-do we need to expire?
Went to Aspen Mental Health and left a correction notice. 1. Need Fire and Structural finals. 2. Complete pending corrections for Fire and 3. obtain Certificate of Occupancy. Above Items to be completed by 9/8/11. Employees gave me a card of Patrick Kirk (supervisor)......and said he would be taking care of this. O cdbbiej C ehehgcc
BLD-Final2/23/20112/25/20112/25/2011ANR
DetailsJim Sly
late morning so fire life/safety pass---patrick Phone #: ###-####
Need Fire Final.
FIRE-Final Inspection2/23/20112/25/20112/25/2011AFAIL
DetailsTroy Cobbley
Repair all exit signs and emergency lights, remove the dead bolt from the east exterior exit door and resubmit plans with a corrected floor layout.
Issue PAID IN FULL permit  2/23/2011 DONE
DetailsChristina Prado
Print Occupancy Form  2/22/2011 DONE
Telephone call  2/22/2011 DONE
left vm for dawn - permit ready
Permit Ready to Issue  2/22/2011 DONE
Details
Plan assigned to (TLW)2/14/2011 2/18/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/14/2011 2/18/2011 PASS
DetailsTim L. Woodard
1st review completed  2/18/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/18/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/18/2011 DONE
DetailsTim L. Woodard
Application received 2/14/20112/14/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/14/2011 DONE
DetailsTisha Gallop