Second Notice | | 5/20/2011 | 5/25/2011 | | DONE |
|
|
|
|
First Notice | | 5/2/2011 | 5/10/2011 | | DONE |
|
|
|
|
BLD-Final | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
Please call 1/2 hour prior upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
|
Permanent Occupancy | | | 4/22/2011 | | |
|
|
|
|
FIRE-Final Inspection | 4/20/2011 | 4/21/2011 | 4/21/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/20/2011 | 4/20/2011 | 4/20/2011 | A | FAIL |
Troy Cobbley
|
|
|
The exit sign failed to switch to battery backup when tested. Per Darren the hole in the wall that provides access to the area over the patio area will be patched.
|
FIRE-Conference | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | DONE |
Troy Cobbley
|
|
|
Darren and I discussed storage arrangements.
|
BLD-Energy code compliance | 3/15/2011 | 3/15/2011 | 3/15/2011 | A | PASS |
Jim Sly
|
|
|
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett
|
BLD-Framing/Rough-in | 3/14/2011 | 3/14/2011 | 3/14/2011 | P | PASS |
Jim Sly
|
|
|
Please call 1/2 hour prior upon arrival, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett
|
Issue PAID IN FULL permit | | | 3/14/2011 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 3/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/11/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told Bob Camp that permit is ready and fees due on 3-11-11 @ 8:25am//BAS
|
Plan assigned to (CDM) | 3/1/2011 | 3/1/2011 | 3/10/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/1/2011 | | 3/10/2011 | | PASS |
Carl D Madsen
|
|
|
Corrected lighting compliance requested from Habitec. 3-10-11 CDM
|
Routing - FIRE | | | 3/10/2011 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 3/10/2011 | | FAIL |
|
|
|
Corrected lighting compliance requested from Habitec. 3-10-11 CDM
|
Case Summary (BLD) | | | 3/10/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2011 | | |
|
|
|
|
Print Occupancy Form | | | 3/10/2011 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/1/2011 | | DONE |
|
|
|
Ok per Carl Madsen for level 2 intake
|
Recd Pcfee & Taken To Pln CK | | | 3/1/2011 | | DONE |
|
|
|
|
Application received | | 2/28/2011 | | | |
|
|
|
|