First Notice | 12/6/2011 | 12/6/2011 | 12/20/2011 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 12/2/2011 | 12/6/2011 | 12/6/2011 | A | PASS |
Mike Jordan
|
|
|
jerry Phone #: ###-####
|
DOC - Permit Finaled | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Final | 8/24/2011 | 8/25/2011 | 8/25/2011 | P | NR |
Mike Jordan
|
|
|
steve - please call 1/2 hr prior Phone #: ###-####. Needs fire/life/safety final.
|
BLD-Framing/Rough-in | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PASS |
Mike Jordan
|
|
|
call when on way//Nacho Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/10/2011 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2011 | | DONE |
Tisha Gallop
|
|
|
Jerry Weaver from Idaho Power called. I told him fee due, need GC form signed and estimated electrical value.
|
Plan assigned to (TLW) | 2/25/2011 | | 3/4/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/25/2011 | | 3/4/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with redline for dual level switching. TLW
|
Routing - FIRE | | | 3/4/2011 | | PASS |
Tim L. Woodard
|
|
|
FIELD VERIFY
|
Case Summary (BLD) | | | 3/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 3/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
called Tim Miller/CTA Arch. and told him permit is ready, fees, and need electrical value and GC/form/rce/t.
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 2/25/2011 | | | |
|
|
|
|