BLD-Final | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Mike Jordan
|
|
|
Rusten Phone #: ###-####
|
DOC - Permit Finaled | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was issued.
|
BLD-Energy code compliance | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/23/2011 | 5/24/2011 | 5/24/2011 | A | FAIL |
Mike Jordan
|
|
|
Still needs to encapsulate insulation at vaulted ceiling area.
|
BLD-Energy code compliance | 5/23/2011 | 5/23/2011 | 5/23/2011 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | FAIL |
Mike Jordan
|
|
|
rustin Phone #: ###-####. Needs to encapsulate insulation at vaulted ceiling and at truss.
|
BLD-Framing/Rough-in | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | PASS |
Mike Jordan
|
|
|
rustin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2011 | 5/20/2011 | 5/20/2011 | P | CANC |
Jim Storey
|
|
|
Rustin Phone #: ###-#### R703.6.3 Water-resistive barriers. Water-resistive barriers shall be installed as required in Section R703.2 and, where applied over wood-based sheathing, shall include a water-resistive vapor-permeable barrier with a performance at least equivalent to two layers of Grade D paper. framer to verify if as framed at tall wall can be justified or if 8" oc stud spaciing per engineering to be corected.// load transpher of beams to ft north side of great rm west end.//nail top chord and webs of second floor girder truss t36/ fur out wing wall at furnce to 2x6 for r-19 insulation.
|
BLD-Foundation | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PASS |
Mike Jordan
|
|
|
jay Phone #: ###-####
|
BLD-Footing | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | PASS |
Mike Jordan
|
|
|
jay Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/31/2011 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 3/30/2011 | | |
|
|
|
|
Telephone call | | | 3/30/2011 | | DONE |
|
|
|
t/c w debbie - permit ready and fees given - also need rp
|
Permit Ready to Issue | | | 3/30/2011 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/8/2011 | 3/8/2011 | 3/29/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/29/2011 | | 3/29/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 3/29/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/28/2011 | | DONE |
Tisha Gallop
|
|
|
received two coipes of foundation/main floor framing and main floor plan with Porta Frame Detail and Corner Framing Details; put with plans and taken to Carl Madsen.
|
Plan resubmittals received | | | 3/23/2011 | | DONE |
Tisha Gallop
|
|
|
received two copes of tall wall engineering; taken to Carl Madsen
|
Routing - PLAN CHECK | 3/16/2011 | | 3/17/2011 | | FAIL |
Carl D Madsen
|
|
|
Carl Madsen
|
1st review completed | | | 3/17/2011 | | FAIL |
|
|
|
Tall wall engineering required and portal frame detail required. Sent E-Mail to Stetson homes 3-17-11 CDM
|
Routing - MECHANICAL | 3/11/2011 | | 3/16/2011 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/8/2011 | 3/11/2011 | 3/9/2011 | | PASS |
Cindy M. Gould
|
|
|
Credit given to fees paid on PRK06-00527
|
Routing - Addressing | 3/8/2011 | | 3/8/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | | | 3/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 3/8/2011 | | 3/8/2011 | | PASS |
Colleen T Carroll
|
|
|
|
Intake Approval | | | 3/8/2011 | | PASS |
Barbara Stitt
|
|
|
Received 2 copies of stair details 3-7-11//BAS
|
Plans ACCEPTED BY PLAN TECH | | | 3/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 2/24/2011 | | FAIL |
Christina Prado
|
|
|
Needs stair section. Will E-mail 2-24-11
|
Application received | | 2/23/2011 | 2/23/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 3/8/2011 | | | | FAIL |
|
|
|
emailed correction notice
|