BLD-Final | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | PASS |
Tony Young
|
|
|
pat ; Phone #: ###-####
|
DOC - Permit Finaled | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Tony Young
|
|
|
l of c issued
|
BLD-Energy code compliance | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/12/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####,,, frame ok now,, ok to insulate,, needs energy code inspection
|
BLD-Framing/Rough-in | 5/10/2011 | 5/10/2011 | 5/10/2011 | P | PART |
Tony Young
|
|
|
kevin Phone #: ###-####,, correction notice posted,, ok to insulate
|
BLD-Foundation | 3/15/2011 | 3/15/2011 | 3/15/2011 | P | PART |
Tony Young
|
|
|
dane Phone #: ###-####
|
BLD-Foundation | 3/14/2011 | 3/15/2011 | 3/15/2011 | A | PART |
Tony Young
|
|
|
dane Phone #: ###-####,, work in progress
|
BLD-Footing | 3/14/2011 | 3/14/2011 | 3/14/2011 | P | PASS |
Tony Young
|
|
|
dane Phone #: ###-####
|
Routing Walk-In (BLD) | 3/7/2011 | 3/7/2011 | 3/7/2011 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/7/2011 | 3/7/2011 | 3/7/2011 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 3/7/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 3/7/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2011 | | |
|
|
|
|
1st review completed | | | 3/7/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2011 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/2/2011 | 3/2/2011 | 3/2/2011 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/2/2011 | 3/2/2011 | 3/2/2011 | P | FAIL |
Perry Paine
|
|
|
need more information. checklist completed, need stair section detail and engineering to match the plan drawings.
|
Application received | | 3/2/2011 | | | |
|
|
|
|