Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00340
StatusFinaled
Name GARY EAU CLAIRE
Site Address 11505 W FAIRVIEW AVE
Project NameCANYON RIDGE CHURCH
Customer Number 
ePlanReviewNo
Description
(CANYON RIDGE CHURCH) Fire sprinklers used for area and story increase. To convert part of an existing building (3,863 square foot 1st story and 1,624 square foot 2nd story) from retail sales and office to church assembly rooms (5,487 square feet total). This building has a 16,000 square foot 1st story and a 4,428 square foot 2nd story. The work is to include 2 restrooms accessible to the disabled, a new stairway to serve the 2nd story, interior nonbearing walls, emergency lighting, exit signs, panic hardware, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/14/201111/7/2011 DONE
mailed to Pacific Siding & Windows/Gary Eau Claire
Case Summary (BLD)  10/12/2011 DONE
Third Notice 9/14/20119/29/2011 DONE
faxed and mailed to Gary Eau Claire; mailed to applicant Dennis Thomas
Third Notice 8/21/20118/30/2011 DONE
faxed to Gary Eau Claire
Second Notice 8/4/20118/16/2011 DONE
First Notice 7/1/20117/25/2011 DONE
BLD-Final6/21/20116/21/20116/21/2011PPASS
DetailsMike Jordan
dennis - late afternoon please Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection6/20/20116/21/20116/21/2011APASS
DetailsForrest France
Fire life safety final inspection passed.
BLD-Final6/20/20116/20/20116/21/2011PNR
DetailsMike Jordan
Dennis Phone #: ###-####. Fire/life/safety finals failed.
Permanent Occupancy UNPAID FEE  6/21/2011 DONE
DetailsBarbara Stitt
FIRE-Final Inspection6/20/20116/20/20116/20/2011PFAIL
DetailsForrest France
Noted items include; post max. occupant load signs at the main and mezzanine levels, revise hardware at door #104, project related fire alarm and sprinkler permit finals pending.
BLD-Final6/17/20116/17/20116/17/2011PNR
DetailsMike Jordan
dennis Phone #: ###-####. Needs fire/life/safety finals.
Zoning Approval6/16/20116/16/20116/16/2011 DONE
DetailsCody Riddle
Zoning inspection not required. CER 6/16/11
BLD-Conference6/13/20116/14/20116/14/2011ADONE
DetailsMike Jordan
DENNIS Phone #: ###-####
Plan Reviewer's activity  5/18/2011 DONE
Looked at revised electrical drawings. Existing lighting and switching within the Worship Area will not be altered.
BLD-Framing/Rough-in4/26/20114/27/20114/27/2011APASS
DetailsMike Jordan
David Phone #: ###-####. Interior wood framed walls and ne w stairs ok.
BLD-Conference4/19/20114/19/20114/19/2011PDONE
DetailsMike Jordan
david Phone #: ###-####
Routing - PLANNING4/6/2011 4/7/2011 PASS
DetailsCody Riddle
As noted in the conditions of approval, a cross access and shared parking agreement will be required prior to issuance of final occupancy.
Routing - PLAN CHECK4/7/2011 4/7/2011 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  4/7/2011 DONE
Print Occupancy Form  4/7/2011 DONE
Permit Ready to Issue  4/7/2011 DONE
DetailsChristina Prado
Telephone call  4/7/2011 DONE
DetailsChristina Prado
Called Randy to advise fees due. Also the requirement of GC information before permit issued
Issue PAID IN FULL permit  4/7/2011 DONE
DetailsChristina Prado
Plan assigned to (CJW)3/4/2011 4/7/2011 PASS
DetailsCarl Westfall
Routing - PLAN CHECK3/24/2011 4/6/2011 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Plan resubmittals received  4/4/2011 DONE
DetailsTisha Gallop
received response and two coipes of plan sheet A-2.0; taken to Carl Westfall.
Plan resubmittals received  3/29/2011 DONE
DetailsTisha Gallop
received engineering response and two copies of plan sheets M-2.0, M-2.1, E-2.0, E-2.1 (one copy of original plans included); put on Carl Westfall's desk.
Routing - PUBLIC WORKS3/24/2011 3/24/2011 PASS
DetailsBeverly Mountain
service sink and drinking fountains added.
Routing - PLAN CHECK3/15/2011 3/24/2011 FAIL
DetailsCarl Westfall
Completed the IBC resubmittal review. Some items not resolved.
Plan resubmittals received  3/16/2011 DONE
DetailsChristina Prado
Received one response letter; two copies of plans G-0.0, A-1.0, A-1.1, A-2.0, A-2.1, A-2.2 AND A-3.0; Routed to Carl Westfall for review.
Routing - FIRE3/11/20113/11/20113/15/2011 PASS
DetailsScott Arellano
Please, see attached review for comments and conditions.
1st review completed  3/15/2011 FAIL
Fail - Planning, Plan Check
Route to Impact Fee Review3/11/20113/16/20113/14/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK3/4/2011 3/11/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 8, 2011 and finished on March 11, 2011. Revised drawings were required. See the plan review report.
Routing - Addressing3/4/2011 3/4/2011 PASS
DetailsTerry Records
Routing PW Sewer Rating3/4/2011 3/4/2011 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB3/3/2011 3/4/2011 DONE
DetailsJason Blais
Routing - PUBLIC WORKS3/4/2011 3/4/2011 PASS
DetailsConnie Baumgartner
Routing - PLANNING3/4/2011 3/4/2011 FAIL
DetailsCody Riddle
Cody Riddle; An administrative review application will be required for the joint parking arrangement. Contacted architect at 3:15 p.m. today. CER
Application received 2/23/20113/3/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  3/3/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/3/2011 DONE
DetailsTisha Gallop
Intake Approval  3/3/2011 PASS
DetailsCarl D Madsen
Intake Approval  2/23/2011 FAIL