Case Summary (BLD) | | | 11/6/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/6/2015 | | DONE |
|
|
|
|
First Notice | | 5/1/2011 | 5/10/2011 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 4/21/2011 | | DONE |
|
|
|
|
BLD-Final | 4/19/2011 | 4/20/2011 | 4/20/2011 | P | PASS |
Dave Hannah
|
|
|
Marva Phone #: ###-####
|
FIRE-Final Inspection | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | PASS |
Forrest France
|
|
|
Correction items finished. Fire life safety finaled.
|
FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | FAIL |
Forrest France
|
|
|
Need to post fire extinguisher at the breakroom per plan, noted overspaced fire sprinkler coverage at one area due to new wall.
|
BLD-Framing/Rough-in | 3/8/2011 | 3/8/2011 | 3/8/2011 | P | PASS |
Dave Hannah
|
|
|
marva Phone #: ###-#### or ###-####
|
Issue PAID IN FULL permit | | | 2/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (425) | 2/17/2011 | 2/17/2011 | 2/17/2011 | | PASS |
Dave Hannah
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/17/2011 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/17/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 2/17/2011 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2011 | | |
|
|
|
|
Print Occupancy Form | | | 2/17/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/17/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/17/2011 | | DONE |
|
|
|
2-17-11 called Marva permit ready and fee given ///dld
|
Application received | | 2/16/2011 | 2/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 2/16/2011 | | PASS |
Dave Hannah
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 2/17/2011 | | | | PASS |
Dave Hannah
|
|
|
|