Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-00293
StatusFinaled
Name HAEMKER CONSTRUCTION INC
Site Address 3701 E LAKE FOREST DR
Project NameTRAIL WIND ELEMENTARY
Customer Number 
ePlanReviewNo
Description
TRAIL WIND ELEMENTARY-The drainage area of 1060 square feet-collection, routing and treatment of storm water. Impervious areas slope to drain inlet and is piped to underground seepage bed.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/15/201312/2/2013 DONE
Second Notice 9/8/201310/10/2013 DONE
Faxed 10-1-13
First Notice8/7/20138/7/20138/29/2013 DONE
DetailsJim Storey
BLD-Aging Inspection8/6/20138/6/20138/7/2013 DONE
DetailsJim Storey
DOC - Permit Finaled8/7/20138/7/20138/7/2013PPASS
DetailsJim Storey
BLD-Final8/7/20138/7/20138/7/2013APASS
DetailsJim Storey
PubWorks Occupancy Approval4/18/20134/18/20134/18/2013 DONE
DetailsTiffany Lowery
BLD-Aging Inspection3/20/20133/21/20133/21/2013AFAIL
DetailsJim Storey
need pw insp. sign off/ contacted jason designer of record said he would follow up with completion of job.
Inspection Record Card- Bld  3/16/2011 DONE
DetailsTisha Gallop
Telephone call  3/16/2011 DONE
DetailsTisha Gallop
spoke to Lloyd and told him permit is ready, but fees have changed from last phone call to James Haemaeker to include remainder of bld permit fee due, need GC and form, need to sign application.
Issue PAID IN FULL permit  3/16/2011 DONE
DetailsTisha Gallop
Routing - Erosion and Sediment3/14/2011 3/15/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC Permit Conditions.
Routing - FRONT DESK3/15/2011 3/15/2011 PASS
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  3/15/2011 DONE
DetailsBarbara Stitt
Permit Ready to Issue  3/15/2011 DONE
DetailsBarbara Stitt
Telephone call  3/15/2011 DONE
DetailsBarbara Stitt
Called and left a message for James Haemker that permit is ready and fees due on 3-15-11 @ 9:00am
Plan assigned to (B_S) Barb2/16/2011 3/15/2011 DONE
DetailsBarbara Stitt
Routing - FRONT DESK2/23/2011 3/14/2011 FAIL
DetailsBarbara Stitt
routed to ESC
Plan resubmittals received  3/14/2011 DONE
DetailsTisha Gallop
recevied ESC application and waiver request letter; put with rest of plans and routed to ESC.
Meeting  3/11/2011 DONE
DetailsTisha Gallop
Someone came in to see if permit was ready. Told him still need ESC app and plans/narrative or waiver request. Application for ESC was given to him.
Routing - Erosion and Sediment2/22/2011 2/23/2011 FAIL
DetailsSteven Webb
Failed due to the requirement of an erosion and sediment control application that is required with a plan and narrative or they can apply with the application and a plan waiver letter.
Routing - PUBLIC WORKS2/16/2011 2/22/2011 PASS
DetailsBeverly Mountain
Routing PW Drainage2/17/2011 2/22/2011 PASS
DetailsBrian Murphy
Routing - Addressing2/17/2011 2/17/2011 PASS
DetailsTerry Records
Routing PW Sewer Rating2/17/2011 2/17/2011 PASS
DetailsBeverly Mountain
Application received 2/15/20112/15/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  2/15/2011 DONE
DetailsBarbara Stitt
Intake Approval  2/15/2011 PASS
DetailsBrian Murphy