Information based on query as of Saturday, July 6, 2024.
Permit Information
Permit NumberBLD11-00395
StatusFinaled
Name REISNER PATRICIA A
Site Address 2114 N 23RD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 734s.f. to an existing 864s.f. 2-story single family dwelling. The project will also include the construction of a new 384s.f. accessory structure. Separate electrical, plumbing, mechanical and ESC permits are required. R-1C ok per Colleen Carroll. All per the approved plans as marked Energy prescriptive componant approach; the engineers calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/3/20118/4/20118/4/2011APASS
DetailsTony Young
pat ; Phone #: ###-####
DOC - Permit Finaled8/4/20118/4/20118/4/2011PPASS
DetailsTony Young
l of c issued
BLD-Energy code compliance5/16/20115/17/20115/17/2011APASS
DetailsTony Young
Kevin Phone #: ###-####
BLD-Framing/Rough-in5/12/20115/12/20115/12/2011PPASS
DetailsTony Young
Kevin Phone #: ###-####,,, frame ok now,, ok to insulate,, needs energy code inspection
BLD-Framing/Rough-in5/10/20115/10/20115/10/2011PPART
DetailsTony Young
kevin Phone #: ###-####,, correction notice posted,, ok to insulate
BLD-Foundation3/15/20113/15/20113/15/2011PPART
DetailsTony Young
dane Phone #: ###-####
BLD-Foundation3/14/20113/15/20113/15/2011APART
DetailsTony Young
dane Phone #: ###-####,, work in progress
BLD-Footing3/14/20113/14/20113/14/2011PPASS
DetailsTony Young
dane Phone #: ###-####
Routing Walk-In (BLD)3/7/20113/7/20113/7/2011PDONE
DetailsPerry Paine
Plan assigned to (PEP)3/7/20113/7/20113/7/2011 PASS
DetailsPerry Paine
1st review completed  3/7/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/7/2011 DONE
Permit Ready to Issue  3/7/2011 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  3/7/2011 DONE
DetailsBarbara Stitt
Case Summary (BLD)  3/7/2011  
Inspection Record Card- Bld  3/7/2011  
1st review completed  3/7/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/7/2011  
Routing Walk-In (Zoning)3/2/20113/2/20113/2/2011PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)3/2/20113/2/20113/2/2011PFAIL
DetailsPerry Paine
need more information. checklist completed, need stair section detail and engineering to match the plan drawings.
Application received 3/2/2011