Second Notice | | 5/26/2012 | 5/30/2012 | | DONE |
|
|
|
|
First Notice | 4/4/2012 | 4/4/2012 | 5/16/2012 | | DONE |
Tom Arcoraci
|
|
|
faxed 5-16-12
|
BLD-Final | 4/4/2012 | 4/4/2012 | 4/4/2012 | P | PASS |
Tom Arcoraci
|
|
|
Katie Phone #: ###-####///John is onsite contact
|
DOC - Permit Finaled | 4/4/2012 | 4/4/2012 | 4/4/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 4/2/2012 | 4/3/2012 | 4/3/2012 | P | PASS |
Forrest France
|
|
|
Racking permit finaled.
|
FIRE-Final Inspection | 2/8/2012 | 2/14/2012 | 2/14/2012 | A | PASS |
Forrest France
|
|
|
Rack permit inspection passed.
|
FIRE-Conference | 2/13/2012 | 2/13/2012 | 2/13/2012 | A | DONE |
Forrest France
|
|
|
|
BLD-Other | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | PART |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 2/28/2011 | | 3/24/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/24/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2011 | | DONE |
|
|
|
|
Routing - FIRE | 3/2/2011 | | 3/7/2011 | | PASS |
Tim Frost
|
|
|
There is no reviewed attached.
Hazardous Material Inventory Statement indicated quantities below MAQ.
Storage is below 12' (Storage is 10' per plans)
This is the same occupancy as previous tenant and there are no changes to the perimeter of the building.
|
1st review completed | | | 3/7/2011 | | DONE |
Tim L. Woodard
|
|
|
First review was completed on 3-7-11 when fire review was passed by TRF. TLW
|
Routing - PLAN CHECK | 2/28/2011 | | 3/2/2011 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
Intake Approval | | | 2/28/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 2/15/2011 | 2/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 2/15/2011 | | FAIL |
Tim L. Woodard
|
|
|
Racking permit approved, however, cannot route until all fees and signatures for the TI permit are collected. TLW
|