Permit Information
Permit NumberBLD11-00362
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 105 E FRONT ST
Project NameHANNAH NAILS AND SPA
Customer Number 
ePlanReviewNo
Description
(HANNAH NAILS AND SPA – Winco Plaza) Permit is to convert an 838 square foot mercantile space (last occupied by “Cricket” / MIS05-00190) into nail salon and spa. This building is fully fire sprinklered. Approval contingent upon adhering to the approved plans on file. Work to include: installation of new nail stations, installation of new mechanical exhaust, installation of new plumbing, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/4/20117/27/2011 DONE
This permit finaled on the web by Ken Litzinger
First Notice 7/2/20117/25/2011 DONE
Permanent Occupancy  6/22/2011 DONE
DetailsChristina Prado
BLD-Final6/20/20116/20/20116/20/2011PPASS
DetailsDave Hannah
Hang Phone #: ###-####
BLD-Final5/13/20115/13/20115/14/2011PPART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger OK FOR TEMP OCC ok for perm after plumbing oks for prem occ
MISC ACTIONS  5/13/2011 DONE
DetailsTisha Gallop
When customer came into get occupancy certificate he notified us of name change of business from "Pampered Nails & Spa" to "Hannah Nails & Spa".
Temporary Occupancy UNPAID FEE  5/13/2011 DONE
DetailsTisha Gallop
FIRE-Final Inspection5/5/20115/5/20115/5/2011APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection5/3/20115/4/20115/4/2011APASS
DetailsForrest France
Fire life safety inspection completed acceptable.
BLD-Final5/3/20115/4/20115/4/2011PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
Issue PAID IN FULL permit  4/18/2011 DONE
DetailsChristina Prado
Print Occupancy Form  4/5/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  4/5/2011 DONE
DetailsChristina Prado
Telephone call  4/5/2011 DONE
DetailsTisha Gallop
called Ken Litzinger and left vm permit is ready and fees.
Routing - MECHANICAL4/1/2011 4/4/2011 PASS
DetailsTroy James
Routing - PLAN CHECK4/4/2011 4/4/2011 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/4/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/4/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/4/2011 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)2/25/2011 4/4/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/14/2011 4/1/2011 PEND
DetailsTim L. Woodard
Awaiting Mech. Review
Routing - MECHANICAL4/1/2011 4/1/2011 FAIL
DetailsTroy James
Owner came in to office. Explained to him the changes needed. He will take information to architect and resubmit.
Plan resubmittals received  3/31/2011  
DetailsTim L. Woodard
Received 2 copies of sheet A1 and damper detail and given to Tim Woodard
Routing - MECHANICAL3/14/2011 3/16/2011 FAIL
DetailsTroy James
Routing - PLUMBING3/11/2011 3/14/2011 PASS
DetailsBill VanDegrift
new floor sink to be installed per 2003 upc. pedicure chairs must have a check valve on the drain or piped indepentently to floor sink. approval of this plan with out engineer stamp is for this project only.
Plan resubmittals received  3/11/2011 DONE
DetailsTisha Gallop
received two copies of plan sheet A1 (mechanical eng); taken to Tim Woodard.
Routing - MECHANICAL  3/3/2011 FAIL
DetailsTim L. Woodard
Need Mechanically engineered plans. Checked with Troy James he indicated over 2 stations would have to be done by an engineer. TLW
Routing - PLUMBING3/3/2011 3/3/2011 FAIL
DetailsTim L. Woodard
Need mechanically engineered plans. Spoke with Lee Rice all hair salons need mechanical engineering. TLW
Plan Reviewer's activity  3/3/2011 DONE
DetailsTim L. Woodard
Contacted architect and contractor and informed them of the need for engineered plans. TLW
1st review completed  3/3/2011 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK3/1/2011 3/3/2011 FAIL
DetailsTim L. Woodard
Need engineered plans. Tim Woodard
Routing - PUBLIC WORKS2/25/2011 3/1/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating3/1/2011 3/1/2011 PASS
DetailsConnie Baumgartner
Application received 2/25/20112/25/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  2/25/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  2/25/2011 DONE
DetailsBarbara Stitt
Intake Approval  2/25/2011 PASS
DetailsTim L. Woodard
Routing - Addressing2/25/2011 2/25/2011 PASS
DetailsTerry Records