BLD-Final | 3/28/2012 | 3/28/2012 | 3/28/2012 | A | PASS |
Jim Storey
|
|
|
final ok
|
Permanent Occupancy | | | 3/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval | 3/20/2012 | 3/20/2012 | 3/20/2012 | | DONE |
Andrea Tuning
|
|
|
OK to issue final occupancy per Hal Simmons.
|
BLD-Aging Inspection | 2/20/2012 | 2/20/2012 | 2/21/2012 | | PEND |
Jim Storey
|
|
|
Per the request/approval of Andrea Tuning-- see attached email in scanned documents
|
Temporary Occupancy | 12/30/2011 | 3/29/2012 | 12/30/2011 | | DONE |
Barbara Stitt
|
|
|
Per the request/approval of Andrea Tuning-- see attached email in scanned documents//12/30/11 BAS
|
BLD-Aging Inspection | 12/21/2011 | 12/21/2011 | 12/21/2011 | | DEFR |
Jim Storey
|
|
|
P&Z failed and time line is under hal and bruce as to working with the aproval. bld final ok upon resalution.
|
Temporary Occupancy | 11/15/2011 | 11/15/2011 | 11/15/2011 | | DONE |
Barbara Stitt
|
|
|
Temp occupancy is approved for 30 days per request of Andrea Tuning as customer is working with Hal and Bruce to resolve some issues. Extended to 12-16-11
|
Routing - PLANNING | 11/4/2011 | | 11/4/2011 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not met the terms and conditions of the Design Review approval. The applicant is required to plant 11 Class II street trees within a turf grass planter. The applicant is also required to provide a Class II street tree and low growing shrubs or ground cover in each parkign lot planter island. To recieve DR sign off, the applicant must modify the plans to reflect these requirements. ANT
|
BLD-Aging Inspection | 10/17/2011 | 10/17/2011 | 10/17/2011 | | PASS |
Jim Storey
|
|
|
c/n made ok pending p$z sign off.
|
Zoning Approval Temp | 9/26/2011 | 9/26/2011 | 9/26/2011 | | DONE |
Andrea Tuning
|
|
|
The applicant is continuing to progress and has been granted a 90 temporary occupancy which will expire on Monday November 14, 2011.
|
Change Expiration Date Only | | | 8/19/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 8/16/2011 | 8/16/2011 | 8/16/2011 | | PASS |
Jim Storey
|
|
|
Approved temp occupancy extension for 30 days-see scanned document
|
Temporary Occupancy | 8/11/2011 | 9/11/2011 | 8/11/2011 | | DONE |
Andrea Tuning
|
|
|
Approved temp occupancy extension for 30 days-see scanned document
|
BLD-Aging Inspection | 6/16/2011 | 6/16/2011 | 6/16/2011 | | DEFR |
Jim Storey
|
|
|
temp p$z
|
Temporary Occupancy | 6/15/2011 | 8/10/2011 | 6/15/2011 | | DONE |
Andrea Tuning
|
|
|
Temp Occupancy extension approval till 8-11-11 see scanned documents//BAS
|
Zoning Approval Temp | 6/14/2011 | 6/14/2011 | 6/14/2011 | | PASS |
Andrea Tuning
|
|
|
The applicant was provided a 90 temporary occupancy to install the site improvements. The applicant has been unable to install the improvements at this time. Staff is willing to allow the applicant an additional 60 days complete the required improvements.
|
Case Summary (BLD) | | | 4/21/2011 | | |
|
|
|
|
BLD-Final | 3/11/2011 | 3/14/2011 | 3/14/2011 | A | PASS |
Jim Storey
|
|
|
Darel Phone #: ###-#### need ramp at north exit door to meet threashold height.
|
FIRE-Final Inspection | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Zoning Approval Temp | 3/11/2011 | 3/11/2011 | 3/11/2011 | | PASS |
Andrea Tuning
|
|
|
The applicant has posted a bond in the amount of $17,060 for landscape improvements. The appllicant will be required to complete the improvements and have them inspected before a permanent occupancy is issued and the bond is returned. This temporary approval is for 90 days.
|
FIRE-Final Inspection | 3/7/2011 | 3/7/2011 | 3/10/2011 | P | FAIL |
Forrest France
|
|
|
Provide current annual inspection on the existing fire sprinkler system, need to install exit signs and approved door hardware at warehouse exits per plan review red-lines, existing fire alarm panel must be operational, post "door to remain..." signage at the main entry/exit, obstructions to pendent sprinklers at the office area incuding the water heater enclosure and communications closet to be removed. Any modifications necessary to the fire sprinkler or alarm system shall require a permit- see issued documents for details. Inspection notes dated 3/7 PM.
|
BLD-Final | 3/7/2011 | 3/8/2011 | 3/8/2011 | A | NR |
Tom Arcoraci
|
|
|
still need zoning sign off//Darel Phone #: ###-#### needs p and z
|
Print Occupancy Form | | | 3/7/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 3/7/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/7/2011 | | DONE |
Tisha Gallop
|
|
|
called Darel and told him permit is ready.
|
Issue PAID IN FULL permit | | | 3/7/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 3/2/2011 | | 3/4/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/4/2011 | | 3/4/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 3/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 3/4/2011 | | 3/4/2011 | | PASS |
David Moser
|
|
|
Spoke with David Moser. He wants a signoff on this occupancy for planning due to CUP10-00048 attached to weigh scale permit BLD10-02818. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 2/28/2011 | 2/28/2011 | | DONE |
Darla L Downs
|
|
|
|
First Notice | | 4/7/2012 | | | |
|
|
|
|