Second Notice | | 6/5/2011 | 6/5/2011 | | DONE |
|
|
|
This permit finaled on the web by Daniel Mace
|
First Notice | | 5/12/2011 | 5/26/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/2/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/28/2011 | 4/29/2011 | 4/29/2011 | A | PASS |
Mike Jordan
|
|
|
Daniel Mace ###-####. ok for perm occ once electrical and plumbing sign perm.
|
FIRE-Final Inspection | 4/27/2011 | 4/27/2011 | 4/27/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Ken Roule will be certifying the fire extinguishers this afternoon
|
FIRE-Conference | 4/14/2011 | 4/14/2011 | 4/14/2011 | P | DONE |
Troy Cobbley
|
|
|
Daniel and I wnet over life safety requirements. Per Carl the security gate near the main lobby can remain if the exit sign over the main exit is relocated to the door behind the reception desk. With this relocated exit sign and the other one leading to the second door, two exits from the waiting area are provided.
|
BLD-Framing/Rough-in | 4/7/2011 | 4/8/2011 | 4/8/2011 | A | PASS |
Mike Jordan
|
|
|
daniel - ceiling grid inspection Phone #: ###-####
|
BLD-Energy code compliance | 3/21/2011 | 3/22/2011 | 3/22/2011 | A | PASS |
Mike Jordan
|
|
|
Daniel Phone #: ###-####. R-19 replacement in existing exterior walls.
|
BLD-Framing/Rough-in | 3/17/2011 | 3/18/2011 | 3/18/2011 | A | PASS |
Mike Jordan
|
|
|
daniel Phone #: ###-####Interior steel stud framed walls and hardlids, and additional framed windows in exterior walls.
|
BLD-Conference | 3/10/2011 | 3/10/2011 | 3/10/2011 | A | DONE |
Mike Jordan
|
|
|
|
OVERRIDE | | | 3/4/2011 | | |
|
|
|
|
Plan assigned to (CDM) | 2/25/2011 | 2/25/2011 | 3/4/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/28/2011 | | 3/4/2011 | | PASS |
Carl D Madsen
|
|
|
Carl Madsen
|
Telephone call | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
called Daniel Mace and told him permit is ready and need RP.
|
Issue PAID IN FULL permit | | | 3/4/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | | | 3/4/2011 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 3/4/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/4/2011 | | DONE |
|
|
|
|
Routing - PLANNING | 3/4/2011 | | 3/4/2011 | | PASS |
Carl D Madsen
|
|
|
Signed off per checklist CDM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2011 | | |
|
|
|
|
Print Occupancy Form | | | 3/4/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 2/25/2011 | | 2/28/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/28/2011 | | 2/28/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Environmental | 2/28/2011 | | 2/28/2011 | | PASS |
Walt Baumgartner
|
|
|
Pretreatment of silver bearing wastewater required call 382 3991 for more information,
|
Routing PW Sewer Rating | 2/28/2011 | | 2/28/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 2/25/2011 | 2/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 2/25/2011 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2011 | | DONE |
Barbara Stitt
|
|
|
|