Third Notice | | 12/21/2011 | 1/3/2012 | | DONE |
|
|
|
|
Third Notice | | 11/26/2011 | 12/7/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 11/17/2011 | 11/21/2011 | | DONE |
|
|
|
|
First Notice | | 11/6/2011 | 11/7/2011 | | DONE |
|
|
|
|
BLD-Final | 10/27/2011 | 10/27/2011 | 10/27/2011 | P | PASS |
Mike Jordan
|
|
|
Shane Phone #: ###-####. ok for perm. occ.
|
FIRE-Final Inspection | 10/27/2011 | 10/27/2011 | 10/27/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Print Occupancy Form | | | 10/27/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/27/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Conference | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | DONE |
Troy Cobbley
|
|
|
While performing a sprinkler inspection I noticed that the exterior door hardware does not meet chapter 10 of the IBC and IFC. I spoke to shane about options. It also does not appear that exit discharge lighting has been installed as required per the building plan review comments.
|
BLD-Framing/Rough-in | 8/1/2011 | 8/2/2011 | 8/2/2011 | A | PASS |
Tom Arcoraci
|
|
|
Shane Phone #: ###-####
|
Print Occupancy Form | | | 8/1/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/1/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/1/2011 | | DONE |
Tisha Gallop
|
|
|
called Stan Cole and told him plan mod ready and fees.
|
Reopen Permit (ISS) | | | 8/1/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/29/2011 | | 7/29/2011 | | PASS |
Tim L. Woodard
|
|
|
Recieved emailed fix to detail c on sheet A3.0. Revised detail shows compliant work counter next to range. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 7/11/2011 | | 7/15/2011 | | FAIL |
Tim L. Woodard
|
|
|
Need compliant work space next to stove. Sent architect an email with old report indicating the same corrections. TLW
|
BLD-Framing/Rough-in | 7/11/2011 | 7/12/2011 | 7/12/2011 | A | NR |
Mike Jordan
|
|
|
Shane Phone #: ###-####. Called contractor to notify him that plan resubmitals have been received by plan reviewer. Neesd to have resubs approved prior to completion of framing inspection and cover.
|
Plan Modification Accepted | | | 7/11/2011 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld11-00406 (Developmental Services) to provide ADA accessibility to casework; submitted on plan sheets A0.0, A0.1, A2.0, A2.1, A2.2, A2.3, A3.0, A4.0, A5.0, A6.0; routed to Tim Woodard.
|
BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/8/2011 | P | PART |
Mike Jordan
|
|
|
shane Phone #: ###-####. Interior wood framed walls. Needs to foam seal top plates. Also clarified with Tim woodard that rated corridors were not required due to installation of quick response heads on fire sprinklers. Did note to to shane with jayo const. that architect needs to resubmit breakroom pland s for approval.
|
FIRE-Sprinkler Rough-in | 6/27/2011 | 6/27/2011 | 6/28/2011 | A | PART |
Forrest France
|
|
|
See approved fire sprinkler permit plans for annotations.
|
BLD-Conference | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | DONE |
Mike Jordan
|
|
|
shane Phone #: ###-####
|
Routing - PLAN CHECK | 3/29/2011 | | 3/29/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved, however, a plan modification will be required to show a compliant break room kitchen. Redlines and notes on plan review report reflect conditions of approval. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 3/29/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/29/2011 | | DONE |
Tisha Gallop
|
|
|
called Stan Cole and told him permit is ready and fees.
|
Issue PAID IN FULL permit | | | 3/29/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 3/4/2011 | | 3/29/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 3/24/2011 | | |
Barbara Stitt
|
|
|
Recieved 2 copies of responce letter, 2 copies of sheets A0.0, A2.1, A2.3, A3.0, A4.0 and inserted into plans by architects office and then returned to Tim Woodards desk
|
Routing - PLAN CHECK | 3/8/2011 | | 3/22/2011 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
1st review completed | | | 3/22/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 3/8/2011 | | 3/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 3/4/2011 | | 3/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/7/2011 | | 3/7/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 3/4/2011 | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/4/2011 | | DONE |
Tisha Gallop
|
|
|
|