Permit Information
Permit NumberBLD11-00390
StatusFinaled
Name MARK H BOWEN CMS
Site Address 5305 W IRVING ST
Project NameSIMPLOT GREENHOUSE ADDITION
Customer Number 
ePlanReviewNo
Description
Simplot Greenhouse Addition- To construct a new 6,790 square foot, one story, office and greenhouse addition on the west side of an existing 4,320 square foot, one story greenhouse building. The addition is constructed of pre-engineered metal building with metal roofing and siding at the office portion of the building and polycarbonate roof and wall panels at the greenhouse portion of the building. There is an insulated metal stud wall with store front glazing separating the office from the greenhouse. The addition will include a 1,895 sq. ft. office on the north end, a 650 sq. ft. headhouse between the office and greenhouse, a 3,235 sq. ft. greenhouse and a 650 sq. ft. bug screen area at the south end of the addition. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/6/2012 DONE
Third Notice 12/21/201112/12/2011 DONE
Third Notice 11/26/201112/7/2011 DONE
faxed
Second Notice 11/17/201111/21/2011 DONE
First Notice 10/22/201111/7/2011 DONE
PubWorks Occupancy Approval10/14/201110/14/201110/14/2011 DONE
DetailsTiffany Lowery
Permanent Occupancy  10/12/2011 DONE
BLD-Final9/13/20119/14/20119/13/2011APASS
DetailsTom Arcoraci
mark please call before going out as he needs to be there. Phone #: ###-#### ok for perm occ when others sign perm
FIRE-Final Inspection9/9/20119/9/20119/9/2011APASS
DetailsForrest France
BLD-Final9/9/20119/9/20119/9/2011PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Framing/Rough-in7/18/20117/18/20117/18/2011PPASS
DetailsTom Arcoraci
Approved Plans on site in greenhouse. Insulation and drywall due to start Tuesday morning. Call me with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Conference6/14/20116/14/20116/14/2011PPASS
DetailsTom Arcoraci
Ask for Kevin. The subject is the methodology of installing the roof panels, liner panels and insulation so as to not circumvent the energy code inspection process. Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Foundation5/25/20115/26/20115/26/2011APASS
DetailsTom Arcoraci
We would prefer late morning around 11:00 if that is possible.

Thank you Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Footing5/17/20115/18/20115/18/2011PPART
DetailsMike Jordan
>> Inspection requested via web by Mark Bowen. inspected by 408.
BLD-Footing5/13/20115/16/20115/16/2011ACANC
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Mark Bowen Inspection cancelled from web by: Mark Bowen
Issue PAID IN FULL permit  5/13/2011 DONE
DetailsTisha Gallop
Routing - FIRE5/12/2011 5/12/2011 PASS
DetailsScott Arellano
Attached revised IFC comments to plans
Routing - PLAN CHECK5/12/2011 5/12/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  5/12/2011 DONE
DetailsJohn Menard
Print Occupancy Form  5/12/2011 DONE
Permit Ready to Issue  5/12/2011 DONE
DetailsChristina Prado
Telephone call  5/12/2011 DONE
DetailsChristina Prado
Called and spoke with Dana from insight Architects. Advised he needed Rp and ACHD letter prior to issuance. Also gave fees due
Routing - PLAN CHECK4/29/2011 5/12/2011  
DetailsJohn Menard
Plan assigned to (JCM)3/2/2011 5/12/2011 PASS
DetailsJohn Menard
Plan resubmittals received  5/11/2011 DONE
Received 1 transmittal, and 2 copies of sheet AS.1 sent to John M.
Meeting  5/6/2011 DONE
DetailsScott Arellano
*5/5//11* The Fire Marshal has evaluated the location for the proposed building and concurs that the requirements of IFC section 503.1.1 will be required for this building. The architect has been in contact with the Fire Marshal and has indicated his intention of submitting a revised site plan which will meet this requirement; by extending FD roadways to within 150 feet of all exterior portions of the proposed commercial building.
Telephone call  5/3/2011 DONE
DetailsScott Arellano
Spoke with Dana Kaufman regarding remaining resubmittal item pertaining to the required FD access roadway extending to within 150 feet of the furthest exterior portion of this unsprinklered building.
Telephone call  5/3/2011 DONE
Requested onsite evaluation by the Boise City Fire Marshal.
Plan Reviewer's activity  4/29/2011 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions and resubmittals. JCM
Routing - FIRE4/29/2011 4/29/2011 FAIL
DetailsScott Arellano
Not all resubmittal items addressed by Architect. Faxed and emailed remaining resubmittal item to architect for plan correction.
Routing - PLAN CHECK3/30/2011 4/29/2011 PASS
DetailsJohn Menard
Plan resubmittals received  4/26/2011  
DetailsBarbara Stitt
Received 1 copy of transmital letter, 1 copy of letter to Scott Arellano dated 4-18-11 from Dana Kaufman, 1 copy of letter to John Menard dated 4-18-11 from Dana Kaufman, 1 copy of letter to Jason Blais dated 4-18-11 from Dana Kaufman, 2 copies of supplemental structural Calcs, suplemental truss calcs, Structural review response comments, thermaglas calcs, thermaglas report, 2 copies of sheets A0.1, C1.0, AS.1, A2.0, A2.1, A3.0, A5.0, A7.1, A7.2 inserted by architects office and taken back to John Menards desk.
Routing - FIRE3/28/20113/28/20113/30/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  3/30/2011 FAIL
Failed Structural, Plan Check, Fire
Route to Impact Fee Review3/28/20113/31/20113/28/2011 PASS
DetailsCindy M. Gould
Plan resubmittals requested  3/28/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK3/10/2011 3/28/2011 FAIL
DetailsJohn Menard
Route to Impact Fee Review3/2/20113/7/20113/16/2011 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL3/2/2011 3/10/2011 FAIL
DetailsJohn Menard
Called Action Couriers for pick up on 3-2-11 @ 2:10pm - Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING3/9/2011 3/10/2011 PASS
DetailsJosh Wilson
DRH10-006268-Josh Wilson
Plan resubmittals requested  3/10/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLUMBING3/4/2011 3/9/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS3/2/2011 3/4/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment3/4/2011 3/4/2011 PASS
DetailsSteven Webb
ESC11-00097 plan approved per the attached conditions.
Routing PW Drainage3/3/2011 3/4/2011 PASS
DetailsBrian Murphy
Routing PW Sewer Rating3/4/2011 3/4/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing3/3/2011 3/3/2011 PASS
DetailsTerry Records
Address was changed from 5369 to 5305
Application received 3/2/20113/2/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/2/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/2/2011 DONE
DetailsBarbara Stitt
Routing - PLANNING Land Div3/2/2011 3/2/2011 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Pending Assignment by JCM3/2/2011 3/2/2011 DONE
DetailsJohn Menard